Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLOWER DOOR TEST
: 3 12- 0 Address: Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method Permit #: kf5o�5 &-rO3 1 �Y-©03) RECEIVED MAR 13 2018 Permitting D(31113rtment 5t. Lucie CuNflgr jzrc�— ( �) New Construction — Complete ( ) Existing — After Addition ;e Infiltration Test esults SLC Climate Zone 2 (50) = Test Date: me = 90U % u (50) = CFM (50) x 60 / Volume = —1 ' Mechanical Ventilation required less than 3ACH ing results must be & ACH (50) or less q) Pass ( ) Fail Energy building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 2 air changes per r in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a ver door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in :ion 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an roved third party. A written report of the results of the test shall be signed by the party conducting the test and aided to the code official. Testing shall be performed at any time after creation of all penetrations of the building •mal envelope. Residential ere the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a ;sure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. no Company �1 /� 1 ti �G� C/ L pany Name: v Address: (Q (� I W (aYY1 W\DC� c Y-`/ �V ' ° r reby certify that the above Housy Infiltration results demonstrate compliance with FBC Energy Conservation ature: with Seltiop R402.4.1.2 Climate Zone 2. ©0 7- aC� aV---C' nse/Certification #: 3 {' :E S—© 6P12 RECEIVER Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method `1� 2 ) J � � � (( Permit #: � ` actor: tl, t+t- 4 MAR 131018 permitting Department St. Lucie County i/ ,/ I Lot #: Address: 3 I `Y1 r am- Z� V R�� 'Post Construction Test ❑ Rough -in Test sst Conditions: ate: l2 1/1 Floor Area (ft2): me: Primary Location of Supply Ductwork C. door Temperature (F): 7 Primary Location of Return Ductwork IV I A- utdoor Temperature (F): i otai LeaKa e i est vutsiue p D' ct Leakage: ❑ DefauI ❑ Prop. Leak Free Proposed On = OL1 T st Pressure: 5(Pa) r �� B seline Duct Pressure (optional) (Pa) n C ct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: KPass ❑ Fail Installed Pa —71 Total Leakage (cfm): 1 Total Leakage per 100 sgft: ' ,' L+ rr" CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft. ohm any r. Name: 'T Address: (]� %J rn kr y Cv �� L FL T results demonstrate compliance with V, Edition FBC Energy Conservation requirements in accordance with �"L ` License/Certificate #: L �L