Loading...
HomeMy WebLinkAboutBOAT LIFT MOUNTING BRACKETSENGINEERING REVIEW. ' BOAT -LIFT MOUNTING BRACKETS AND SPECIFIED. MOUNTING HARDWARE, COMPLY WITH WIND LOAD•.RE.OUIREMENTS OF THE.677I EDITION- (2017) FLORIDA.BUkDlNG: CODE, . PER ASCE 7-10, AND PER. DESIGN . LOAD. RE(7UIREMEN:TS" OF THE 2015 EDITION ALUMINUM ASSOCIATION'S ALUMINUM DESIGN MANUAL... . MOUNTING BRACKETS INSTALLED PER' HI=TIDE INSTRUCTIONS, .WILL. EXCEED " ULTIMATE. DESIGN WIND SPEED OF 180 MPH (EXPOSURE CkTEGOR'Y -C OR D) BOATS ARE TO BE.REMOVED FROM BOAT LIFTS .PRIOR TO A MAJOR WIND EVENT. /PILINGS _ PILING" PENETRATION TO BE 70.' INTO THE SAND BOTTOM `OR 5' INTO ROCK STRATA, SUB —SURFACE CONDITIONS CAN - VAR`Y GREAT-LY. THE, CONTRACTOR SHALL VERIFY ALL PILE 'CAPACI TIES. TO .COMPLY WITH FBC20lz ALL PILINGS TO BE 10" "MINIMUM DIAMETER 2.5 c.-c.A PRESSURE TREATED WOOD, PRE—STRESSED.CONCRETE OR COMPARABLE EQUIVALENT. . THHE0__7 CONTRACTOR SHALL VERIFY SEAWALL CAPACITIES .TO COMPLY W/ T H F B C 2 0 17. ELECTRICAL REV/EWr X2 ELEC77?ICAL REVIEW. 3/4 HP ELECTRIC MOTOR 1-1/2`HP ELEC7RIC'MOTOR. 70.8 AMPS ® 115V EACH -- AMPS - 0 115V EACH " 5.4 AMPS. ® 230V EACH 9.6 AMPS ® 236V "EACH QUAN7TY 2 QUANTITY.• 2 TOTAL •WATT:£ 2484 TOTAL WATTS: 4416 I NOTE TD EXAMINER: � THIS . CERTIFIED" 'ENGINEERED DRAWING HAS. BEEN, PREPARED i SPECIFICALLY FOR USE ONLY BY 000a0000000000000pOooOo o� m o° 0000?°o p rr. R C_ E N q .-0 °O°000 NO.45856 p AV ED 0-10 �/u►TE o 0: ?0.1� o0 °00Aoo� 0p0 N A 0000pp0 0�000 i 'I ROGER".BARER.. P.E. -NO., 43855 MCR PROFESSIONAL ENGINEERING C.A . N0. 26967 . 1014 NW PINELAKE DR. STUART, -FL 34994_ PILING MOUNTING MINIMUM -(2) 518 DIA . THREADED . ROD PER MOUNT REQUIRED FOR MOUNTING ALTERNATE. SEAWALL MOUNTING MINIMUM. (2), 6186 DIA, ANCHORS REQUIRED' FOR MOUN77NG 10,000 LB. ALUMINUM ELEVATOR & r Boa ruFTS AND MARINE PRODUCTS ALUMINUM ELEVATOR X2 (2017 FBC) o 405'0 sELWTZ ROAD FORT PIERCE, FL 34981 —R: HYDE—SCAL-E•—NTS—DA-7F• 7/2/18—REVA-1 - — — 1-800-544-0735Twww.h"ide.cor,