Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 12-8-18ICANNED T By Ludsa Planning & Development Services Building & Code Regulation Division a 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PER IT #: JOB ADDRESS: 4T BUI DER/CONTRACTOR: A, f s PES CONTROL CONTRACTOR: EVICT -A -BUG TERM & PEST CONTROL INC. PES CONTROL LICENSE #: JB175775 We, tlie undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Squai feet if area treated: �� Chemicals used: DOMINION 2L Perce tage of solution: .05% Total gallons used: _� Date f Treatment: &5 Jy Footina .�1s' Treatment Re -Treat 1st Treatment Re -Treat Time of Treatment: t% 5 0 0 c­Slab �r 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter for Final Inspection 1st Treatment Re -Treat / ,2lell 20k6e of Exterminator Date Note. There must be a completed form for each required treatment or re -treatment and this form must be on the job site t be picked up by the inspector at time of each Inspection or the scheduled inspection will fail and a re -inspection fee c rued. F13C1 4.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobs/te posting board shall e provided to receive duplicate Treatment Certificates as each required protective treatment is completed, pro vie "ng a copy for the person the permit is issued to and another copy for the building permit files The Treatment Cert/fi ate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treat Y, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protec live treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be co pleted prior to final building approval. St LL Je County requires for the final inspection for CO, a Permanent Sticker to be placed on the a ectrical panel box cover, listing all the treatments and dates of applications. '/24/2014