HomeMy WebLinkAboutBLOWER DOOR TEST FORMPlanning &. Development Services
Building &.Code Regulation Division
COUNTY
2300 Vlrginia:Ave, Rm 201 :..
IF L • R I D A -Fort Pierce; FL 34982
Pho . : 772-462=2165: Fax: 772=462-6443
BLOWER:DOOR-TEST , FORM
Ouse Infiltratloh Test'Certiflcatio'n
prescriptive. and: Performance Method'.
I�Date: �: �.. ;: .. Permit
Contractor; b, .
Job Address: °67 S.. Cf� bLe-5
Construction: ( NeW.Consttuctiori -..Complete ( ):Existing -After. Addition
�:.
House Infiltration T st Results: SLC:Climate Zone 2.*
Tes
q
t Date:
volume =.' I (ei --j. :.
ACH.(50) = UIVI (50)x:66 /:Volume Mechanical Ventilation required less than 3 ACH
Passing_ results.must. be & ACH .(50) :or less (° Pass : ( ) Fail..
i
FBC, Energy
i
�he building:9r dwelling unit shall be tested andveeified as having an'air leakage: rate of not.'exceeding 1 air changes per
hour in:Climate Zone 1,:2 and 3 air changes.per hourin Climate -Zones 9:through'8; Testing shall be conducted with a.'
blower oorat.a pressure of 0.2 inches.w: g. (56.Pascals). Testing shall be conducted by either.individuals'as defined in
Sectlon.553.993(5) or (Z), Florida Statutes or iridividuals.licensed as set..forth in Section.489..105 (3)(f), (g) or (i):or an
aH..
proved third party.' A written'report of the results of the test shall be'signed by the O'ty,conducting the test and
(provided to rhe.Code.officibl: Testing.shall.be performed at'any time after creation of all. penetrations of.the building
;thermal envelope:
FBC, Residential:
jWhe're:the.air infiltration rate of. a dwelling unit.is less thari.3 a.ir..changes per hour when tested with a blower door at. a
pressure.of 0.2.inch w... (50 Pa) in.accordance'with: Section R402.4 1.2 of the Florida guilding Code, _Energy:Conservation .
;the dwelling unit shall be provided.with whole' -house -mechanical Ventilation in accordance with Section :M1507.3', .
I�Testine Company J r /� // .
Company Name: .tom /� Address: !UW CdrnaDdr: ` V, �L)
P.. Y �
I hereby certify that.the above House_Infiltration results demonstrate compliance with FBC Energy.Conservation
requiremen ri.aaoroclax6 ith Section R402.4:1.2 Climate Zone 2.
Signature: r
(�
,Printed., me: �SaSaln.. ZCeCirIGZ'v'�k:. ... .
p
License/Certification #:. �.Id
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
v l Permit #: c) co—C `-r' Lot #:
actor: �tom` Address:1 V 5 Co b6 te sq(o� R •
Y Post Construction Test
Test Conditions: LAJ�
Date: /
Time: 13S.0
Indoor Temperature (F):
Outdoor Temperature (F): —1 CQ
Duct Leakage: ❑ Default, 5 (Pa) ❑ Prop. Leak Free
Test Pressure: �;(
Baseline Duct Pressure (optional) (Pa)
❑ Rough -in Test
Floor Area (ft2):
Primary Location of Supply Ductwork
Primary Location of Return Ductwork
Duct Press. (Pa) I Flow Ring I Fan Press I Flow
Proposed On = 0 , 0
'(_�a I C)_ r7 Z 01 c7
Results:Pass ❑ Fail /'�
Total Leakage (cfm): `X 13
Total Leakage per 100 sgft: 3 r 3 G��^
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
Fasting company r Cv ��� FL
r
;ompany Name: "f` Address:
hereby certify that bove Duct S aling Leak a results demonstrate compliance with 5'h Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2"
Signature: l
�j
Tinted Nam ..SO � r--C" 1 license/Cert�cate #: t�J��L ��