Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST FORMCs�"DWI Job Con FBC, The I hour app pro, FBC, the requ Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 SCANNED St. LU BY Cie county BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method Permit #: S-0 -7 � I �0� �y ;tor: J � Iress: <X 7 49 e o bb 1-i? S b <'- r4 - 0� fiction: (Y) New Construction - Complete ( ) Existing - After Addition ;e Infiltration Test Results SLC Climate Zone 2 lig (50) = fi 0 Test Date` j� ` O . me = 1 I /� (50) = CFM (50) x 60 / Volume = L4 Mechanical Ventilation required less than 3 ACH ing results must be & ACH (50) or less (P Pass ( ) Fail Signatu Iding or dwelling unit shall be tested and verified as having an ai.r leakage rate of not exceeding 7 air changes per Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an !d third party. A written report of the results of the test shall be signed by the party conducting the test and d to the code official. Testing shall be performed at any time after creation of all penetrations of the building 1 envelope. ie air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation ing unit shall be provided with whole -house mechanical ventilation in accordance with Section MlS07.3. Name: C r l0 07 M \4 C ' � cv ���� r- Name: Address: �y»mp�c 'fy that the above House Infiltr tion results demonstrate compliance with FBC Energy Conservation nts in accord Section R 0 .4.1.2 Climate Zone 2. Printed Va,11"3 a-Sai ' La c kac #: 2P1__[_' So& 2 Aga, JUN 14 20i9 PerMittin9 De St, Lucie Depart �- 1 COunty, FL E Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification ! Prescriptive and Performance Method r Permit* t P-7 d -7q' Lot M .q q ictor: _ _ l"e` bl�l _ Address: �7"i ( l O JjJ� f Lft, Dr. r�. Post Construction Test ❑ Rough -in Test Conditions: / Q Floor Area (ft2): d 13 v 0 Primary Location of Supply Ductwork )r Temperature (F): Primary Location of.Return Ductwork oor Temperature (F): 9 Du'� Leakage: V� v o Defaul a Prop. Leak Free %(Proposed On = Test Pressure: 5 (Pa) ( _ Ba$ieline Duct Pressure (optional) (Pa)�tJA :- (�� o Dus�t Press. (Pa) Flow Ring Fan. Press Flow (cfm) . Results: Pass ❑ Fail II Install Pa Total Leakage (cfm): Total Leakage per 100 sgft: CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sqft. i esting company Com I ny Name: C__I Address: Cu �-7 FL I here I y certify that th ove Duct Leakage resul monstrate compliance with 5"h Edition FBC Energy Conservation requirements in accordance with Secti n R403.2.2. Signa Ire: Printe Name: SO �'G�-� kicense/Cedificate #: �l ) 6 2 O �2_