Request for 30-Day Temporary Power Release
6/6/2019 Permit Number:,. 18Or708.32
-,
Address: 5412 Killarney Avenue
P"ECEIVED
JUN 10 IBIS
Permitting D�Myftmenk
St. Lucie Coukty
THE ,� NDERSIGNED. HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PRO ',ERTY, FOR A PERIOD. NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
AND QUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE
RE Q EST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
1. This temporary power release is requested for the above stated purpose only, and there will be no
occupancy.of any type, other than that; permitted by construction during this time period.
2. As witness by oursignatures,. we hereby agree .to abide by all terms. and conditions of thisagreement,
including Building Division .Policy, which is incorporated herein by reference,
3. All conditions and requirements listed in the attached document entitled "Requirements for.30 Day
Power for Testing" have.. been fulfilled and the premise is ready for compliance inspection.
4. All :requests for an.extension beyond 30 days must he made in writing to the Building Official stating
the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if
the Final Inspection has not been approved within 30 days. A.fee of $100.00 will be required to lift
the Stop . Work Order.
WE H!�REBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL ABILITIES AND .CLAIMS OF ANY TYPE :OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF IS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE. INCURRED DUE TO THE
DISC NNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT.
6/6/2019
DATE
6/6/2019
DATE
6 ci��►�
DATE
St. Lucie County
Building and Zoning Department
Requirements for 30 Day Power for Testing
Form entitled "Request for 30-Day Temporary Power Release" must be fully executed and posted in
the Building Department record files prior to inspection.
Inspection Requirements:
1. Address numbers shall be posted per county Ord. No. 7.05.09.
2. All entrances, exits, windows and garage doors must be lockable.
3. All circuits on exterior shall be terminated in a box with weatherproof cover. The same applies
to a disconnect. If circuits are at or above 7'6" from grade they may be capped with wire nuts
and taped.
4. All breakers must be installed. ' Any blank space must be closed by a breaker or approved filler
plates.
5. Interior Wiring: All receptacles, light fixtures and fans must be trimmed. Any fixture below
7'6" from the floor or mezzanine that is not available at the time of inspection must have an
Inviso plate installed. Fixtures at or above that height may be capped with wire nuts and taped.
6. All smoke detectors must be installed.
7. Kitchen cabinets must be installed; any exception for special conditions or circumstances must
have an approval prior to scheduled inspection.
8. Sewer and water connections must be complete. Only well pumps are excluded from this
requirement.
9. Exterior construction must be complete and weather tight, including stucco, siding, roof and
soffit.
10. Permit work shall be substantially completed except for back orders, paint on exterior, carpet
and/or floor covering, pumps, air conditioners and driveway.