Loading...
HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASEFmm- 'Qk�t9�.,1r1' rW k.114P�' B6�I 5 SCANNED By St, Lode Cou8`>? ,/ Planning & Development Services Building & Code Regulation Divi§ii 2300 Virginia Ave Fort Pierce, Ft. 34982 772-462-2165 Fax 772-462-64 RECEIVED FEB ® 2019 ST. Lug i?ty� PQrmitting Request for 30-®ay Temporally Power Release Date: G/ _ d `7 /,Y • Permit Number: Project Address: THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERAATION OF APPROV REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: AL OF THE I. This temporary power release is requested for the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. Z. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement, including Building. Division Policy, which is incorporated herein by reference. 3. All conditions and requirements listed in the attached document entitled "Requirements for 30 Day Power for Testing" have been fulfilled and the premise is ready for compliance inspection. 4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason For the request. Power may be removed from the site and/or a Stop Work Order issued if the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift the Stop Work Order. NE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM %LL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT )F THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE )ISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT. .;yam .+ —%I vRC CONTRACTOR SIGNATURE DATE DATE DATE