Loading...
HomeMy WebLinkAboutROOF PROPOSAL CONTRACT„IASIMO CONSTRUCTION INC 3906 NW 90th Ave Sunrise Fl, 33351 (954) 701-7425 CG 11 1101548 brad@masimoconstmction.com Roof Proposal/Contract Name (s, Jodi Williams To: job Na e: Shingle to Metal Re -roof Date July 6, 2018 ,lob 1435 Copenhaver Rd Fax # N/A Addrer Ft. Pierce 34945 Phone 1�54 625-9084 Cell 954.701.7425 E-mail: Joshzebrowski@gmail.com We her y submit specifications and estimates for the above referenced address: SCOPE OF WORK Re -Roof - CCC1328033 Page 1 job # 2018-1435-2005 Date of Plans N/A Architect N/A ➢ Remove existing roof to the deck and broom clean on both buildings on property ➢ Install up to 10 sheets of 4 X 8 CDX plywood (Additional sheets billed at $60/sheet) ➢ Replace up to 50 1/f of fascia (Additional feet charged at $4/foot) ➢ Re -nail deck using 8D 2''/2” Ring Shank coil nails ➢'' Install synthetic underlayment POLYSTICK TU MAX ➢ Install valley metal to valleys and fasten using 1 '/4" Ring Shank coil nails Install all roof metal including 3 X 3 drip edge and hip and ridge metal Install plumbing vents (new) and boots for penetrations Install 5V metal to manufacturer's specifications Remove flat roof material to the deck and broom clean Install Modified Peel and Stick flat roof material on both patio roofs Clean site daily 'otal ost - . 25 000.00 — Twenty Five Thousand and 00/100------- ----------------------------------------------- --- *Waz ty: Lifetime limited manufacturer's Warranty / Five (5) year contractor workmanship warranty *All ices include applicable state and federal taxes *All ices include all materials and labor I 100/a Pue at signing ($2,500.00) FILE 40% ue when permit is obtained ($10,000.00) COPY 400/ ue at "Dry In" ($10,000.00) 10% ue upon final inspection (2,500.00) Any Iteration or deviation from above specifications involving extra costs will be executed only upon written order, and will become an eta charge over and above the estimate. All agreements contingent upon weather, strikes, accidents, or delays beyond our control. Resp'&tfully Submitted: Note -this proposal may be withdrawn by us if not accepted within 30 days. 7 C� Date: ` SIMO CONSTRUCTION INC. L by, Signature X b darm,0 J Date: /_q//