Evaluation Report A42970.10.12-112
FL16027-R2
Date of issuance:10/23/2012
Revision 2: 09/25/2017
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use o
construction.. materials in the State of Florida. The documentation submitted has been reviewed by Robert. Nieminen,
P.E. for use of the product under the Florida Building Code. The product described herein has been evaluated for
compliance with the 6eh Edition (2017) Florida Building Code sections noted herein.. ,
DESCRIPTION: TRI-BUILT Modified Bitumen Roof Systems
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced
Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. Trinity) ERD requires a complete review of thi
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity I ERD Evaluated" may be; display
advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety. /
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufas
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 4, plus a 26-page Appendix.
Prepared by:
Robert J.M. Nieminen, P.E.
Florida Registration No. 59166, Florida DCA ANE1983
TIKSE PLANS AND/
ARE SUBJECT TO/
REQUIRED BY F '
MAY BE NECr
COMPLY W17'
The facsimile sy /
P.E. on 09/25P
CERTIFICATION OF INDEPENDENCE:
1. Exterior Research & Design, LLC. d/b/a Trinity I ERD does not have, nor does it intend to
in any company manufacturing or distributing products it evaluates.
2. Exterior Research & Design, LLC. d/b/a Trinity I ERD is not owned, operated or
distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any
which the evaluation reports are being issued.
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest i
product.
5. This is a building code evaluation. Neither Trinityl ERD nor Robert NiF
project on which this Evaluation Report, or previous versions thereof
specifically for that purpose. {,' � T -7 j
ST. LUCIE COUNTY BUILDING`61V ION"
REVIEWED FOR COMPLIANCE
REVIEWf
DATE
PLANS AND PERMIT MUST BE KEPTION JOB
SITE OR NO INSPECTIONS) WILL gE MADE
ERA
TRINITY I
IND UPLIFT:RESISTANCE „',
Application Type Description
Page
New or Reroof (Tear -Off) = - - A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 4
Prood New, Reroof (Tear -Off) or Recover', A-2 Mech. Attached Anchor Sheet,.Bonded Insulation, Bonded Roof Cover5
New, Reroof (Tear -Off) or Recover B Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover 5
�,•
1C Wood 777 New, Reroof (Tear -Off) or Recover. C Mech. Attached Insulation, Bonded Roof Cover 6
1D Wood New, Reroof (Tear -Off) or Rei over. := D Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded Roof Cover 6
lE-1 Wood New or Reroof (Tear -Off) E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 7
lE-2 Wood New, Reroof (Tear -Off) or,Recove-jr-. ='- - E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 8
1F Wood New or Reroof (Tear -Off) ' _ .. I F Non -Insulated, Bonded Roof Cover 8
2A Steel or Structural concrete New, Reroof (Tear -Off) or Recover, •;: B Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover 9
2B Steel or Structural concrete New, Reroof (Tear -Off) or Recover' . -- C Mech. Attached Insulation, Bonded Roof Cover 9
2C Steel or Structural concrete New, Reroof (Tear -Off) or Recover D Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded Roof Cover10
3A
Structural concrete
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
11-14
3B
Structural concrete
New or Reroof (Tear -Off)
F
Non -Insulated, Bonded Roof Cover
; -' _
14
4A,
LWIC
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
15-16
- 4g;
LWIG
New or Reroof (Tear -Off)
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
.L' >>
-.16
4C
LWIC `
New or Reroof (Tear -Off)
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
17-19
5A
CWF-
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
20
` SB,
CWF
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
s.
21
i 5C!
CWF
New, Reroof (Tear -Off) or Recover
B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
;L
22
SD
; CWF
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
22
"•.: 5E
- CWF
New, Reroof (Tear -Off) or Recover
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
.'p .`, w.
22
6A
Gypsum_,
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
_
23
-: '6g
- Gypsum
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
=
24
6C:
(iDj
7"A
Gypsum
i Gypsum
r Various
New, Reroof (Tear -Off) or Recover
New, Reroof (Tear -Off) or Recover
l �
Recover
C
E
A-1
Mech. Attached Insulation, Bonded Roof Cover
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover,
Bonded Insulation, Bonded Roof Cover
c`
��
24
24
25-26
713-i Various Recover F Non -Insulated, Bonded Base Sheet, Bonded Roof Cover 26
The following notes aaaly to the systems outlined herein:
_.v
4•. ; Tl a roof=system evaluation herein pertains to above deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction.
Load -resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation.
2' _ Irisulation / base sheet fasteners shall be of sufficient length for the following deck engagement:
➢ Wood: Minimum 0.75-inch penetration.
➢ Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck.
➢ Structural concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation instructions.
3. Unless otherwise noted, insulation may be any one layer or combination of polyisocya nu rate, polystyrene, wood fiberboard, perlite, gypsum -based roof board or mineral -wool roof board that meets the QA
requirements of F.A.C. Rule 61G20-3 and is documented as meeting FBC 1505.1 and, for foam plastic, FBC Chapter 26, when installed with the roof cover. �-
Exterior Research and Design, LLC. d/b/a Trinity) ERD Evaluation Report A42970.10.12-112 for FL16027-R2 Y
Certificate of Authorization #9503 6rM EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017 y
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 1 of 26 `
,I<
F
--Q'TRINIITYIERD
15. Unless otherwise noted, refer to the following references for bonded base, ply or cap sheet applications.
TADLO1 =RUIMRo01`-COVER -
e erence Layer Material Application
BP -AA
Base Ply
FBC Approved ASTM D4601, Type II
HA at 20 40 Ibs/square
Ply
FBC A
Approved ASTM D2178, Type IV or VI
(Base and Ply sheets, Asphalt -Applied)
SBS-AA
Cap Ply
TriBuilt SBS Granular
HA at 20-40 Ibs/square
(SBS, Asphalt -Applied)
SBS-TA
Cap Ply
TriBuilt SBS Granular
Torch -Applied
(SBS, Torch -Applied)
SBS-SA
Base Ply
TIF —vllt SA SBS Base
Self -Adhering
Cap Ply
TriBuilt SA SBS Cap
(SBS, Self -Adhering)
APP-TA
Base Ply or Ply
TriBuilt APP Smooth
Torch -Applied
AS Gap Ply
lbTiFjBUiItTAPPJSMUOtLT, TriBuilt APP Granular
TriBuilt SA APP Cap
(APP, Torch -Applied)
APP-SA
Cap Ply
Self -Adhering
(APP, Self -Adhering)
16. Vapor barrier options for use over structural concrete deck followed by adhered insulation carry the following Maximum Design Pressure (MDP) limitations. The lesser of the MDP listings below vs. those in Table 3A
aoolies:
VAPOR BARRIER OPTIONS; STRUCTURAL CONCRETE DECK; ADHERED. INSULATION PER TABLE 3A
Option #
Primer
Barrier
Insulation Adhesive
MDP (psf)
TypeVapor
Attach
VB-1.
ASTM D41
TriBuilt SA SBS Base
Self -Adhering
Inta-Stik or CR-20, 12-inch o.c.
-60.0
VB-2.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Insta-Stik, 12-inch o.c.
-75.0
VB-3.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Millennium One Step Foamable Adhesive, 12-inch o.c.
-157.5
VB-4.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
CR-20, 12-inch o.c.
-270.0
VB-5.
ASTM D41
TriBuilt SA SBS Base
Self -Adhering
Millennium One Step Foamable Adhesive, Millennium PG-1 Pump Grade
Adhesive, OlyBond 500 or CR-20, 12-inch o.c.
_290.0
17. Dens Deck shall be field -primed with PG100 prior to self -adhering membrane application. Refer to tables herein for other priming requirements.
18. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC 1609 for determination of design wind loads.
Exterior Research and Design, I.I.C. d/b/a Trinity I ERD Evaluation Report A42970.10.12-R2 for FL16027-RZ
Certificate of Authorization #9503 6T" EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 3 of 26
QNTRINITYI ERD
TABLE 1E-2: -WOOD DECKS —NEW CONSTRUCTION, REROOF (TEAR -OFF) OR RECOVER
SYSTEM TYPE E: NON -INSULATED, MECHANICALLY ATTACHED BASE SHEET, BONDED ROOF COVER
System
Base Sheet
Roof Cover (Note 15)
MDP
No.
Deck (Note 1)
Base
Fasteners
Attach
Base Ply
Cap Ply
(psf)
Min. 19/32-inch
Polyglass Elastobase, Polyglass Elastobase
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-inch
(Optional) One or
W-1
plywood at max.
Poly, Polyglass G2 Base, CertainTeed
Roofgrip #14, Dekfast Hex with Dekfast #14
o.c. in two, equally spaced, staggered
more BP -AA or
SBS-AA, SBS-
-52.5
24-inch spans
Glasbase, Firestone MB Base, JM Perma-
or TruFast MP-3 with TruFast HD
center rows
APP-TA
TA, APP-TA
Ply 28, Tamko Glass Base or GAFGLAS #75
Min. 19/32-inch
Polyglass Elastobase or Polyglass
Dekfast Hex with Dekfast #14 or TruFast MP-
12-inch o.c. in 4-inch lap and 12-inch
One or more SBS-
SBS-SA, APP-
W-2
plywood at max.
Elastobase Poly with poly top surface
3 with TruFast HD
in two, equally spaced, staggered
SA
SA, SBS-TA or
52.5
24-inch spans
center rows
cen
APP-TA
Min. 19/32-inch
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-inch
(Optional) One or
SBS-AA, SBS-
W-3
plywood at max.
Elastobase Poly
Roofgrip #12
o.c. in two, equally spaced, staggered
more BP -AA or
TA, APP-TA
-60.0
24-inch spans
center rows
APP-TA
Min. 19/32-inch
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-inch
One or more SBS-
SBS-SA, APP-
W-4
plywood at max.
Elastobase Poly with poly top surface
Roofgrip #12
o.c. in two, equally spaced, staggered
SA
SA, SBS-TA or
24-inch spans
center rows
APP-TA
TABLE 1F: WOOD DECKS— NEW CONSTRUCTION ORREROOF (TEAR -OFF)
SYSTEM TYPE F: NON -INSULATED, BONDED ROOF COVER
System
Roof Cover (Note 15)
MDP
Deck
Primer
Joint Treatment
Base Ply
Ply
Cap Ply
No.
(psf)
W-5
Min. 15/32-inch plywood
(Optional) ASTM D41
-
Norie,
SBS-SA
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
-90.0
at max. 24-inch spans
APP-TA
or APP-TA
rW-6
Min. 15/32-inch plywood
(Optional) ASTM D41
Plywood joints are covered with 4-inch wide strips of TriBuilt SA
TriBuilt SA SBS Base
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
97 5
at max. 24-inch spans
SBS Base, rolled into place to create continuous bond.
APP-TA
or APP-TA
�C'd �:-•wit; - - - -.- . - "•
s
Exterior Research and Design, I.I.C. d/b/a Trinity I ERD Evaluation Report A42970.10.12-R2 for FL16027-RZ
Certificate of Authorization #9503 6P EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 8 of 26 v