Loading...
HomeMy WebLinkAboutSEWAGE CONSTRUCTION INSPECTION & FINAL APPROVALSCANNED STATE OF FLORIDA ;.` DEPARTMENT OF HEALTH T� ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL APPLI ANT: Tabitha Hestor AGENT, Groza Builders, Inc. PROPS TY ADDRESS; 3136 Brocksmith Rd FortPierce, FL 34945 LOT: J BLOCK: SUBDIVISION: Drawdy/Brocksmith Rd ID#: 2329-502-0006-000-9 APPLICATION #:AP1362994 PERMIT #:56-SF-1875323 DOCUMENT #: FI1289255 DATE PAID:09/06/2018 FEE PAID:515.00 RECEIPT #:56-PID-3701664 JUN 0 7 2019 S t1� , LUCIe COuntl/_ PormiF4:__ l CHECKED [XI ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED. TANK INSTALLATION SETBACKS [ ] [01] TANK SIZE [11 1090.00 [21 [ ] [271 SURFACE WATER 78 FT [ ] [021 TANK MATERIAL Polypropy[ene [ ] [28] DITCHES 78 FT [ I [03] OUTLET DEVICE [ ] [291 PRIVATE WELLS 79 FT [ ] [041 MULTI -CHAMBERED [ Y N I [ ] [301 PUBLIC WELLS FT [ ] [051 OUTLET FILTER Polylok PL-68 [ ] [311 IRRIGATION WELLS FT [ ] [061 LEGEND 1, 70-143-11DC3 2, [ ] [321 POTABLEWATER 51 FT [ ] (07] WATERTIGHT [ ] [331 BUILDING FOUNDATIONS' 5 FT [ ] 1081 LEVEL [ ] [341 PROPERTY LINES 33 FT [ ] [091 DEPTH TO LID [ ] 1351 OTHER FT DRAINFIELD INSTALLATION FILLED / MOUND SYSTEM [ ] [101 AREA [11 679.2 (21 SOFT [ ] [361 DRAINFIELD COVER [ ] (111 DISTRIBUTION BOX HEADER X [ ] (371 SHOULDERS [ ] [121 NUMBER OF DRAINLINES 1. 6.00 2. [ ] [381 SLOPES ] [131 DRAINLINE SEPARATION [ ] [391 STABILIZATION 05/28/2019 [ ] [141 DRAINLINE SLOPE [ ] [151 DEPTH OF COVER ADDITIONAL INFORMATION [ ] [16] ELEVATION [ ABOVE / BEZOW IBM 6.00 [ ] [401 UNOBSTRUCTED AREA [ ] [171 SYSTEM LOCATION [ ] [411 STORMWATER RUNOFF [ ] [181 DOSING PUMPS [ ] [421 ALARMS [ ] [191 AGGREGATE SIZE [ ] (431 MAINTENANCE AGREEMENT [ ] [201 AGGREGATE EXCESSIVE FINES [,1 [441 BUILDING AREA [ ] (211 AGGREGATE DEPTH [ ] (451 LOCATION CONFORMS WITH SITE PLAN FILL / EXCAVATION MATERIAL [ ] [461 FINAL SITE GRADING I ] [221 FILL AMOUNT [ ] [47] CONTRACTOR MICHAEL W STUHR (ASHTO C ] [231 FILL TEXTURE [ ] [481 OTHER INFILTRATOR Quick4 Plus EQ36 LP [ ] (241 EXCAVATION DEPTH ABANDONMENT [ ] 125J AREA REPLACED [ ] [491 TANK PUMPED [ ] [261 REPLACEMENT MATERIAL [ ] [501 TANK CRUSHED 6 FILLED Commen s: Comments are on page 2. CONSTR CTION [ APPROVED / DISAPPROVED St. Lucie CHD DATE: 03/26/2019 Enviro entai Specials B Ingram (ENVIRONMENTAL HEALTH) FINAL ( STEM DISAPPROVED ]: LUCIe CHD DATE: 05/28/2019 (Explanation of Violations on following page) DH 4016l08/09 (Obsoletes all previous editions which may not be used) Incorpoated: 64E-6.003, PAC EH Database v 1,0.1 AP1362994 EID1875323. i Page 2 of 3 w The STATE OF FLORIDA DEPARTMENT OF HEALTH ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL Comment APPI.ICAT=oN #:A.P1362994 PERMIT #:56-SF' 1875323 DoctnlmNT #:F11289256 DATEPAID::09/06/2018 FEE PAID 4515.0.6 RECEIPT #.:56-PI:D-3701664 is sized for 4 bedrooms with a maximum occupancy. of 8 persons (2 per bedroom), for a total estimated flow of 400 filter, and 6x10 long DF installed. No violations,, system dk to:cover. Contractor notified onsite. Need final inspection for tstem and°final site grading. ternapproved. Contractor and building department.eniailed final approval. DH 401, 08/09 (Obsoletes all previous editions which may not be used) I Inco rated: 64E-6.003, FAC Page 2 of 3 EH Database v•.01 AP1362994 EID1875323