Loading...
HomeMy WebLinkAboutBLOWER DOOR TESTPlanning & Development Services Building & Code Regulation Division SCANNED 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 B Phone: 772-462-2165 Fax: 772-462-6441LU' d9 G0JJD BLOWER DOOR TEST FORM �,...,.,..,.. >,13........ <:.,. ,..,, .,_.,..House Infiltration Prescriptive and Performance Method 2-�I_ I ?D1o,- Permit #: SLC, Zw- b r s Jo4 Address: C C '� struction: (✓ —New Construction —Complete ( ) Existing —After Addition Huse InfiltratiVEest Results SLC Climate Zone 2 Crm (50) = Test Date: Vplume= /a 3a' ARCH (50) = CFM (50) x 60 / Volume = 5 Mechanical Ventilation required less than 3 ACH P�ssing results must be & ACH (50) or less ( Pass ( ) Fail Energy building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a /er door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in ion 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an •oved third party. A written report of the results of the test shall be signed by the party conducting the test and sided to the code official. Testing shall be performed at any time after creation of all penetrations of the building mal envelope. , Residential are the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a ;sure of 0.2 inch w. c. (50 Pa) in, accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Name: 15 Lightyears INC Address: 776 Bennet Drive Longwood FI 32750 !reby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation uirements in accordMca-with Section R402.4.1.2 Climate Zone 2. re: Pi l;�nted Name: P,1/%�yY�S S Li l ense/Certification #: _ Planning>t;<.Aevelopment Seruices ,. Building 4.,.Code Regulation Division 2300 Virginia Ave, Rm 201 r� ti,... Fort. Pierce;.FL.3:4982., .. 772-462-2165 Fax 772-462-6443 y DEC 2 6 2018 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method ST. Lucie Countyf Pa1'ffiM9 )xj Contractor, h'i Address: J�-�3U 19141 o� I AGE Cj&_e,%C— Conl traction: ❑ Pos Construction Test ❑ Rough -in Test T st Conditions: DAte: �a a� �O/t; Floor Area (ft2): �ys� T e: Primary Location of Supply Ductwork Ir oor Temperature (F): % 3 Primary Location of Return Ductwork C ytdoor Temperature (F): /,.I Leakage: ❑ Default mop. Leak Free Pressure: (Pa) line Duct Pressure (optional) (Pa) Press. (Pa) Flow Ring Fan Press Flow ❑ Proposed On = O. oS ❑ Pass ❑ Fail Total Leakage (cfm): Total Leakage per 100 sgft:� CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft. company iy Name: f r, LlerS Address: Yt Z& certify that the above Du ealing Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with R403.2.2. re: u Name: �.1/i'+'t /Dwel License/Certificate#: Certificate of Achievement THIS ACKNOWLEDGES THAT Will Torres HAS MET THE STANDARD REQUIRED. BY RESNET, AS A CERTIFIED HOME ENERGY RATER RT IN # 9704654 Certification Date: November 7, 2018 Certification Expires: November 7, 2021 Tim Smith, RESNET Quality Assurance Designee 0 RESNET QA Provider # (1998-199)