HomeMy WebLinkAbout0502-1081-CERTIFICATE OF TERMITE TREATMENT 12-14-05i
C.�E- _► St. Lucie County _rspections
ti
2300 Virginia Avenue ;DEC r
2 9 005
Ft. Pierce, FL 34982
(772) 462 2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT I# 0��� Z - I0S/ JOB ADDRESS k"'6SL
BUILDE /z0br /-L90(a
PEST C NTROL CONTRACTOR HANNAN PEST MANAGEMENT
i
PEST C NTROL LICENSE# JB99418
NOTE:
We, Pe undersigned, hereby certify that we have pretreated the above -described construction for
sub lerranean termites in accordance with the standards of the National PeessItt Control Association.
Square feet of area treated: %� ��"�� Chemicals used: e�xl lj
Percentage of solution: ` �l Total gallons used:
Dal of treatment: L / Time of treatment:
Footing
❑ 1 st Treatment
❑ Re -treat
Slab
❑ 1 st Treatment
❑ Re -treat
Driveway
❑ 1 st Treatment
❑ Re -treat
Pools
❑ 1 st Treatment
❑ Re -treat
Other
❑ 1 st Treatment
❑ Re -treat
FBC104.2.6 Certificate of Protective Treatment for prevention of termites.
A weather resistant jobsite posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
completed, providing a copy for the person the permit is issued to and
another copyfor the building permit files. The Treatment Certificate shall
provide the product used, identity of the applicator, time and date of the
treatment, site location, area treated, chemical used, percent concentration
and number ofgallons used, to establish a verifiable record ofprotective
treatment. If the soil chemical barrier method for termite protection is used,
final exterior treatment shall be completed prior to final building approval.
St. Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
for Final Inspection
Signature of exterminator
re must be a completed form for each required treatment or re -treatment and this form must be on
ob site to be picked up by the inspector at time of each inspection or the scheduled inspection will
fail and a re -inspection fee charged.