Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST FORM:SCANNED Planning & Development ggerVi-E.CQPY` C + Building &Code RegulaficWMv!ronlQ�W ._ I'' COUNTY 2306 Virginia:Ave, Rm 201 + Fort -Pierce, FL 34982 RECELVED Phone: 772-462.-2165 Fax: 772-462=6443 . 1-91U19 BLOWER DOOR TEST. FORM . per�itt`uo� yet House Infiltration Test Certification st. Prescriptive 8nd: Performance Method Date: ( .. L .. Permit 'm. n. n Contra It r; A Job Address:.. " vQ : 6 Constr ction: ( ).New Construction. -•Complete ( )Existing ' --After. Addition House nfiltrati 'nT. st Results SLC'ClimateZone Z. CFM D Test Date: ( Q) volumJJe 4?�. Sr (� L.� ACH (50) =.CFM (50).x:60 / Volume = :. I c 1 Mechanical Ventilation required less th6n 3 ACH Passim{ results inust be &-ACH (50) ;or less "Pass ( )Fail ' FBC, En rgy. The bui ding -or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in: Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8: Testing shall be conducted'with a blowerdoor at a pressure 60.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section,553.993(5) or (Z), Florida Statutes or iridividuaIt. licensed as set forth in: Section.489..105 (3)(f), (g) or.(i).br an approv d third party. A:w[ritten report of the results of the test shall be signed by, the party conducting the testand proIAd �d .to the code official. Testing shall be performed atany time after creation of all penetrations of the building . therm envelope.. " FBC,'R sidential- I Where'the air infiltration rate of a dwelling unit is less th*an .3 a.ir..changes per hour when tested with a blower door at. a . pressu �e 'f 0.2 inch w. c. (50.Pa) in accordance with- Section R402.4:1.2 of the Florida Building Code,.Energy Conservation the dielling unit shall be provided with whole -house mechanical Ventilation in accordance with Section M1507.3. Testin I Company -- Comp any Name: .�/* Address: v dU� vwi6ity l hereby certify that the above House Infiltration results demo nstrate.compliarice. with FBC Energy Conservation requirements in accords with ection 11402.A.A.2 Climate Zone 2. Signa ure: . Printed Names &-o e/Certification lvd 7 - OBo( � p.Ly yOr�Ra�lj `DRA f—!� Date: C9L/ II Contractor: 4V Post Construction Test Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method oce,4LE COPY V9 1"Ci TO PerRiltt%n9 e G u ye t St, �u Permit #: & r r v 19-0 � Lot #: 5q Address: Satoh clJLa'J-16 tLe- Df— F1' Pl`' vC" ❑ Rough -in Test \ Test Co11 nditions: I Date: 1 Time: Indoor T�i mperature (F): Outdoor Temperature (F): Total Leak' c e Test Outside Duct Leak 'ge: ❑ Defl G (Pa) c Prop. Leak Free Test Press re: Baseline Di ict Pressure (optional) (Pa) Duct Press' (Pa) Flow Ring Fan Press Installed (Pa) Company I hereby c Section R Printed Floor Area (ft2): Primary Location of Supply Ductwork Primary Location of Return Ductwork 11P7,� Proposed On = V I. tJ J Qh = 0.01-1 Flow (cfm) Results: *P Pass ❑ Fail Total Leakage (cfm): Total Leakage per 100 sgft: rC m CFM25 x 100 divided by the CFA = Duct Leakage CFM1100 sqft. GFA International, Inc. Address: 607 NW Commodity Cove, Port St. Lucie, Florida 34986 i the above Duct Sealitg Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with 5-0 (P 2 � q� ��►� ZC� Gib-�Y\ License/Certificate#: �Q-�- v � f � ' "Y 'It. �t,� ode County Date: I -7 Contral,ltor: Job Address: Conttr u�lction: Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 RECEIVED Fort,Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 FEB 0 7 2019 BLOWER DOOR TEST FORM ST. Lucie County, Permitting House Infiltration Test Certification Prescriptive and Performance Method Permit #: [ S-y-7 - ® &o I ble Z'C6)0 00 Cg, (L 5 _ t►�� (',o New Construction — Complete el Existing ( ) Existing — After Addition House Infiltration Test Results SLC Climate Zone 2 CFM (50) = 4�_o-U' Test Date: Volum11 _ '1. a ACH (5 ) = CFM (50) x 60 / Volume = , 1 Me hanical Ventilation required less than 5 ACH PassiZ results must be & ACH (50) or less (Pass ( ) Fail FBC, En 'rgy The bui Jing or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding Z air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 111553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approv d third party. A written report of the results of the test shall be signed by the party conducting the test and provid id to the code official. Testing shall be performed at any time after creation of all penetrations of the building therm ( envelope. FBC, 11116sidential 1Nherell'the air infiltration rate of a dwelling unit is less than 5 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the 41piling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Comp lny Name: GFA International, Inc. Address: 607 NW Commodity Cove, Port St. Lucie, Florida I here) y c that the above Hous Infiltration results demonstrate compliance with FBC Energy Conservation requirpm nts n accorda� with Se ion R402.4.1.2 Climate Zone 2. Sign Printeld'(l0me rCtC'L&_("0_* Lice n1le/Ce rtificati on #: � Q v �_0(0 2 5f-5I Planning &•Development. Services.:. —, o u B ilding & Code Regulation Division 2300 Virginia Ave, Rm 201 C Fort Pierce, FL 34982 772�62-2165 Fax 772-462 6443 F E B ®7 2.,0 1 9 . FBC'ENERGY CONSERVATION CODE Permitting Duct Sealing Certification ST. Lucie County; . Prescriptive and Performance Method Date: .� ... Permit#:.1 ' p v l' .� 0 I ... . U. Lot # I Contractor 1►J ��'� Iv Address: Construction li! Post Construction Test o Rough -in Test Test Conditions:. Date: `C' . Floor Area ( ). Time: I Primary Location of.Supply Ductwork. kc, indoor (F):. .. Primary. Location of Return Ductwork Indoor T • Temperature (F)c Total Leaka4e•Test (Outside) Duct Leakage' Default o Prop Leak Free Proposed On V Baseline ure: (Pa) cfPressure-(optional)Pa Test Pres�s� . (:.) Duct Pres I (Pa) Flow Ring, ;Fan Press Flow (drn) . -Results: ❑Pass ' o. Fail ' Installed.' Total Leaka9e'(cfm): Total Leakage per 100 sgft:. ed by the = akage CFW100 sgft..' CFM25 z _100 divid CFA Duct Le Testing C mpanv . ! ' C 4 Company lame: - tY�d'i Address:, 1 her certify that the above Du t Sealing Leakage results demonstrate compliance with 5th Edition FBC Energy Conse'rVation requirements in accordance with ection ::2. Signature: Printed e: Sbl1. u S= 1/LC� �`e 1� License/Cerfificate #: ��.