Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTPERMIT BUILDER PEST CO PEST CO SCANNED BY 'St. Lucie Can* Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT . JOB CONTRACTOR: (L. DRESS: OL CONTRACTOR: H casS OL LICENSE #:_, IN �39 We, the un ersigned, hereby certify that we have pretreated the above described construction for subterrane n termites in accordance with the standards of the National Pest Control Association. LinPhr ' feet if area treated: %lib Chemicals used: Zr—c—C—� Percentage of solution: J ?�3�lo Total gallons used: Z— Oat e 'of'Tre tment: ' 3/ql � Time of Treatment: /? : ac) Foote g Slab 1"Treatment lst Treatment Re -Treat Re -Treat Drive ay Pools / �1't Treatment 1st Treatment I -Re-Treat Re -Treat e 1st Treatment Perimeter for Final Inspection _::Re -Treat g 311�/iure of Exterminator Date Note; Themust be a completed form for site to be pi e�required treatment or re -treatment and this form must be on the job ed up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged, FBC104.2.6 Certificate of protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a py for the person the permit is issued to and another co for the buildin g Permit file, The Treatment Certificate s��{{P6/l provide the product used, identity of the applicator, time and date of the treatments,site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of Protective tratment. If the soil chemical barrier method for termite prevention is used, Tina/exterior treatment shall be complete prior to final building approval. St Lucie C unty requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2b,14