Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLOWER DOOR TEST: 3 12- 0
Address:
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
Phone:772-462-2165 Fax:772-462-6443
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
Permit #: kf5o�5 &-rO3 1
�Y-©03)
RECEIVED
MAR 13 2018
Permitting D(31113rtment
5t. Lucie CuNflgr
jzrc�—
( �) New Construction — Complete ( ) Existing — After Addition
;e Infiltration Test esults SLC Climate Zone 2
(50) = Test Date:
me = 90U % u
(50) = CFM (50) x 60 / Volume = —1 ' Mechanical Ventilation required less than 3ACH
ing results must be & ACH (50) or less q) Pass ( ) Fail
Energy
building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 2 air changes per
r in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
ver door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
:ion 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
roved third party. A written report of the results of the test shall be signed by the party conducting the test and
aided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
•mal envelope.
Residential
ere the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a
;sure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
no Company �1 /� 1 ti �G� C/
L pany Name: v Address: (Q (� I W (aYY1 W\DC� c Y-`/ �V ' ° r
reby certify that the above Housy Infiltration results demonstrate compliance with FBC Energy Conservation
ature:
with Seltiop R402.4.1.2 Climate Zone 2.
©0 7- aC� aV---C'
nse/Certification #: 3 {' :E S—© 6P12
RECEIVER
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
`1� 2
) J � � � (( Permit #: � `
actor: tl, t+t- 4
MAR 131018
permitting Department
St. Lucie County
i/
,/ I Lot #:
Address: 3 I `Y1 r am- Z� V R��
'Post Construction Test ❑ Rough -in Test
sst Conditions:
ate: l2 1/1 Floor Area (ft2):
me: Primary Location of Supply Ductwork C.
door Temperature (F): 7 Primary Location of Return Ductwork IV I A-
utdoor Temperature (F):
i otai LeaKa e i est vutsiue p
D' ct Leakage: ❑ DefauI ❑ Prop. Leak Free Proposed On = OL1
T st Pressure: 5(Pa) r ��
B seline Duct Pressure (optional) (Pa) n
C ct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: KPass ❑ Fail
Installed Pa —71
Total Leakage (cfm): 1
Total Leakage per 100 sgft:
' ,' L+ rr"
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft.
ohm any r.
Name: 'T Address: (]� %J rn kr y Cv �� L FL
T
results demonstrate compliance with V, Edition FBC Energy Conservation requirements in accordance with
�"L ` License/Certificate #: L �L