Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 44, Creekside Date: January 15, 2019
Address: 8749 Cobblestone Drive; Fort Pierce, FL Order #: 19DR044
Area Tes . d: Building Pad Permit ISO `1 ' 07!U
Material 'hype: Light Brown Sand with Traces of Rock Tech: BK
Client. D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.:
D!mIm Row M ngam Proctor Method:
95%
ASTM D-1557
Dry.
Density ;
PCF
Proctor; .
. Value
PCF
-Optimum-
Moisture
%
Compaction
Pass
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
o �
1 1
Ce
I er of Building Pad.
12" .
FL
6.3
108.3
'111.0
12.0
97.6%
Yes
2 1
NW
Corner of Building Pad
12"
FL
8.4
108.9 ,
111:0
12.0
98.1 %
Yes
3
ISE
&mer of Building Pad,
12"
FL
6.9
108.0
111.0..
12.0
97.3%
Yes
4
5
6
7
8
9
10
11
12
13
14
``���1111111 /
i
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This Is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Ca ci
Legend fo Elevation: = .'
PR = Proo roll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: /} ' 0 f
SL = Sprl I One FL = Final Lift Keith LeBlanc, P.E- ,p % qpF ` %
SG = Sub rade BG = Below Grade Federal Engineering * Inc. � w
BC = Base course BOF = Bottom of Footing Florida Reg, No. 593Ji1A tAj • bRIDA, �� �`�
TOP = To of Pipe FG Finished Grade Certificate of Authorizatidn, OAG�
As a mutua(I rotection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for PobIIgV9q pi e1Jtements,
conclusions b extracts from or regarding our reports Is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material
only. A densilt I does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed.structure. The results
do not preclulge or guarantee that future settlement and cracking will not occur. A soil boring test Is required to certify that the underlying soils will support the proposed structure
without settle ant. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
soil to suppo}� the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2
r
/e,07 — 07 5'/
Phone: 954.784 2941
E-Fax: 954-784-7875
Project:
Address:
Area Tes
Material
lineering R�w=e
0
1sting, Inc.
Field Density Tests of Compacted Soils Method D-6938
Proposed Residence _ _ Lot 44, Creekside Date: January 15, 2019
8749 Cobblestone Drive, Fort.Pierce, FL Order #: .19DR044
1: Building Pad Permit #:
)e: Light Brown -Sand with Traces of Rock Tech: BK
Client: D.R. Horton, Inc.
Address: 1430.Culver_ Drive -NE
Palm Bay, FL 32907
Compaction Req.:
Proctor Method:
95%
ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moiosture
/o
Compaction
Pass
1
Cent
r of Building Pad
12"
FL
6.3
108.3
111.0
12.0
97.6%
Yes
2
NW 1 orner of Building Pad
12"
FL
8.4
108.9
111.0
12.0
98.1 %
Yes
3
SE
Iner of Building Pad
12"
FL
6.9
108.0
; 111.0
12.0
97.3%
Yes
4
5
6
7
8
9
10
11
12
13
14
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil earinc +Capaclty.,
Legend forElevation:
PR = Proofr o II 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: e
SL = Springl a FL = Final Lift Keith LeBlanc, P.-.E., `
SG = Subgr de BG = Below Grade Federal Engineering & Testing .1h .
BC = BaseciJurse BOF = Bottom of Footing Florida Reg. No. 59394
TOP f Pipe FG = Finished Grade Certificate of Authorizatior, #5'471.
As a mutual pr tection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorzation for publication of stater6pts,
conclusions or d Ktracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of tha tested)layer of material
only. A density oes not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the,oro{ used structuretTfie esults
do not preclude r guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will it ppo�, thz proposed structure
without settlem t. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate"the suiia' ilify of tii underlying
soil to support t i, proposed structure. After laying dormant for a period of W days or after heavy rain/storms, retesting must be performed on this work." f ( I !
PAGE 1 of 2
Compacted Soils Method D-6938 Disclaimer i
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In, no way shall a compaction test replace a soil bearing capacity, determination. A soil boring test must be
performed by" the. client: prior to construction to verify subsoil conditions. Our scope of services only included testing jthe top
12" of added fill material.' FET was not contracted to perform supervision of the building pad preparation. This testing
_of the.
added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting
the proposed_ structure -without settlement. This density compaction test does not warranty any underlying soil -materials or
conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed
structure, we -recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying
soil conditions.
Environmental analysis of -the soil materials is not part of the scope of services. If environmental analysis of thel soils is
required, we can,provide a`proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination I of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of. the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations,
overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior
to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of, clients
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2