HomeMy WebLinkAboutSOILPROBE ENGINEERING` RFCF� 3931 SW 47 Ave. #104
AQ oCl Davie, Fl. 33314
SCANNED Te1:954-584-6115
S't /ry9p e.
1p BY E-mail: rcoletto@.soilprobe.net
"ecFOO, st Lode (CM W
a
v � x .
f bQEn eerie & T b
16, 2019
erican Foundation, Inc.
1 80 NW 138th St. #D6
aleah Gardens, FL 330
i
i
I
Pile Installation Certification
Proposed Residence
Lot #2
41N'MA
Fort Pierce, FL
oilprobe Engineering & Testing, Inc. has completed field observation of auger cast piles
tallation for the above referenced project. Piling operation was conducted by American
oundation corresponding to the date of April 16, 17, 18, 19, and 23, 2019 and installation
tnessed by a representative of this office. The purpose of this site inspections was to observe
d document pile installation operation only.
IItotal number of sixty two (62) piles were placed at locations staked in the field by the owner's
epresentative and to depths as indicated in the attached field inspection logs. Pile installation
data for each pile are presented in the attached field installation logs.
Following our observation of pile installation operation at the scheduled time, and our
knowledge of project documents we certify that the referenced piles were adequately installed
for achieving an allowable bearing capacity of 40 tons compression and 12 tons tension
respectively.
i
Sincerely,
Soilppbe-+ ngineering & Testing, Inc.
Wig. No 37334
Enc. Pile installation logs
Location sketch
.-..
+;t .f " F a
,� a ti,t
SD.1LP-ROBE ENGINEERING AND TESTING, INC.
1611 Auger- - a - - ire-ba�
PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
PROJECT: Load Bearing (tons)
C?Q Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,T_.r471& 4422 N Hwy A1A Misc. Info:
12 tension
Engineers Sign and Seal:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @ 4" O.C. @ top of pile and @10" O.C. @ balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
comp tension
Date: April 16, 2019
Notes
1
1
2:20
30
1.50
50
2.05
1.36
80
24
Start 7:33 Arrived 7:30
2 1
2
2:00
30
1.50
50
2.05
1.36
80
24
ADONEL #4416 9 cy
3
3
1:59
30.
1.50
51
2.09
1.39
80
24
4
4
2:32
30
1.50
50
2.05
1.36
80
24
Stop 8:20
5
5
1:48
30
1.50
48
1.96
1.31
80
24
Start 8:24 Arrived 8:18
6
6
2:12
30
1.50
50
2.05
1.36
80
24
ADONEL #4009 9 cy
7
7
2:23
30
1.56
49
2.00
1.34
80
24
8
6
2:00
30
1.50
48
1.96
1.31
80
24
9
9
2:66
30
1.50
59
2.41
1.61
80
24
Stop 9:25 Start 9:25
10
10
2:40
30
1.50
64
2.62
1.75
80
24
ADONEL #7004 Arrived 9:15
11
11
2:16
30
1.50
50
2.05
1.36
80
24
9 cy
12
12
1:45
30-
1.50
53
2.17
1.45
80
24
Stop 10:15 Start 10:15
13
13
1:47
30
1.50
50
2.05
1.36
80
24
ADONEL #7012 Arrived 10:00
14
14
2:33
30
1.50
50
2.05
1.36
80
24
9 cy
15
15
2:15
30
1.50
55
2.25
1.50
80
24
16
16
2:29
30
1.50
56
2.29
1.53
80
24
Stop 11:00 Start 11:00
17
17
2:18
30
1.50
51
2.09
1.39
80
24
ADONEL #7016 Arrived 10:37
18
18
2:22
30
1.50
51
2.09
1.39
80
24
Test taken 9 cy
19-
-- 19
2:16
___30
1.50
52
2.13
1.42
80
24
20
1 20
1:53
30
1.50
52
2.13
1.42
80
1 24
Pag.:1/12
- SMP=RABE ENGINEERING AND TESTING, INC.
16" Auger_ As - -T--
a
- -
OSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
PROOO
PROJECT: LM'
O`Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410 4422 N Hwy A1A Misc. Info:
12 tension
Engineers Sign and Seal:
CITY: Fort Pierce, FL
Field Notes: r'
Steel Spec's: (6) #6 full length bars with #3 ties @ 4" O.C. @ top of pile and @10" O.C. @ balance
Auger
Depth
Theorical
Actual
Kips
Date: April 16, 2019
Pile I.D.
Time
(feet)
Grout Ain't
Pump
Strokes
Grout Amt.
Grout
Factor
Notes
MIN.
C.Y.
C.Y.
comp tension
1
21
2:07
30
1.50
53
2.17
1.45
80
24
Stop 11:28 Start 11:29
2
22
2:17
30
1.50
54
2.21
1.47
80
24
ADONEL #4009 Arrived 11:00
3
23
3:00
30
1.50
50
2.05
1.36
80
24
9 cy
4
24
2:16
30
1.50
52
2.13
1.42
80
24
5
25
2:32
30
1.50
50
2.05
1.36
80
24
Stop 1:04 Start 1:04
6
26
2:42
30
1.50
52
2.13
1.42
80
24
ADONEL #8001 Arrived 12:29
7
27
2:26
30
1.50
50
2.05
1.36
80
24
9 cy
8
28
2:31
30
1.50
55
2.25
1.50
80
24
9
29
3:04
30
1.50
50
2.05
1.36
80
24
10
30
2:11
30
1.50
52
2.13
1.42
80
24
Stop 1:50 Start 1:50
11
31
1:59
30
1.50
50
2.05
1.36
80
24
ADONEL #7012 Arrived 1:00
12
32
1:56
30
1.50
50
2.05
1.36
80
24
Test taken 9 cy
13
33
2:23
30
1.50
48
1.96
1.31
80
24
14
34
2:13
30
1.50
56
2.29
1.53
80
24
Stop 2:25
15
35
2:00
30
1.50
52
2.13
1.42
80
24
Start 2:31 Arrived 1:40
16
36
1:56
30
1.50
60
2.45
1.64
80
24
ADONEL #7016 9 cy
17
37
2:07
30
1.50
60
2.45
1.64
80
24
18
38
2:19
30
1.50
53
2.17
1.45
80
24
2:49
_ _30_ _
1.50
54
2.21
1.47
80
24
Stop 3:07 Start 3:07
20
40
2:13
30
1.50
52
2.13
-1.42
80
24
JADONEL #7004 Arrived 2:38
J
Pag.: 2/12
�SOtLP110B MISIMNEERING AND TESTING, INC.
1611 Auger Cas - i e -- ---- -_ =- — _--------- --- - -
PRO OSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's -
PROJECT:
FO+ �L. Load Bearing (tons)
P.1-1 Logged By; AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Si at: L 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @ 4" O.C. @ top of pile and @10" O.C. @ balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Ain't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
la s
P
comp tension
Date: April 16, 2019
Notes
1
41
2:14
30
1.50
52
2.13
1.42
80
24
9 cy
2
42
2:34
30
1.50
52
2.13
1.42
80
24
3
43
2:39
30
1.50
59
2.41
1.61
80
24
Stop 3:47 Start 3:47
4
44
2:39
30
1.50
50
2.05
1.36
80
24
ADONEL #4009 Arrived 3:15
5
45
2:05
30
1.50
58
2.37
1.58
80
24
9 cy
6
46
2:20
30
1.50
55
2.25
1.50
80
24
7
47
2:26
30
1.50
60
2.45
1.64
80
24
Stop 4:22 Start 4:22
8
48
2:13
30
1.50
53
2.17
1.45
80
24
ADONEL #8001 Arrived 4:04
9
49
2:15
30
1.50
50
2.05
1.36
80
24
9 cy
10
50
2:51
30
1.50
52
2.13
1.42
80
24
Stop 5:00
11
12
13
14
15
16
17
18
19
--
- --
20
Pag.: 3/12
SGILP OBE=ENGINEERING AND TESTING, INC.
16" Auger Castob==
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
POOL Load Bearing (tons)
Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410k44!&Q, 4422 N Hwy A1A Misc. Info:
Engineers Sign a eal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Z
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c. at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes.
Actual
Grout Amt.
C.Y.
Factor
Kips
p
comp tension
Date: April 17, 2019
Notes
1
51
2:24
30
1.50
50
2.08
1.38
80
24
Start 7:30 Arrived 7:20
2 1
52
2:39
30
1.50 1
51
2.12
1.41
80
24
ADONEL #7016 9 cy
3
53
2:36
30
1.50
50
2.08
1.38
80
24
4
54
2:43
30
1.50
50
2.08
1.38
80
24
Stop 8:19
5
55
2:56
30
1.50
52
2.16
1.44
80
24
Start 8:24 Arrived 8:08
6
56
2:34
30
1.50
49
2.03
1.36
80
24
IADONEL #8001 Test taken 9 cy
7
57
3:14
30
1.50
48
1.99
1.33
80
24
8
58
3:10
30
1.50
51
2.12
1.41
80
24
9
59
2:55
30
1.50
50
2.08
1.38
80
24
Stop 9:13 Start 9:13 {
10
60
2:15
30
1.50
55
2.28
1.52
80
24
ADONEL #7010 Arrived 9:07
11
61
2:28
30
1.50
50
2.08
1.38
80
24
9 cy
12
62
2:52
30
1.50
55
2.28
1.52
80
24
13
63
2:05
30
1.50
53
2.20
1.47
80
24
Stop 10:04 Start 10:04
14
64
2:41
30
1.50
49
2.03
1.36
80
24
ADONEL #4001 Arrived 9:57
15
65
2:27
30
1.50
50
2.08
1.38
80
24
9 cy
16
66
1:58
30
1.50
48
1.99
1.33
80
24
17
67
2:38
30
1.50
55
2.28
1.52
80
24
18t]jj]j
2:21
30
1.50
49
2.03
1.36
80
24
Stop 10:55 Start 10:55
2:34 --
___30
1.50
51
2.12
1.41
80
24
ADONEL #7016 Arrived 10:35
202:12
30
1.50
1 52
2.16
1:44
80
24
1 9 cy
Pag.: 4/12
SOILPROBE ENGINEERING AND TESTING, INC.
- - uge �-zSe=�-ob=- ---- _ _ -
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
0-11 Logged By: AO 5000 psi Load Bearing (tons)
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,_ 441 , 4422 N Hwy A1A Misc. Info: 12 tension
Engineers Sign and Seal:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" ox. at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
GroutFactoor
Kips
P
comp tension
Date: April 17, 2019
Notes
1
71
3:05
30
1.50
50
2.08
1.38
80
24
2
72
2:42
30
1.50
47
1.95
1.30
80
24
Stop 11:35
3
73
2:20
30
1.50
50
2.08
1.38
80
24
Start 11:42 Arrived 11:22
4
74
3:35
30
1.50
50
2.08
1.38
80
24
ADONEL #8001 Test taken 9 cy
5
75
2:51
30
1.50
51
2.12
1.41
80
24
6
76
2:27
30
1.50
48
1.99
1.33
80
24
7
77
2:40
30
1.50
51
2.12
1.41
80
24
Stop 12:23 Start 12:23
8
78
2:45
30
1.50
52
2.16
1.44
80
24
ADONEL #7010 Arrived 12:00
9
79
2:42
30'
1.50
53
2.20
1.47
80
24
9 cy
10
80
2:30
30
1.50
50
2.08
1.38
80
1 24
11
81
2:22
30
1.50
52
2.16
1.44
80
24
Stop 1:37 Start 1:37
12
82
1:59
30
1.50
51
2.12
1.41
80
24
ADONEL #7003 Arrived 1:26
13
83
2:45
30
1.50
52
2.16
1.44
80
24
9 cy
14
84
2:23
30
1.50
51
2.12
1.41
80
24
15
85
2:18
30
1.50
52
2.16
1.44
80
24
16
86
2:14
30
1.50
55
2.28
1.52
80
24
Stop 2:24 Start 2:24
17
87
2:37
30
1.50
53
2.20
1.47
80
24
ADONEL #4001 Arrived 1:41
18
88
3:02
30
1.50
50
2.08
1.38
80
24
9 cy
-19--
--89----- __
2:30
30
1.50
50
2.08
1.38
80
24
20
90
2:25
30
1.50
50
2.08
1.38
80
24
Stop 2:55 Start 2:55
Pag.: 5/12
SOILPROBE ENGINEERING AND TESTING, INC.
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
9.20 Logged BY: AO 5000 psi Load Bearing (tons)
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,21 M16 4422 N Hwy A1A Misc. Info:
12 tension
Engineers Sig eal:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c. at balance -
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
comp tension
Date: April 17, 2019
Notes
1
91
2:53
30
1.50
56
2.32
1.55
80
24
ADONEL #8001 Arrived 2:20
2
92
2:27
30
1.50
52
2.16
1.44
80
24
9 cy
3
93
2:27
30
1.50
51
2.12
1.41
80
24
4
94
2:39
30
1.50
48
1.99
1.33
80
24
Stop 4:03 Start 4:03
5
95
2:21
30
1.50
50
2.08
1.38
80
24
ADONEL #7010 Arrived 3:10
6
96
2:38
30
1.50
50
2.08
1.38
80
24
9 cy
7
97
2:56
30
1.50
50
2.08
1.38
80
24
Stop 5:20
8
98
2:40
30
1.50
52
2.16
1.44
80
24
Start Arrived 5:18
9
99
1:52
30
1.50
47
1.95
1.30
80
24
ADONEL #4010 9 cy
10
100
2:11
30
1.50
53
2.20
1.47
80
24
11
101
2:37
30
1.50
50
2.08
1.38
80
24
Stop 6:00
12
13
14
15
16
17
18
19•
20
-
Pag.: 6/12
SOILPROBE ENGINEERING AND TESTING, INC.
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
� ` Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4.16y 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c.at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am
C.Y.
PumActual
Strokes Stroke s
Grout Amt.
C.Y.
Grout
Factor
Kips
P
comp tension
Date: April 18, 2019
Notes
1
102
3:00
30
1.50
50
2.01
1.34
80
24
Start 8:12 Arrived 7:43
2
103
2:34
30
1.50
50
2.01
1.34
80
24
ADONEL #7010 9 cy
3
104
2:55
30
1.50
55
2.21
1.47
80
24
4
105
3:19
30
1.50
50
2.01
1.34
80
24
Stop 8:50
5
106
3:50
30
1.50
50
2.01
1.34
80
24
Start 8:57. Arrived 8:42
6
107
2:14
30
1.50
1 50
2.01
1.34
80
24
ADONEL #7009 Test taken 9 cy
7
108
2:57
30
1.50
48
1.93
1.29
80
24
8
109
2:31
30
1.50
51
2.05
1.37
80
24
9
110
2:35
30
1.50
48
1.93
1.29
80
24
Stop 10:07 Start 10:07
10
111
3:00
30
1.50
52
2.09
1.39
80
24
IADONEL #7014 Arrived 9:56
11
112
3:00
30
1.50
48
1.93
1.29
80
24
9 cy
12
113
2:40
30
1.50
51
2.05
1.37
80
24
13
114
3:15
30
1.50
52
2.09
1.39
80
24
14
115
2:55
30
1.50
53 _
2.13
1.42
80
24
Stop 10:55 Start 10:55
15
116
2:25
30
1.50
52
2.09
1.39
80
24
ADONEL #7016 Arrived 10:27
16
117
2:11
30
1.50
50
2.01
1.34
80
24
9 cy
17
118
2:40
30
1.50
51
2.05
1.37
80
24
18
119
2:05
30
1.50
52
2.09
1.39
80
24
Stop 11:49 Start 11:49
19
120
2:53
30
1.50
53
2.13
1.42
80
24
ADONEL #7009 Arrived 11:45
20
121
-2.23- - -
30-- -
1.50
54
2.17
1.45
80
24
9 cy
Pag.: 7/12 --- - - -
kO°ILPROBE ENGINEERING AND TESTING, INC.
- �='--16u=AugevG-a" ffeL
PROPOSED TWO-STORY RESIDENCE& lContractor. SION HOMES Grout Spec's
PROJECT: "P Load Bearing (tons)
ILogged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4422 N Hwy AIA Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c.at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Arn't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
comp tension
Date: April 18,2019
Notes
1
122
2:33
30
1.50
63
2.13
1.42
80
24
2
123
2:41
30
1.50
49
1.97
1.31
80
24
Stop 1:17 Start 1:17
3
124
2:26
30
1.50
52
2.09
1.39
80
24
ADONEL #7014 Arrived 12:50
4
125
2:57
30
1.50
51
2.05
1.37
80
24
9 cy
5
126
3:09
30
1.50
50
2.01
1 i34
80
24
6
127
3:28
30
1.50
50
2.01
1.34
80
24
7
128
3:00
30
1.50
53
2.13
1.42
80
24
Stop 2:15 Start 2:15
8
129
2:37
30
1.50
51
2.05
1.37
80
24
ADONEL #7010 Arrived 1:35
9
130
2:49
30
1.50
52
2.09
1.39
80
24
9 cy
10
131
2:48
30.
1.50
52
2.09
1.39
80
24
11
132
2:49
30
1.50
53
2.13
1.42
80
24
Stop 3:14 Start 3:14
12
LF�ZV
2:32
30
1.50
51
2.05
1.37
80
24
ADONEL #4005 Arrived 2:24
13
1 4
2:04
30
1.50
51
2.05
1.37
80
24
Test taken 9 cy
14
X1735
2:00
30
1'.50
54
2.17
1.45
80
24
15
136
2:14
30
1.50
55
2.21
1.47
80
24
16
137
2:07
30
1.50
53
2.13
1.42
80
24
Stop 4:20 Start 4:20
17
138
2:23
30
1.50
50
2.01
1.34
80
24
ADONEL #70D9 Arrived 2:52
18
139
2:00
30
1.50
52
2.09
1.39
80
24
9 cy
19
140
2:33
30
1.50
54
2.17
1.45
80
24
Stop 5:30
20
Pag.: 8/12
SOILPROBE ENGINEERING AND TESTING, INC.
---- _--------- ---- ---- ---= - _ _ �' = -gee ast e-La¢ _
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
QN-6 V Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4t '4 b44422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: Ai�12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Ki s
P
comp tension
Date: April 19, 2019
Notes
1
141
2:57
30
1.50
48
2.16
1.44
80
24
Start 7:53 Arrived 7:34
2
142
2:16
30
1.50
1 50
2.25.
1.50
80
24
ADONEL #7016 Test taken 9 cy
3
143
2:21
30
1.50
50
2.25
1.50
80
24
4
144
2:21
30
1.50
49
2.21
1.47
80
24
5
145
2:38
30
1.50
50
2.25
1.50
80
24
Stop 8:39 Start 8:39
6
146
3:00
30
1.50
50
2.25
1.50
80
24
ADONEL #8001 Arrived 8:02
7
147
2:17
30
1.50
51
2.30
1.53
80
24
9 cy
8
148
2:27
30
1.50
48
2.16
1.44
80
24
9
1,4
2:22
30
1.50
55
2.48
1.65
80
24
Stop 9:35 Start 9:35
10
150
2:24
30
1.50
50
2.25
1.50
80
24
IADONEL #7014 Arrived 8:54
11
151
3:22
30
1.50
50
2.25
1.50
80
24
9 cy
12
152
2:30
30
1.50
53
2.39
1.59
80
24
13
153
2:36
30
1.50
48
2.16
1.44
80
24
Stop 10:39 Start 10:39
14
154
2:51
30
1.50
50
2.25
1.50
80
24
ADONEL #7004 Arrived 9:39
15
15�
2:44
30
1.50
52
2.34
1.56
80
24
9 cy
16
156
2:14
30
1.50
51
2.30
1.53
24
17
157
2:32
30
1.50
53
2.39
1.59
24
Stop 11:32 Start 11:32
18
158
2:35
30
1.50
55
2.48
1.65
IR
24
ADONEL #4009 Arrived 10:23
19
159
2:27
30
1.50
55
2.48
1.65
24
9 cy
20
160
1:59
__ 30
1.50
50
2.25
1.50
24
Pag.: 9/12
SOILPROBE ENGINEERING AND TESTING, INC.
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES GroutSpec's ,
- 4 OLD Logged By: AO 5000 psi Load Bearing (tons)
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4�, 4422 N Hwy A1A Misc. Info:
12 tendon
Engineers Sign and Seal:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
p
comp tension
Date: April 19, 2019
Notes
1
161
2:50
30
1.50
52
2.34
1.56
80
24
Stop 12:22 Start 12:22
2
162
2:15
30
1.50
55
2.48
1.65
80
24
ADONEL #7016 Arrived 11:42
3
9 cy
4
Stop 1:30
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
— —
-- -
Pag.:10/12
SOILPROBE ENGINEERING AND TESTING, INC.
PROJECT PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's -
fPOQL Load Bearing (tons)
Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,V'4 IR, 4422 N Hwy A1A Misc. Info:
Engineers Sign eal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: Auger Cast Pile with (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
St omes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
p
comp tension
Date: April 23, 2019
Notes
1
163
2:34
30
1.50
50
2.13
1.42
80
24
Start 9:50 Arrived 9:34
2
164
3:01
30
1.50
49
2.08
1.39
80
24
IADONEL #7007 Test taken 9 cy
3
165
2:35
30
1.50
55
2.34
1.56
80
24
4
166
2:22
30
1.50
50
2.13
1.42
80
24
Stop 10:39
5
167
2:14
30
1.50
52
2.21
1.47
80
24
Start 10:40 Arrived 10:15
6
168
2:41
1 30
1.50
54
2.30
1.53
80
1 24
ADONEL #7016 9 cy
7
169
2:09
30
1.50
54
2.30
1.53
80
1 24
8
170
2:19
30
1.50
52
2.21
1.47
80
24
9
171
2:40
30
1.50
51
2.17
1.45
80
24
Stop 11:20 Start 11:20
10
172
2:44
30
1.50
50
2.13
1.42
80
24
ADONEL #4009 Arrived 10:49
11
173
2:58
30
1.50
52
2.21
1.47
80
24
9 cy
12
174
2:27
30
1.50
50
2.13
1.42
80
1 24
13
175
2:16
30
1.50
50
2.13
1.42
80
24
Stop 12:18 Start 12:18
14
176
2:25
30
1.50
54
2.30
1.53
80
24
ADONEL #7015 Arrived 11:51
15
177
2:00
1 30
1.50
52
2.21
1.47
80
24
9 cy
16
178
3:33
30
1.50
54
2.30
1.53
80
24
17
179
2:22
30
1.50
52
2.21
1.47
80
24
Stop 1:12
18
180
2:17
30
1.50
50
2.13
1.42
80
24
Start 1:25 Arrived 12:40
19
181
2:29
30
1.50
53
2.25
1.50
80
24
ADONEL #8001 9 cy
--20
-182- -- -
- -2:26-
__30
1.50
55
2.34
1.56
80
1 24
Pag.: 11/12
SOILPROBE ENGINEERING AND TESTING, INC.
PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's _
PROJECT: � Load Bearing (tons)
�P�.-Ott Lo ed B AO 5000 psi
'__.- Y�
� gg
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 44+1 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
i
Steel Spec's: Auger Cast Pile with (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Auger
Depth
Theorical
Actual
Date: April 23, 2019
Pile I.D.
Time
(feet)
Grout Am't
Pump
Grout Amt.
Grout
Kips
Strokes.
Factor
Notes
MIN.
C.Y.
C.Y.
comp tension
1
183
2:10
30
1.50
55
2.34
1.56
80
24
Stop 1:57
2
184
2:34
30
1.50
56
2.38
1.59
80
24
Start 2:06 Arrived 1:00
3
185
2:28
30
1.50
55
2.34
1.56
80
24
ADONEL #7000 Test taken 9 Cy
4
186
2:50
30
1.50
56
2.38
1.59
80
24
5
187
2:44
30
1.50
55
2.34
1.56
80
24
Stop 2:41
6
1 188
2:25
30
1.50
1 48
2.04
1.36
80
24
Start 2:58 Arrived 2:36
7
189
2:05
30
1.50
54
2.30
1.53
80
24
ADONEL #7016 9 cy
8
190
2:22
30
1.50
55
2.34
1.56
80
24
Stop 3:30
9
10
11
,
12
13
14
15
16
17
18
19
20
Pag.: 12/12
�j
E '-%Aa& Ga�
SOIL ROBE ENGINEERING AND Pile Location Sketch
TESTING American Foundation Lot #2
3931 SW 47h Ave. #104
Davie, FL 33314
Tel. (954) 584-6115 Fort Pierce, FL 1 1 1