Loading...
HomeMy WebLinkAboutINSULATION-INSTALLATION CERTIFICATE3601-A Crossroads Parkway Fort Pierce, FL 34945 404833147 Gale Insulation SCANNED By Co'bd,� r FILE COPY INSULATION INSTALLATION CERTIFICATE BUILDER: NVR Inc D/B/A Ryan Homes SUBDIVISION: Oakland Lake JOB ADDRESS: 5230 Oakland Lake Cir CITY: Vero Beach PERMIT#: 38 The undersigned hereby certifies that insulation has been installed in the above property as follows: 1. Exterior CBS walls have been insulated with Reflective Foil to thickness of .75" inches, which according to Fi-Foil Company will yield an "R" value of 4.1 2. Exteriorframe wall has been insulated with to a thickness of inches, which according to will yield an "R" value of . 3. Ceiling Area (flat) has been insulated with Fiberglass Blow to a thickness of 1 3" inches, which according to Knauf will yield an "R" value of 38 4. Ceiling Area (vaulted) has been insulated with to a thickness of inches, which according to will yield an "R" value of S. Interior knee walls have been insulated with to a thickness of inches, which according to will yield an "R" value of 6. Garage common walls adjacent to conditioned living space have been insulated with Fiberglass Batt to a thickness of 3•5" inches, which according to Knauf will yield an "R" value of 13 General Contractor/Builder Insulation Contractors Signature License # CGC1512179 Signature THE AFFIANT, Jeremy Theisen IS PERSONALLY KNOWN TOME. Sworn to and subscribed before me this 3 day of December 20 1e . r;-,, Notary Public, State of Florida rNNIFERSWEE1 / 'r`�•,,Ip�" Nct�ryPUblic-Sia:eolf�orloa Commisian s CC �pJt t •"'r:{ i ` '' A7yComm., pi";aAn29,2021 / Planning &]Development Services Department Building & Code Regulations Division a Avenue Ft Pierce, FL 34982 Phone: 772- 462-2165 Fax: 772-462 2522 S� <GCP p�pd �0%® Request for 30-Day Temporary Power Release c�°11� P:t t 4/ A5 Permit Number: —o Z-f 8 ect Address: Sl- 10 Orae4,D - L * kl� C, •►- UNDERSIGNED HEREBY REQUEST .RELEASE OF ELECTRICAL POWER TO THE I VE•DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR FINAL ECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY NOWLEDGE AND AGREE AS FOLLOWS: 1. This temporary power release is requested for the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signature's, we hereby agree to abide by all terms and conditions of this agreement, including Building Division Policy, which is incorporated herein by reference. 3. All conditions and requirements listed in the attached document entitled "Requirements for 30 Day Power for 4. Testing" have been fulfilled and the premise is ready for compliance inspection. S. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if the Mal Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift the Stop Work Order. HEREBY RELEASE AND AGREE TO HOLD HARMI ESS, ST. LUCIE COUNTY, AND :IR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE [CH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF CTRIJUAL POWER IN ZHE EVENT OF VIOLATION OF THIS AGREEMENT. SIGNATURE Revised 06/14/2010 111, yy DATE DATE //- / I'll -Ld�� DATE