-_ - -field Density Tests of Compacted Soils Method D-6938
II
Proj
ct: Proposed Residence Lot 43, Creekside
Date:
December 7, 2018
Add',
ss. 8745 Cobblestone Drive, Fort Pierce, FL
Order #:
18DR1071
Are I',
Tested: Building Pad
Permit #: 7 -
Mat
!rial Type: Dark Yellowish Brown Sand with Some Shell
Tech:
^
TS
Cliel't:
D.R. Horton, Inc.
Add'l
ss: 143% Culver Drive NE
Compaction Req.:
95%
�� Palm Bay, FL 32907
Proctor Method:
ASTM D-1557
Tesil
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NE Corner of Building Pad
12"
FL
5.9
110.8
115.0
10.5
96.3%
Yes
2
Center of Building Pad
12"
FL
7.2
112.0
115.0
10.5
97.4%
Yes
3
SW Corner of Building Pad
12"
FL
6.9
114.6
115.0
10.5
99.7%
Yes
4
51
I
61
71
8,
9',
10,1
11,
12
13,
14,
Re i'arks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity.
Lege'd for Elevation:
PR � Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted : bY
SL = pringline FL = Final Lift Keith 1=6BIanc, P.E. ry r
SG B ubgrade BG =Below Grade Federal Engineering . Testing, Inc.
BC =' asecourse BOF = Bottom of Footing Florida Reg. No. 59394
TOP Top of Pipe FG = Finished Grade Certificate of Authorization ;?5471
Asa n. itual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication,Uf statements,
conclu ions or extracts from or regarding our reports is reserved pending our written approval. A density test determines;ihe; decree of compaction cf;the.tested layer of
materi only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underiy6945oil materialialiel�w;t1Se`iiroposed structure.
The re is do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to,csrlify that the unaerying, soils will support the
propos' d structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend lttiat.soil borwr s be performed to evaluate the
suitabii of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/sto&i`s, etestSng must be performed on this
work.
PAGE 1 of 2
ti
a
i
Compacted SoNs Method ®-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must bey
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top
12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of',
the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of
supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil'
materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of
the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to
verify the underlying soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, -Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions or
other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities
excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted an(
re -tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is re
pending written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2
tp�
federal
gineering
es#ing, Inc.
Phone: 954-784-2941
E-Fax: 954-784-7875
admin@fed-eng.com
www.fed-eng.com
Field Density Tests of Compacted Soils Method D4938
ct: Proposed Residence Lot 43, Creekside Date: December 7, 2018
.ss: 8745 Cobblestone Drive, Fort Pierce, FL Order #: 18DR1071
Tested: Building Pad Permit #: At 7 ` am-
•ial Type: Dark Yellowish Brown Sand with Some Shell Tech: TS
D.R. Horton, Inc.
1430 Culver Drive NE Compaction Req.: 95%
Palm Bay, FL 32907 Proctor Method: ASTM D-1557
T6
t
TEST LOCATION
Probe
Depth
Elev.
Moist
ova
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
IN E Corner of Building Pad
12"
FL
5.9
110.8
115.0
10.5
96.3%
Yes
2
Center of Building Pad
12"
FL
7.2
112.0
115.0
10.5
97.4%
Yes
SW Corner of Building Pad
12"
FL
6.9
1 114.6
115.0
1 10.5
99.7%
Yes
l
4�
1'
FR
ffCEIVE
D
County, P
i-rnIttintt
1'
I�
1
12
13
II
14
II I
NJ0H
See Reverse Side Page 2 of 2 for Additional Information for Disclaimer ' Ices �
This is a Compaction Test only on the top 12" of the pad and Is not a verification of So e* big C c .
—C7194 '
Elevation: q ; .0 "
oil 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: e S
line FL = Final Lift Keith LeBlanc, P,E.:,
ade BG =Below Grade Federal Engineering &'�t
�� .
nurse BOF =Bottom of Footing Florida Reg. No. 59394 '•,,� 0
of Pipe FG = Finished Grade Certificate of Authorization#5471 '
otectlon to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of
density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure.
not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required, to certify that the underlying soils will support the
lure without settlement. If no soil borings have been performed to. verify the underlying soils, we recommend that soil borings be performed to evaluate the
underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed om this
PAGE 1 of 2