HomeMy WebLinkAboutBLOWER DOOR TESTPlanning & Development Services
Building & Code Regulation Division SCANNED
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982 B
Phone: 772-462-2165 Fax: 772-462-6441LU' d9 G0JJD
BLOWER DOOR TEST FORM
�,...,.,..,.. >,13........ <:.,. ,..,, .,_.,..House Infiltration
Prescriptive and Performance Method
2-�I_ I ?D1o,- Permit #: SLC, Zw- b r s
Jo4 Address:
C
C '� struction: (✓ —New Construction —Complete ( ) Existing —After Addition
Huse InfiltratiVEest Results SLC Climate Zone 2
Crm (50) = Test Date:
Vplume= /a 3a'
ARCH (50) = CFM (50) x 60 / Volume = 5 Mechanical Ventilation required less than 3 ACH
P�ssing results must be & ACH (50) or less ( Pass ( ) Fail
Energy
building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per
in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
/er door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
ion 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
•oved third party. A written report of the results of the test shall be signed by the party conducting the test and
sided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
mal envelope.
, Residential
are the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a
;sure of 0.2 inch w. c. (50 Pa) in, accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
Name: 15 Lightyears INC
Address: 776 Bennet Drive Longwood FI 32750
!reby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation
uirements in accordMca-with Section R402.4.1.2 Climate Zone 2.
re:
Pi l;�nted Name: P,1/%�yY�S
S Li l ense/Certification #:
_ Planning>t;<.Aevelopment Seruices ,.
Building 4.,.Code Regulation Division
2300 Virginia Ave, Rm 201 r�
ti,... Fort. Pierce;.FL.3:4982., ..
772-462-2165 Fax 772-462-6443 y
DEC 2 6 2018
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method ST. Lucie Countyf Pa1'ffiM9
)xj
Contractor, h'i Address: J�-�3U 19141 o� I AGE Cj&_e,%C—
Conl traction: ❑ Pos Construction Test ❑ Rough -in Test
T st Conditions:
DAte: �a a� �O/t; Floor Area (ft2): �ys�
T e: Primary Location of Supply Ductwork
Ir oor Temperature (F): % 3 Primary Location of Return Ductwork
C ytdoor Temperature (F): /,.I
Leakage: ❑ Default mop. Leak Free
Pressure: (Pa)
line Duct Pressure (optional) (Pa)
Press. (Pa) Flow Ring Fan Press Flow
❑ Proposed On = O. oS
❑ Pass ❑ Fail
Total Leakage (cfm):
Total Leakage per 100 sgft:�
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft.
company
iy Name: f r, LlerS Address: Yt Z&
certify that the above Du ealing Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with
R403.2.2.
re: u
Name: �.1/i'+'t /Dwel License/Certificate#:
Certificate of Achievement
THIS ACKNOWLEDGES THAT
Will Torres
HAS MET THE STANDARD REQUIRED. BY RESNET, AS A
CERTIFIED HOME ENERGY RATER
RT IN # 9704654
Certification Date: November 7, 2018
Certification Expires: November 7, 2021
Tim Smith,
RESNET Quality Assurance Designee
0
RESNET QA Provider # (1998-199)