HomeMy WebLinkAboutBLOWER DOOR TEST FORMCs�"DWI
Job
Con
FBC,
The I
hour
app
pro,
FBC,
the
requ
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
Phone:772-462-2165 Fax:772-462-6443
SCANNED
St. LU BY
Cie county
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
Permit #: S-0 -7 � I �0� �y
;tor: J �
Iress: <X 7 49 e o bb 1-i? S b <'- r4 - 0�
fiction: (Y) New Construction - Complete ( ) Existing - After Addition
;e Infiltration Test Results SLC Climate Zone 2 lig
(50) = fi 0 Test Date` j�
` O .
me = 1 I /�
(50) = CFM (50) x 60 / Volume = L4 Mechanical Ventilation required less than 3 ACH
ing results must be & ACH (50) or less (P Pass ( ) Fail
Signatu
Iding or dwelling unit shall be tested and verified as having an ai.r leakage rate of not exceeding 7 air changes per
Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
!d third party. A written report of the results of the test shall be signed by the party conducting the test and
d to the code official. Testing shall be performed at any time after creation of all penetrations of the building
1 envelope.
ie air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a
of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
ing unit shall be provided with whole -house mechanical ventilation in accordance with Section MlS07.3.
Name: C r l0 07 M \4 C ' � cv ���� r-
Name: Address: �y»mp�c
'fy that the above House Infiltr tion results demonstrate compliance with FBC Energy Conservation
nts in accord Section R 0 .4.1.2 Climate Zone 2.
Printed Va,11"3 a-Sai ' La c kac
#: 2P1__[_' So& 2 Aga,
JUN 14 20i9
PerMittin9 De
St, Lucie Depart
�- 1 COunty, FL
E
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
! Prescriptive and Performance Method
r Permit* t P-7 d -7q' Lot M .q q
ictor: _ _ l"e` bl�l _ Address: �7"i ( l O JjJ� f Lft, Dr. r�.
Post Construction Test ❑ Rough -in Test
Conditions: / Q
Floor Area (ft2): d
13 v 0 Primary Location of Supply Ductwork
)r Temperature (F): Primary Location of.Return Ductwork
oor Temperature (F): 9
Du'� Leakage: V� v o Defaul a Prop. Leak Free %(Proposed On =
Test Pressure: 5 (Pa) ( _
Ba$ieline Duct Pressure (optional) (Pa)�tJA :- (�� o
Dus�t Press. (Pa) Flow Ring Fan. Press Flow (cfm) . Results: Pass ❑ Fail
II Install Pa
Total Leakage (cfm):
Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sqft.
i esting company
Com I ny Name: C__I Address: Cu �-7 FL
I here I y certify that th ove Duct Leakage resul monstrate compliance with 5"h Edition FBC Energy Conservation requirements in accordance with
Secti n R403.2.2.
Signa Ire:
Printe Name: SO �'G�-� kicense/Cedificate #: �l ) 6 2 O �2_