Loading...
HomeMy WebLinkAboutENERGY EFFICIENCY CODE11 IlU1LU1Nt] CONSTRUCTION S6AN�//NE� j SELfION 8 •SIMPLIFIED ANNUAL ENERGY METHOD FORM 80OA•89 BY ADMINISTERED BY THE DEPARTMENT OF COMMUNITY AFFAIRS Non•Residenttail, .ir'gSjUn ALL CLIMATEjZONES PROJECT NAME: T US/NE'S serf-� ZONE: ADDRESS: (/ E . ACK /v r BUILDING CLASSIFICATIONS : O/— CITY ZIP CODE: SrLIC /,!5- BUILDING PERMIT NO.: fl BUILDER: PERMITTING OFFICE: T C/C CVAJT l OWNER: JP-20VA 14 o.,,Som JURISDICTION NO: w- PLUIl4DA LNL"ItGY L•PI'ICIL•NCY COUC I-0 BUILDING INFORMATION WALLS ROOFICEILING FLOORS DOORS GLASS TYPE U I AREA TYPE U I AREA TYPE U I AREA TYPE I U 'AREA TYPE M AREA Concrete (CBS) Under attic Slab -on -grade Wood Single, wall �I Wood frame Single Assembly Raised Wood Metal Double, wall Metal frame Other; Raised concrete Insulated. Single, roof Insulation R-value Insulation R-value Insulation R-value Other Double, roof II SYSTEMS INFORMATION AIR CONDITIONER HEATING SYSTEM HOT WAtER TYPE EFFICIENCY TONS TYPE EFFICIENCY BTUIH TYPE Unitary 8 Heal Pump <65.000 Btulh DJ � � SEER 1 S Central Heal Pump STRAP N�,� r Electric _ < 65,000 Btu lh HSPF Resistance >_65,000 Btu/It EER > 65,000 Btu/h COP •Ded. Heal Pum ❑ Water cooled EER G as Evaporatively cooled EER Water cooled COP Natural ❑ PTAC EER Evaporatively cooled COP LPG ❑ Chillers COP PTHP COP Oil ❑ Other: Gas/Oil (circle one) HRU ❑ . < 225,0001300,000 Btu/h >— 225,0001300,000 Blu/h AFUE E l Other; LIGHTING KW: so ��0 PRESCRIPTIVE MEASURES (Must be met or exceeded by all buildings.) COMPONENTS SECTION ) REOUIREMENTS CHECK Windows 502.4 Maximum of 0.5 clot per linear fool of operable sash crack. Doors 502.4 Maximum of 11.0 clot per linear loot of operable sash crack. Joints/Cracks 5024 To ha caulknd, askrtlnd, wnallitilr;lripprtd, of nlherwiso snalml. Reheat 503.3 Supply air restricted !o sol cold/hot dock temperature Io meet load of worst case zone. Ventilation 503.4 Supplied with readily accessible switch lot shul-oll and/or volume reduction when ventilation is not required. HVAC Efficiency 503.4 Minimum efficiencies — Healing: Tables 5.5, 5.6; Cooling: Tables 5-7, 5-8. 5.9. Transport Energy 503.5 Minimum of 8.0. Balancing 503.E Provide means lot balancing IIVAC air system 8 water distribution system. HVAC Controls 503.7 Srparaln readily accessible manual or autnrnalic thprmnslal for nach system, IIVAC Duct Consiruclion 503.9 Constructed in accordance with industry slandards 8 local ml chanical codes. Ducts must be insulated to minimum R = A 1115 (fit 'T II'/llhr). Piping Insulation 50110 In accordance with Tahln 5.10. Water Healers 504.2 Must bear ASHRAE label indicating compliance with ASHRAE Standard 90 or comply with elficiency and standby loss requirements. Switch of dually marked circuit breaker (ulocllic) or cul-oll (gas) must be provided. Heat 1 required. Must meet minimum water healing equipment efficiencies in Table 5.11 alter 111190. f Swinuniuy Puols 8 Spas 504.2 Spas 8 healed pools roust have covers. Non-conenercial pools must have pump timer. Gas spn R pool hoalors must Ill minimum Ihormal oflicioncy of 75% (78/'allrtr 111190). Hot Water Pipes 504.4 Insulation is required for recirculating systems. Piping heal loss is limited to 17.5 Btu/hllinear fool of 1 i1in; son T• /tin 5.12, Water lixlures 504 Ti Water flow roslriclnd In maximum of 3 gprn al lin psiq; Inilnls maximum 3.5 gallon Ill Public lavalory fixture nlaxlnwrn Iluw of .5 ypnl or .5 gallon if has self-clusing valve. Lighting 505.1 Ballast ellicacy factois are Iisled in lable 5.14. SECTION 8 COMPLIANCE SECTION 4 COMPLIANCE All plans and specifications shall be si ned and sealed by a Florida regisl red engineer or Budget (Table 8-1): Computer program used: - architect with the exceptions provide or i coon 381.229, F.S. and Se Ion 471.003, F.& Building MDTU /SF: Section 5 Budget: I horaby corllty that ilia plans and sp Ilcal coverod by this calcuI re In compllanc• Conditioned sq. It.: Section 4 Total: with Ilse Florida Energy Code, SIGNATURE: Compliance with Section 8 was demonstrated by a -Prescriptive Measures DATE: O O methodology or by Dual Calculation: Review of the plans and specifications covered by [his calculation Indlcate compliance with the Florida Energy Code. Before construction Is completed, this building wI 'be Inspected for 807.2 Supermarkets 809.2 Basic Features compliance in accordance with Section 553.908 F.S. 807.3 Restaurants 809.3 Dual Calculation BUILDING OFFICIAL: 807.4 Kitchens Budget DATE: 8-65 FORM 800-A-89 FLORIDA ENERGY EFFICIENCY � CODE FOR BUILDING CONSTRUCTION SECTION. 8 -- SIMPLIFIED ANNUAL ENERGY METHOD - ADMINISTERED By THE. DEPARTMENT OF COMMUNITY AFFAIRS ENERGY CONSUMING WINTER SPRING AND FALL SUMMER ELEMENTS TAtIL[ U• = AREA • MTR - MBTU U• y' AREA fi MTR T MBTU JEU AREA f MTR - MBTU WALLS Uw A B ROOF Ur Cj RAISED FLOOR d UI INTERIOR WALLS e GLASS SOLAR OR. D - GLASS CONDUCTION E OUTSIDE AIR F - G PEOPLE HEAT H LIGHTING HEAT - H V-A-C- -M-O T O R HEAT _ IRt109 CONO. ►A - • T N D INC.O.F. Ir�Ci]Cr��l�l 1 ! ►yL��1� �:�ir7y�ll»KfE3� vim wwo IWAWAI EZ iplfm� �mvfflwl SC Aa -SSFM— I Ll 1 4. 1 CFM VWM- CFM ■VSFM- i At , tPWM- At , .PSFM, ATTS$LWM= I (WATTS$LSFM BHP ;.MWMt BHP YMSFM SC T A9 . SSM T Uo * A9 . CSM T rWwAPJMp;,vm],rm ATTSf LSM BHP T MSM . .' L1114 I + K I WINTER SUBTOTAL i + Heat choose L START-UP HEAT At SUH chooao _ Cool MOP Heat Cool Cool SUBTOTALS QH or © H C . DH C 3�� C x HEAT/COOL SYS. MTR HSM x x CSMo��' H S MI. x CSMr x CSM'SE P SEASONAL SUBTOTALS H C S H C w I o` Q ENERGY SUMMARY LIGHTING RAW ENERGY F WATER HEATING - - HVAC MOTOR RAW ENERGY DEVICE COOLING. TWR PUMPS AHUS - VAV AHUS - CV OTHER HEATING I LRE x WATTS - MBTU add tov er HW OR BUHW At MBTU MRE BHP MBTU .D 3 3D. TOTAL C RI TOTAL MBTU _ S FLOOR AREA At = (T DESIGN ENERGY COOLING R TOTAL MBTU ID, ALLOWABLE ENERGY BUDGET -Table b-1 V f?f T_ 'r-5