HomeMy WebLinkAbout0710-0338 BUILDING PERMITIssued
Job Lc
Permit
Job De
Code Compliance Division
2300 Virginia Avenue
Ft. Pierce, FL 34982
ie: (772) 462-2172 Fax: (772) 462-6443
i.stiucieco.org/public—works/permifting.htm
BUILDING PERMIT
BY
19t, ;"Lucie coal
Ij
2/17/2009 Conf #: 665 Permit #: SLC- 0710-0338
o 11. I . 170 BOYD RD City: FORT PIERCE
e Building Commercial
ption: NEW CONSTRUCTION OF A 40' X 60' METAL STORAGE FACILITY - PHASE I I
S/D Carboy Industrial Park Unit 1 Lot: 3 Block: Parcel: 2212-500-0005-000/7
Contractor MCGEE DAVID HARDEN & MCGEE CONSTRUCTION (863) 634-7490
1111 NW 2ND ST OKEECHOBEE, FL 34972
Property O finer BURNSED PROPERTIES INC (772) 215-5140
I4409 SE BAYSHORE TERR STUART, FL 34997
I
Setbacks Left: 34.40 Right: Front:184.00 Rear: 25.00 Zoning: IL
Number Iof Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 2,400.00
Minimum, Floor Elevation: Flood Map: 150 Flood,Zone: X Elev:
Page 1
Permit hold r acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code
including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all
requirements of the 2004 Florida Building Code.
NOTICE: I I addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the
records of t is County, and there may be additional permits required from other governmental entities such as water management districts, state
agencies, o federal agencies. s:553.79(10), F.S.
WARNINGIITO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDING!,IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S.
IIChristopher Lestrange o7 — ) �7 —
Building Official Date
For Automated Inspections, Call (772) 462-1261
For Questions, Call (772) 462-2172
St. Luce County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and
become null and void if work authorized by such Building Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is
not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance
of the Building Permit.