Field Density Tests of Compacted Soils Method D-6938
Project: Joposed Residence'-._ ..z Lot 59, Creekside- - Date: October 5, 2018
Address: ' J1 00 Cobblestone Drive; Fort Pierce, FL Order #: .18DR887
Area Tested: Building Pad Permit #: 6 7 — 6 x
Material Typii: Pale Brown Sand with Traces of Rock Tech: - • BK
Client: Q.R. Horton, Inc.
Address: 1•430 Culver Drive NE
L?�aim Bav, FL 32907
Compaction Req.:
Proctor Method:
95%
ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
ova
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moiosture
/o
Compaction
Pass
1
Cent4lLf Building Pad
12"
FL
6.3
108.5
109.0
12.0
99.5%
Yes
2
SW Clner of Building Pad
12"
FL
1 •6.9
108.8
109.0-
12.0
99.8% '"
Yes.
3
NE Colilner of Building Pad
12"
FL
6.7
108.8
109.0 ,
12.0
99.8%
Yes
4
5
6
8
9
l
10
11
12
it
1.3
it
14
Remarks: li See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verT, ati , n ' - 3olljSearing Capacity.
Legend for evation:�L�Bl7aFl—
SLPR = Proofr II 1,2,3 = 1st, 2nd, 3rd Lift Submitted by.' = Spring ine FL = Final Lift IZeifih , E. /C
SG = Subgr de BG = Below Grade -,Federal Engineering & Testing, Inc. J
BC = Basecourse BOF = Bottom of Footing Florida Req.-No. 59394.
TOP = Top f Pipe FG = Finished Grade Certificate of authorization #a471
As a mutual p I tection to' clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization -for publication of statements,
conclusions or ' xtracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of comp6gWri of the tested layer of material
only. A density oes not replace a soil bearing capacity determination. These density tests do not certify the unJerigina soli material5'Wgw'i�e proposed structure. The results
do not preclud or guarantee that future settlement and cracking will not occur. A soil boring test is required to ceitity ih Tipa'underlyina 66its will support the proposed structure
without settlem nt. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be pefrormed to wal*uate the suitability.of the underlying
soil to support a proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must'be pitifor'med on this work.
PAGE 1 of 2
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inca°,(FET)' has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction, of the tested layer of
material only:. In no way shall a compaction test replace a' soil bearing, capacity determination. A soil boring test must be
performed by the client prior to construction to verify subsoil conditions. - Our scope of services only included testing the top
12" of added fill material. FET was not contracted to, perform -supervision of the building pad preparation. This testing of the
added fill material does, not include an analysis of the underlying soil materials to determinelf they are capable of supporting
the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or
conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed
structure, we recommend performing soil. borings below all foundation areas of the proposed structure to verify the underlying
soil conditions.
Environmental. analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing'an environmental analysis of the soil materials. -The scope of services is
for determination of the degree -of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative?t,, _be,.date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain''waters, construction activities, exc�ar ations,
overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior
to construction.
As a mutual protection to clients, the public and ourselves,- all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts, from or regarding our reports is reserved
pending written approval. .
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2