Loading...
HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE�z SCANNED z BY _ _.._.._.. _ .._..._ ... _ _.._.. .p RECEIVED iiz-- : t Sa�fl��➢en®1e guBatiouce,AN 2 2 2019 visgon 2300 Virginia Ave ST. Lucie Count Permitting r-OIt Pierce. FL 34982 v, ... ....... _.....772-462-2 65 Fax 772-462-6443 Request for 30-Day TerI~IaPGraFV Povver Regease Date: __J�l`f ------- Permit Number: Project Address: ,L*3 e�,� J _ W- THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED P AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THEROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. This temporary power release is requested occupancy of any type, other than that per 2. As witness by our signatures, we hereby ar including Building Division Policy, which is I. 3. All conditions and requirements listed in the Power for Testing" have been fulfilled and t 4. All requests for an extension beyond 30 clay the reason for the request. Power may be i the Final Inspection has not been approved the Stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NA OF THIS TRANSACTION, INCLUDING ANY DAMAGE DISCONNECTION OF ELECTRICAL POWER IN THE I OW SIGNATURE CONTRACTOR SIGNATURE br the above stated purpose only, and there will be no pitted by construction during this time period. -ee to abide by all terms and conditions of this agreement, corporated herein by reference. attached document entitled "Requirements for 30 Day ie premise is ready for compliance inspection. s must be made in writing to the Building Official stating moved from the site and/or a Stop Work Order issued if vithin 30 days. A fee of $100.00 will be required to lift ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM WHICH MAY ARISE NOW OR IN THE FUTURE OUT :H MAY BE INCURRED DUE TO THE OF VIOLATION OF THIS AGREEMENT. DATE DATE DATE