Loading...
HomeMy WebLinkAboutFILED DENSITY TEST/65-0791 ederal Phone:954-784.2941 SCANNED FILE E-Fax:954-784-7875 gineering admin@fed-eng.com BY www.fed-eng.com esting, 1hdxrd 1Florida 33334 Field Density Tests of Compacted Soils Method D-6938 Project Proposed Residence Lot 56, Creekside Date: November 19, 2018 Addres : 8712 Cobblestone Drive, Fort Pierce, FL Order #: 18DR1032 Area T sted: Building Pad Permit #: — Materi ', Type: Brown Sand with Traces of Rock & Shell Tech: BK Client. D.R._ Horton, Inc. Addres 1430 Culver Drive NE Compaction Req.: Palm Bay, FL 32907 Proctor Method: 95% ASTM D-1557 Test # TEST LOCATION Probe Depth p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 C nter of Building Pad 12" FL 8.3 107.2 . 109.4 14.0 98.0% Yes 2 1SI Corner of Building Pad 12" FL 1 9.7 108.3 1 109.4 14.0 99.0% Yes 3 NE Corner of Building Pad 12" FL 9.0 107.0 109.4 14.0 97.8% Yes 4 5 6 7 CLY 8miriv I 4 ci 7018 9 nartMimt 10 ct, Lucie County, L 11 12 13 14 pHN Re Legend fc PR = Pro( SL = Sprii SG = Sub BC = Bas TOP = To As a mutual conclusions material only The results i proposed str suitability of work. 1 VV. VVVV^Y � Elevation: / 2�, � I `roll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: gline FL = Final Lift Keith LeBlanc, Pi ' �`.� rade BG =Below Grade Federal Engineering$' course BOF = Bottom of Footing Florida Reg. No. 59394'•,y, 10HAL of Pipe FG = Finished Grade Certificate of Authorization notection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, r extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. not preclude or guarantee that future settlement and cracking will not occur. A soil boring test Is required to certify that the underlying soils will support the oture without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the ie underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this IF