Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTRECEIVED Q ederal BY JAN � 2 �: � �� s4- �s P . i� ()u"�„ FIES'.4d 4esting, g�neer�n. lc�o�www.fed-eng.com Inc. • Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 44, Creekside Date: January 15, 2019 Address: 8749 Cobblestone Drive; Fort Pierce, FL Order #: 19DR044 Area Tes . d: Building Pad Permit ISO `1 ' 07!U Material 'hype: Light Brown Sand with Traces of Rock Tech: BK Client. D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: D!mIm Row M ngam Proctor Method: 95% ASTM D-1557 Dry. Density ; PCF Proctor; . . Value PCF -Optimum- Moisture % Compaction Pass Test # TEST LOCATION Probe Depth Elev. Moist o � 1 1 Ce I er of Building Pad. 12" . FL 6.3 108.3 '111.0 12.0 97.6% Yes 2 1 NW Corner of Building Pad 12" FL 8.4 108.9 , 111:0 12.0 98.1 % Yes 3 ISE &mer of Building Pad, 12" FL 6.9 108.0 111.0.. 12.0 97.3% Yes 4 5 6 7 8 9 10 11 12 13 14 ``���1111111 / i Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This Is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Ca ci Legend fo Elevation: = .' PR = Proo roll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: /} ' 0 f SL = Sprl I One FL = Final Lift Keith LeBlanc, P.E- ,p % qpF ` % SG = Sub rade BG = Below Grade Federal Engineering * Inc. � w BC = Base course BOF = Bottom of Footing Florida Reg, No. 593Ji1A tAj • bRIDA, �� �`� TOP = To of Pipe FG Finished Grade Certificate of Authorizatidn, OAG� As a mutua(I rotection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for PobIIgV9q pi e1Jtements, conclusions b extracts from or regarding our reports Is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. A densilt I does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed.structure. The results do not preclulge or guarantee that future settlement and cracking will not occur. A soil boring test Is required to certify that the underlying soils will support the proposed structure without settle ant. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to suppo}� the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 r /e,07 — 07 5'/ Phone: 954.784 2941 E-Fax: 954-784-7875 Project: Address: Area Tes Material lineering R�w=e 0 1sting, Inc. Field Density Tests of Compacted Soils Method D-6938 Proposed Residence _ _ Lot 44, Creekside Date: January 15, 2019 8749 Cobblestone Drive, Fort.Pierce, FL Order #: .19DR044 1: Building Pad Permit #: )e: Light Brown -Sand with Traces of Rock Tech: BK Client: D.R. Horton, Inc. Address: 1430.Culver_ Drive -NE Palm Bay, FL 32907 Compaction Req.: Proctor Method: 95% ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moiosture /o Compaction Pass 1 Cent r of Building Pad 12" FL 6.3 108.3 111.0 12.0 97.6% Yes 2 NW 1 orner of Building Pad 12" FL 8.4 108.9 111.0 12.0 98.1 % Yes 3 SE Iner of Building Pad 12" FL 6.9 108.0 ; 111.0 12.0 97.3% Yes 4 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil earinc +Capaclty., Legend forElevation: PR = Proofr o II 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: e SL = Springl a FL = Final Lift Keith LeBlanc, P.-.E., ` SG = Subgr de BG = Below Grade Federal Engineering & Testing .1h . BC = BaseciJurse BOF = Bottom of Footing Florida Reg. No. 59394 TOP f Pipe FG = Finished Grade Certificate of Authorizatior, #5'471. As a mutual pr tection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorzation for publication of stater6pts, conclusions or d Ktracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of tha tested)layer of material only. A density oes not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the,oro{ used structuretTfie esults do not preclude r guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will it ppo�, thz proposed structure without settlem t. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate"the suiia' ilify of tii underlying soil to support t i, proposed structure. After laying dormant for a period of W days or after heavy rain/storms, retesting must be performed on this work." f ( I ! PAGE 1 of 2 Compacted Soils Method D-6938 Disclaimer i Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In, no way shall a compaction test replace a soil bearing capacity, determination. A soil boring test must be performed by" the. client: prior to construction to verify subsoil conditions. Our scope of services only included testing jthe top 12" of added fill material.' FET was not contracted to perform supervision of the building pad preparation. This testing _of the. added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed_ structure -without settlement. This density compaction test does not warranty any underlying soil -materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we -recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of -the soil materials is not part of the scope of services. If environmental analysis of thel soils is required, we can,provide a`proposal for performing an environmental analysis of the soil materials. The scope of services is for determination I of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of. the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of, clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2