HomeMy WebLinkAboutEVALUATION REPORTI:l%14eI_yIM►1:3
TRI-BUILT Mat(
PO Box 70
Rutherford, NJ I
(8001516-1485
SCOPE: 11
This Evaluation Re,
construction mate
P.E. for use of the
compiliance with tl
DESCRIPTION: TRI-B
LABELING: Labeling
herein. 1
CONTINUED COMPLIAI
i
Quality Assurance I
this E� aluation Re
changes or the ref(
Evaluation Report I
ADVERTISEMENT: Th(
advertising literatu
INSPECTION: Upon r(
its distributors and
This Evaluation Rei
Prepared by:
Robert J.M. Niemir
Florida Registration Nc
CERTIFICATION OF INDEPEN
1. Exterior Research
in any company rr
2. Exterior Research
distributing produ
3. Robert Nieminen,
which the evaluat
4. Robert Nieminen,
product.
5. This is a building
project on which
specifically for tha
I
i� u •y-x.
ST. LUCIE COUNTY
SUILDIM DIVISI
FOR COM IA
[MUST
EVIEWE
ATE Z G
I PLANS AMD PE MIT
ERD E KEPT ON JOB OR
NO INSPECTION WILL BE MADE
s Group, LLC
S(W&E-D
�U
131, Lucia Cow&
EXTERIOR RESEARCH & DESIGN, LLC.
Certificate of Authorization #9503
353 Christian Street
Oxford, CT 06478
(203) 262-9245
Evaluation Report A42970.10.12-R2
FL16027-R2.
Date of Issuance:10/23/2012
Revision 2: 09/25/2017
sort is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
als in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen,
product under the Florida Building Code. The product described herein has been evaluated for
6th Edition (2017) Florida Building Code sections noted herein.
LT Modified Bitumen Roof Systems
shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
'E: This Evaluation Report is valid until such time as the named product(s) changes, the referenced
)cumentation changes, or provisions of the Code that relate to the product change. Acceptance of
)rt by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
enced Quality Assurance documentation changes. Trinityl ERD requires a complete review of this
lative to updated Code requirements with each Code Cycle.
Evaluation Report number preceded by the words "Trinity I ERD Evaluated" may be displayed in
If any portion of the Evaluation Report is displayed, then it shall be done in its entirety.
luest, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
hall be available for inspection at the job site at the request of the Building Official.
rt consists of pages 1 through 4, plus a 26-page Appendix.
P.E.
66, Florida DCA ANE1983
The facsimile seal appearing was authorized. by Robert Nieminen,
P.E. on 09/25/2017. This does not serve as an electronically signed
document.
Design, LLC. d/b/a Trinity I ERD does not have, nor does it intend to acquire or will it acquire, a financial interest
ufacturing or distributing products it evaluates.
Design, LLC. d/b/a Trinity I ERD is not owned, operated or controlled by any company manufacturing or
it evaluates.
E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for
i reports are being issued.
E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
e evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any
Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained
Irpose.
CONCU ED FASTENERS OR ATTACHMENTS
ARE THE RESPONSIBILITY OF THE
THESE PLANS AND ALL PROPOSED WORK
ARE SUBJECT TO ANY CORRECTIONS ,
REQUIRED BY Fl= IMPEC TORS THAT
t AY UE NECES&AM IN ORDER TO
COMPLY WITH AU APPUCAKE CODES.
qj
TRINITY I ERD
APP.END13(1;. ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE
•Table'_ � 1--Deck Application Type Description =' Page
-' 1A-1 1N6ad
New or Reroof (Tear -Off)
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
4
1K-2 r -_' %o d
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
-,5
' 1K'
—Wood
New, Reroof (Tear -Off) or Recover
B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
5 .
'Wood
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
6 .
14,-
173 s' Wood
New, Reroof (Tear -Off) or Recover
D
Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded Roof Cover
6 '
'1
=z� -'Wood
New or Reroof (Tear -Off)
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
7
=•,1E-2
Wood
New, Reroof (Tear -Off) or Recover
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
8
;Wood
New or Reroof (Tear -Off)
F
Non -Insulated, Bonded Roof Cover
8
2A
Steel or Structural concrete
New, Reroof (Tear -Off) or Recover
B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
9
2B
Steel or Structural concrete
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
9
2C
Steel or Structural concrete
New, Reroof (Tear -Off) or Recover
D
Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded Roof Cover
30
3A
Structural concrete
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
11-14
3B
c_.- Structural concrete
New or Reroof (Tear -Off)
F
Non -Insulated, Bonded Roof Cover
14
4A. -- LWIC New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 15-16
4B `4 • LWIC New or Reroof (Tear -Off) A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover - 16
4C'- = _ _ LWIC New or Reroof (Tear -Off) E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 17-19
5A .`'
-= CWF>
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
20
SB=—
> CUHF--'
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
21
SCE= =
CW_F-
New, Reroof (Tear -Off) or Recover
B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
22
5DS-c '
CWF
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
22
5E - a
_ CWF-
New, Reroof (Tear -Off) or Recover
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
22
6A
_' Gypsum
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
23
66 ' - '
��, Gypsum
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
24
6C
-Gypsum
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
24
6D_-.
Gypsum
New, Reroof (Tear -Off) or Recover
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
24
7A
Various
Recover
A-1
Bonded Insulation, Bonded Roof Cover
25-26
Various
Recover
F
Non -Insulated, Bonded Base Sheet, Bonded Roof Cover
26
The following notes apply to the systems outlined herein:
j" 1. -, The roof system evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction.
" Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation.
2. —Insulation- _-Ease-s >f ee as eners shall_be of sufficient length for the following -deck -engagement:
•-" ➢ Wood: Minimum 0.75-inch penetration.—
➢ Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck.
y' ➢ Structural concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation instructions.
3. Unless otherwise noted, insulation may be any one layer or combination of polyisocya nu rate, polystyrene, wood fiberboard, perlite, gypsum -based roof board or mineral -wool roof board that meets the QA
requirements of F.A.C. Rule 61G20-3 and is documented as meeting FBC 1505.1 and, for foam plastic, FBC Chapter 26, when installed with the roof cover.
�-Exterior Research and Design, I.I.C. d/b/a Trinity I ERD Evaluation Report A42970.10.12-R2 for FL36027-R2
Certificate of Authorization #9503 C" EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 1 of 26
>1
15. Unless otherwise noted, refer to the following references for bonded base, ply or cap sheet applications.
- TABLE 1:'.TRI-BUILT-ROOF COVERS
Reference
Layer
Material
Application
Tase-Ply
—FBCApproved 4 ype
HA at 20-40 Ibs/square
Ply
FBC A
Approved ASTM D2178, Type IV or VI
(Base and Ply sheets, Asphalt -Applied)
SBS-AA
(SBS, Asphalt -Applied)
Cap Ply
TriBuilt SBS Granular
HA at 20-40 Ibs/square
SBS-TA
(SBS, Torch -Applied)
Cap Ply
TriBuilt SBS Granular
Torch -Applied
SBS-SA
Base Ply
jFTTjB➢ilt' AS se
(SBS, Self -Adhering)
Self -Adhering
Cap PlyX
5TriBailt`S SBS=Z p
APP-TA
Base Ply or Ply
TriBuilt APP Smooth
Torch -Applied
Cap Ply
TriBuilt APP Smooth, TriBuilt APP Granular
(APP, Torch -Applied)
APP-SA
(APP, Self -Adhering)
Cap Ply
TriBuilt SA APP Cap
Self -Adhering
16. Vapor barrier options for use over structural concrete deck followed by adhered insulation carry the following Maximum Design Pressure (MDP) limitations. The lesser of the MDP listings below vs. those in Table 3A
applies:
VAPOR BARRIER OPTIONS; STRUCTURAL CONCRETE DECK; ADHERED INSULATION PER TABLE.3A
Option #
Primer
Vapor Barrier
Insulation Adhesive
MDP (psf)
Type
Attach
VB-1.
ASTM D41
TriBuilt SA SBS Base
Self -Adhering
Inta-Stik or CR-20, 12-inch o.c.
-60.0
VB-2.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Insta-Stik, 12-inch o.c.
-75.0
VB-3.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Millennium One Step Foamable Adhesive, 12-inch o.c.
-157.5
VB-4.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
CR-20, 12-inch o.c.
-270.0
VB-5.
ASTM D41
TriBuilt SA SBS Base
Self -Adhering
Millennium One Step Foamable Adhesive, Millennium PG-1 Pump Grade
Adhesive, OlyBond 500 or CR-20, 12-inch o.c.
-290.0
17. Dens Deck shall be field -primed with PG100 prior to self -adhering membrane application. Refer to tables herein for other priming requirements.
18. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC 1609 for determination of design wind loads.
Exterior Research and Design, LLC. d/b/a Trinity( ERD Evaluation Report A42970.10.12-R2 for FL36027-R2
Certificate of Authorization #9503 C' EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 3 of 26
i
\,I TRINITY I ERD
TABLE 1E-2: WOOD DECKS —NEW CONSTRUCTION, REROOF (TEAR-OFF)oRRECOVER
SYSTEM TYPE E: NON -INSULATED, MECHANICALLY ATTACHED BASE SHEET, BONDED ROOF COVER
System
Base Sheet
Roof Cover (Note 15)
MDP
No.
Deck (Note 1)
Base
Fasteners
Attach
Base Ply
Cap Ply
(Psf)
Min. 19/32-inch
Polyglass Elastobase, Polyglass Elastobase
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-inch
(Optional) One or
W-1
plywood at max.
Poly, Polyglass G2 Base, CertainTeed
Roofgrip #14, Dekfast Hex with Dekfast #14
o.c. in two, equally spaced, staggered
more BP -AA or
SBS-AA, SBS-
-52.5
24-inch spans
Glasbase, Firestone MB Base,1M Perma-
or TruFast MP-3 with TruFast HD
center rows
APP TA
TA, APP-TA
Ply 28, Tamko Glass Base or GAFGLAS #75
Min. 19/32-inch
Polyglass Elastobase or Polyglass
Dekfast Hex with Dekfast #14 or TruFast MP-
12-inch o.c. in 4-inch lap and 12-inch
One or more SBS-
SBS-SA, APP-
W-2
plywood at max.
Elastobase Poly with poly top surface
3 with TruFast HD
o.c. in two, equally spaced, staggered
SA
SA, SBS-TA or
52.5*
24-inch spans
center rows
APP-TA
Min. 19/32-inch
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-inch
(Optional) One or
SBS-AA, SBS-
W-3
plywood at max.
Elastobase Poly
Roofgrip #12
o.c. in two, equally spaced, staggered
more BP -AA or
TA, APP-TA
60.0
24-inch spans
center rows
APP-TA
Min. 19/32-inch
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) withOne
12-inch o.c. in 4-inch lap and 12-inch
or more SBS-
SBS-SA, APP-
W-4
plywood at max.
Elastobase Poly with poly top surface
Roofgrip #12
o.c. in two, equally spaced, staggered
SA
SA, SBS-TA or
-60.0*
24-inch spans
center rows
APP-TA
TABLE F: WOOD DECKS —NEW CONSTRUCTION oR REROOF (TEAR -OFF) `
SYSTEM TYPE F: NON -INSULATED, BONDED ROOF COVER
System
Roof Cover (Note 15)
MDP
No.
Deck
Primer
(Psf)
Joint Treatment
Base Ply
Ply
Cap Ply
W 5
Min. 15/32-inch plywood
(Optional) ASTM D41
None
SBS-SA
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
90.0
at max. 24-inch spans
APP-TA
or APP-TA
W-6
Min. 15/32-inch plywood
(Optional) ASTM D41
Plywood joints are covered with 4-inch wide strips of TriBuilt.SA
TriBuilt SA SBS Base
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
97.5
at max. 24-inch spans
SBS Base, rolled into place tacreate continuous bond.
APP-TA
or APP-TA
Exterior Research and Design, LLC. d/b/a Trinity IERD
Certificate of Authorization #9503
Prepared by: Robert Nieminen, PE-59166
6T" EDITION (2017) FBC NON-HVHZ EVALUATION
TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485
Evaluation Report A42970.10.12-R2 for FL36027-R2
Revision 2: 09/25/2017
Appendix 1, Page 8 of 26 •`