HomeMy WebLinkAboutFINISHED FLOOR CALCULATORFINISHED FLOOR CALCULATOR ALL IGHLIGHTED VALUES MUST BE PROVIDED. , STEP 1. CALCULATE MINIMUM FINISHED FLOOR ELEVATION ALLOWED BY HEALTH DEPARTMENT CONSTRUCTION PERMIT (1) BENCHMARK ELEVATION (SEPTIC PERMIT & SURVEY) `, 2 FEET (2) STUBOUT INVERT ABOVE BENCHMARK (SEPTIC PERMIT) 9. INCHES = 0.75 FEET (3) DEPTH OF FOOTING AND SLAB (FOUNDATION PLAN) 16 INCHES = 1.33 FEET P CALCULATED F.F.E. (MIN.) = 23.32 FEET Q NOTE: MINIMUM FINISHED FLOOR ELEVATION ASSUMES 6 INCHES FOR DIAMETER AND SLOPE OF BUILDING SEWER.' STEP 2. CALCULATE LOWEST GRADE POSSIBLE AT ADJACENT PROPERTY LINE" (4) ACTUAL BUILDING SETBACK FROM ADJACENT PROPERTY LINE (SURVEY) 1395`. FEET (5) MINIMUM GRADE AT ADJACENT PROPERTY LINE (CALCULATED) 17.30 FEET (6) EXISTING GRADE AT ADJACENT PROPERTY LINE (SURVEY) 2095 •'' FEET OKAY NOTE: 1. SPREADSHEET WILL NOT WORK FOR STEPPED FOOTINGS. 2. MINIMUM GRADE AT ADJACENT PROPERTY LINE ASSUMES: A. TWELVE INCHES MINIMUM COVER OVER FOOTING PER FBC. B. A 4 FOOT LEVEL AREA ADJACENT TO THE FOUNDATION FOR LANDSCAPING, EGRESS, MECHANICAL EQUIPMENT, ETC. C. A 3:1 MAXIMUM GROUND SLOPE FROM 4 FOOT LEVEL AREA DOWN TO THE ADJACENT PROPERTY LINE.