Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutENGINEERING=Y.
A
A2
A2
A3
A4
A5G1
A5G
AG
AG
AG
AG
B
B1
B2
CA
CA
.. ' "'Ijq '
n d � *71A hh, oh,
AIIIIIIIIIIII
psad EVER
THE MONARCH COMPANY
SCANNED
�e Lucia C08
ENGINEERED, SIGNED AND SEALED DRAWING INDEX
St Lucie Oaks
American Made Contractors
The Monarch Company Job #0710017,
:Description Date/Time
8.5X11 A Truss Shop Drawing Pg.1 4.28.08 10:05:25
8.5X11 A2 Truss Shop Drawing Pg.1 4.29.08 13:54:14
8.5X11 A2 Truss Shop Drawing Pg.2 4.29.08 13:54:14
8.5X11 A3 Truss Shop Drawing Pg.1 4.28.08 10:05:38
8.5X11 A4 Truss Shop Drawing Pg.1 4.28.0810:05:44
8.5X11 A5G Truss Shop Drawing Pg.1 4.29.0813:31:54
8.5X11 A5G Truss Shop Drawing Pg.2' 4.29.0813:31:54
8.5X11 A-ELE Truss Shop Drawing Pg.1 4.28.0810:07:03
8.5X11 AFG Truss Shop Drawing Pg.1 4.28.0810:07:04
8;5X11 AFG Truss Shop Drawing Pg.2 4.28.08 10:07:04
8.5X11 AG Truss Shop Drawing Pg.1 4.29.08 13:39:46
8.5X11 AG Truss Shop Drawing Pg.2 4.29. 8 13:39:46
8.5X11 AG1. Truss Shop Drawing Pg.1 9
9. 8 13:48:55
8.5X11 AG1 Truss Shop Drawing Pg.2 813:48:55
8.5X11 B Truss Shop Drawing Pg.1 .215:08:18
8.5X11 B1 Truss Shop Drawing Pg.1 4.29.08 15:23:50
8.5X11 B2 Truss Shop Drawing 1 429.08 10:26:55
8.5X11 BFG Truss Shop D &aw • P .1 4.28.08 10:26:55
8.5X11 BFG Truss 4.28.08 10:26:55
8.5X11 CA Truss Sh , r 4.28.08 10:26:56
8.5X11 CA1 Truss Sh Dr ing Pg.1 4.28.08 10:26:57
'i
iteviewed- And Approved C] Not Appro;Q-
Approved As Corrected Revie* Not Nvai�
Review and.appro the design coAtOpthf
pmjeot and cu a Contract DocUtrAft
KA L F. LEDERER P.E. Contractor is ; ' and correlatd 42
FL.' O.E..#41917 "job site; to •.brication procesMtl
165I 0 VAN•GOGH BLVD. onto techniqu, the work otslt
��^ I' yTCHEE FL 33470 RoWew and app.�... ��...�����i irom compliaace
led 'revs@Bellsouth.net �Dkractdrawin sad can do s. _ w-'
561 422-3215
Y Revl�wedDft
I 4001 S.E. Commerce Avenue Stuart, FL 34997 i TEL. ( 772) 283-4001 i FAX (772) 22:
CD
CD1
CK
CL
CL1
CI-2
CM
CN
CR
CR1
CR2
D
D1
D2G
D2G
EA
ED
EJB
EK
EKGE
EL
� in qbmh- I h,
THE MONARCH'COMPANY
ENGINEERED, SIGNED AND SEALED DRAWING INDEX
St Lucie Oaks
American Made Contractors
The Monarch Company Job #0710017
Description
Date/Time
8.5X11 CD Truss Shop Drawing Pg.1
4.28.08 10:36:57
8.5X11 CD1 Truss Shop Drawing Pg.1
4.28.08 10:26:58
8.5X11 CK Truss Shop Drawing Pg.1
4.28.08 10:26:58
8.5X11 CL Truss Shop Drawing Pg.1
4.28.0810:26:59
8.5X11 CL1 Truss Shop Drawing Pg.1
4.28.0810:26:59
8.5X11 CI-2 Truss Shop Drawing Pg.1
4.28.0810:27:00
8.5X11 CM Truss Shop Drawing Pg.1
4.28.08 10:27:00
8.5X11 CN Truss Shop Drawing Pg.1
4.28.08 10:27:01
8.5X11 CR Truss Shop Drawing Pg.1
4.28.08 10:27:02
8.5X11 CR1 Truss Shop Drawing Pg.1
4.28.08 10:27:02
8.5X11 CR2 Truss Shop Drawing Pg.1
4.28.0810:27:03
8.5X11 D Truss Shop Drawing Pg.1
4.28.0810:27:05
8.5X11 D1 Truss Shop Drawing Pg.1
4.28.0810:2 . 8
8.5X11 D2G Truss Shop Drawing Pg.1
1
8.5X11 D2G Truss Shop Drawing Pg.2
• A 1
8.5X11 EA Truss Shop Drawing Pg.1
0:27: 2
8.5X11 ED Truss Shop Drawing Pg.1
88 0:27:23
CO29-
8.5X11 EJB Truss Shop Drawing Pg.1
8 10:27:24
8.5X11 EK Truss Shop Drawing P 1
..810:27:25
8.5X11 EKGE Truss Shop Dr g
4.29.0816:06:31
8.5X11 EL Truss Shop Drawin
4.28.0810:27:25
KARL i. LEDERER P.E.
FL. P. #41917
y 16500 AN GOGH BLVD.
LOXA' �4TCHEE, FL 33470
ledere_@Bellsouth.net
561-42;2-3215
Cyr'
4001 S.E. Commerce Avenue I Stuart, FL 34997 1 TEL. (772) 283-4001 �
FA (77) -3 39
EL1
EL2
EM
EN
EN1
ER
FGB
FGB
HA
HA
HD
HD
HK
HK
HL
HL
HU
HM
HN
HN
HN1
KARLF
FL. P.E
16500
561
� LLA h I qmbh
THE MONARCK'COMPANY
1.1
ENGINEERED, SIGNED AND SEALED DRAWING INDEX
St Lucie Oaks
American Made Contractors
The Monarch Company Job #0710017
Description Date/Time
8.5X11 EL1 Truss Shop Drawing Pg.1 4.28.08 10:27:26
8.5X11 EL2 Truss Shop Drawing Pg.1 4.28.08 10:27:26
8.5X11 EM Truss Shop Drawing Pg.1 4.28.08 10:27:27
8.5X11 EN Truss Shop Drawing Pg.1 4.28.08 10:27:28
8.5X11 EN1 Truss Shop Drawing Pg.1 4.28.08 10:27:28
8.5X11 ER Truss Shop Drawing Pg.1 4.28.08 10:27:29
8.5X11 FGB Truss Shop Drawing Pg.1 4.28.0810:27:30
8.5X11 FGB Truss Shop Drawing Pg.2 4.28.08 10:27:30
8.5X11 HA Truss Shop Drawing Pg.1 4.28.08 10:27:56
8.5X11 HA Truss Shop Drawing Pg.2 4.28.08 10:27:56
8.5X11 HD Truss Shop Drawing Pg.1 4.28.08 10:27:56
8.5X11 HD Truss Shop Drawing Pg.2 4.28.08 10:27:56
8.5X11 HK Truss Shop Drawing Pg.1 4 8.0810:27:57
8.5X11 HK Truss Shop Drawing Pg.2 8.08 10:27:57
8.5X11 HL Truss Shop Drawing Pg.1 014. • .08 15:05:47
8.5X11 HL Truss Shop Drawing Pg.2 4.28.0815:05:47
8.5X11 HL1 Truss Shop Drawing Pg.1 4.28.08 10:27:59
8.5X11 HM Truss Shop Drawi g.1 C; 4.28.08 10:28:00
8.5X11 HN Truss Shop D wi .1 4.28.08 10:28:02
8.5X11 HN Truss S in 4.28.08 10:28:02
8.5X11 HN1 Truss g.1 4.28.08 10:28:02
LEDERER P.E.
V41917
\N GOGH BLVD.
TCHEE, FL 33470
aBellsouth.net
3215
4001 S.E. Commerce Avenue i Stuart, FL 34997 1 TEL. ( 772) 283-4001 i
FAX (772) 83-3339
01
HR
HR
HR1
K1 G
K1 G
K2
K3
K4
K5
K6
K7
K8G
K8G
LG
LG
LG1
LG1
LG2
LG2
L3
M
i
KARL FI
�- FL. P.E.'
0
16500 V
LOXAH/
lederers
1 561-422
, pai a 1:1 � im an Mh. q_0 b h
R VIj 111%
THE MONARCH 'COMPANY
ENGINEERED, SIGNED AND SEALED DRAWING INDEX
St Lucie Oaks
American Made Contractors
The Monarch Company Job #0710017
Description
Date/Time
8.5X11 HR Truss Shop Drawing Pg.1
4.28.08 10:28:04
8.5X11 HR Truss Shop Drawing Pg.2
4.28.08 10:28:04
8.5X11 HR1 Truss Shop Drawing Pg.1
4.28.08 10:28:04
8.5X1'1 K1 G Truss Shop Drawing Pg.1
4.28.08 10:29:35
8.5X11 K1 G Truss Shop Drawing Pg.2
4.28.08 10:29:35
8.5X11 K2 Truss Shop Drawing Pg.1
4.28.08 10:29:37
8.5X11 K3 Truss Shop Drawing Pg.1
4.28.08 10:29:39
8.5X11 K4 Truss Shop Drawing Pg.1
4.28.08 10:29:40
8.5X11 K5 Truss Shop Drawing Pg.1
4.28.08 10:29:42
8.5X11 K6 Truss Shop Drawing Pg.1
4.28.08 10:29:43
8.5X11 K7 Truss Shop Drawing Pg.1
4.28.08 10:29:45
8.5X11 K8G Truss Shop Drawing Pg.1
4.28.08 10:29:49
8.5X11 K8G Truss Shop Drawing Pg.2
08 10:29:49
8.5X11 LG Truss Shop Drawing Pg.1
08 16:28:00
8.5X11 LG Truss Shop Drawing Pg.2
8.5X11 LG1 Truss Shop Drawing Pg.1
08 16:39:29
8.5X11 LG1 Truss Shop Drawing Pg.2
4.28.08 16:39:29
COVIO816:28:00
8.5X11 LG2 Truss Shop DrawVPg.1
4.28.08 10:30:09
8.5X11 LG2 Truss Sho r wi g.2
4.28.08 10:30:09
8.5X11 L3 Truss S 'ng `
4.28.08 16:43:19
8.5X11 M Truss Sh r i . g.1
4.28.08 10:30:10
LEDERER P.E.
041917
►N GOGH BLVD.
TCHEE, FL 33470
5
1 S.E. Commerce Avenue I Stuart, FL 34997 I TEL. ( 772) 283-4001 1 FAX 2) 283-3339
O 0 • . •
�a.
6�
L
MG
MG
N
N1G
N1G
PBA
PBA1
PBA2
PBB
PBB1
PBD
PBK
PBK1
PBK2
R3
RG
RG
RG1
RG2
RG2
KARL F
FL. P.E.
16600 VA
LOXAHP
r lederers
561-422.
� P4�pl h � im I h qm_ a h,
THE MONARCH COMPANY
ENGINEERED, SIGNED AND SEALED DRAWING INDEX
St Lucie Oaks
American Made Contractors
The Monarch Company Job #0710017
Description Date/Time
8.5X11 MG Truss Shop Drawing Pg.1 4.28.08 10:30:12
8.5X11 MG Truss Shop Drawing Pg.2 4.28.08 10:30:12
8.5X11 N Truss Shop Drawing Pg.1 4.28.08 10:30:13
8.5X11 N1G Truss Shop Drawing Pg.1 4.28.08 10:30:15
8.5X11 N 1 G Truss Shop Drawing Pg.2 4.28.08 10:30:15
8.5X11 PBA Truss Shop Drawing Pg.1 4.28.0810:30:16
8.5X11 PBA1 Truss Shop Drawing Pg.1 4.28.08 10:30:18
8.5X11 PBA2 Truss Shop Drawing Pg.1 4.28.08 10:30:19
8.5X11 PBB Truss Shop Drawing Pg.1 4.29.08 13:51:55
8.5X11 PBB1 Truss Shop Drawing Pg.1 4.29.08 09:04:06
8.5X11 PBD Truss Shop Drawing Pg.1 4.29.68 14:02:22
8.5X11 PBK Truss Shop Drawing Pg.1 4. 8.08 10:30:22
8.5X11 PBK1 Truss Shop Drawing Pg.1 4 8.08 1.0:30:22
8.5X11 PBK2 Truss Shop Drawing Pg.1 8.08 10:30:23
8.5X11 R3 Truss Shop Drawing Pg.1 4. .08 10:30:24
8.5X11 RG Truss Shop Drawing Pg.1 4.29.08 14:18:07
8.5X11 RG Truss Shop Drawing Pg.2 4.29.08 14:18:07
8.5X11 RG1 Truss Shop Drawin Pg.1 4.29.0814:33:30
8.5X11 RG1 Truss Shop DrawtW.1 4.29.0814:22:49
8.5X11 RG1 Truss,Sh PI
V\P
2 4.29.08 14:22:49
;DERER P.E.
1917.
GOGH BLVD.
:HEE. FL 33470
5
S.E. Commerce Avenue 1 Stuart, FL 34997 1 TEL. ( 772) 283-4001 1 FAX (77 ) 283-3339
V�
JUL)
I
0710017
s
ROOF TRUSS 13 11 J A
Apr
SCREW CITY (Total = 455 ). All Screws Are #12-14 T/3
CHORDS 1-2:2, 6-5:1 16-7:16, 8-7:21, 8-9:20, 11-10:16, 11-12:16, 16-15:2
WEBS 2-28:3, 3-27 5, 3-28:14, 4-26:2, 4-27:5, 5-25:5, 5-26:2, 6-24:4, 6-25:5, 7-24:5, 9-21:2, 9-22:2, 9-24:2, 10-21:5, 11-20:5, 11-21:4, 12-19:2, 12-20:5, 13-18:5, 13-19:2, 14-17:14,
14-18:5, 15- 7:3
j 6-0-0 5-0-8 5-0-8 , 5-0-8 5-0-8 -4-
� Iz�O 508�508 � 5� pg ,�08 600 600_} 60=0 1 �
2-4-0 77-4-8-8 12-5-0 17-5-8 22-6-0 28-6-0 34-6-0 40-6-0 46-6-0 51-6-8 56-7-0 61-7-8 66-8-0 69-0-0
T
TOP
BOT
v
o�
700
4.50 IF 12
525USZD0975cg8USWD073x24" 525USZD097x10
iL to IN
2-0-0
o-a-o
2-0- 6-8-11 6-8-11
6-8-1 1 6-0-0 6-0-0 6-0-0
6-0-0 6-8-11
6-8-11 6-8-11 0 -0
2-0-0 9-0-11 15-9-5
22-6-0 28-6-0 34-6-0 40-6-0
46-6-0 53-2-11 59-11-5 66-B-067-0
6 9-0-0
2-4-0
CITY
i 1-28:13, 16i17:13, 23-22:21, 23-24:21
22-9:2, 24-6:5, 24-7:5,
27-4.
24-9:2, 25-5:5, 25-6Truss
17-14:17, 1,7-15:14, 18-13:5, 18-14:5, 19-12:2, 19-13:2, 20-11:5, 20-12:5,
21-9:2, 21-10:5, 21-11:5,
weight= 567 Ibs
28-2:14, 2�� 3:17
CSI
DEFL
(in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
(psf)
SPACING 4-0-0
TC 0.94
Vert(LL)
1.08 22 >713
035 2561b 046 4501b
20.0
Code
FBC/AISI
BC 0.89
Vert(TL)
-0.93 22 >827
057 5401b 073 6561b
15.0
WB 0.97
Horz(TL)
-0.39 17 n/a
097 6621b #
0.0
(Matrix)
Min Length / LL defl = 240
10.0
L SECTION li, BRACING
CHORD 35 US '073 50 TOP CHORQ4-O-O
6-11, 1-16
CHORD 55 USD 057 50 BOT C OR ter bracing 1-16
S 362 S 5 50 50 'Except' W 1 50 3-28 Attach to back of member full length
W1 36 USWD 046 50, W2 362 USWD 073 50, W9 362 USWD 073 50 w/717 Att 4 sds at each end and ull oc along length
W11 362 USWD 046 50, W13 362 USWD 046 50 14ga 50 1 7-# Attach s back of member full length
W15 3 � USWD 073 50, W22 362 USWD 073 50 w/7 12-14 sds at each end and 12" oc along length
W23 362 USWD 046 50
:TIONS QUsize/Iterial)28/0-8-0/CON, 17/0-8-0/CON
Max DoF 28=6201(load case 1), 17=6201(loa \2)
Max Upli 28=-6087(load case 2), 17=-6087(loa s
:ES (lib) Max. C61 pression Force
CHORD 1-2=-1363, 2-3=-1594, 3-29=-9910, 4-29=-9825, 4-30=-10644, 5-30=-10523, 5-6=-9913, 6-7=-10306, 7-31=-10306, 8-31=-10306, 8-9=-10306, 9-32=-10306,
10-32-J110306, 10-11=-10306, 11-12=-9913, 12-33=-10523, 13-33=-10644, 13-34=-9825, 14-34=-9910, 14-15=-1594, 15-16=-1363
CHORD 1-2840 27-28=-6766, 26-27=-7653, 25-26=-7577, 24-25=-6816, 23-24=-8014, 22-23=-8014, 21-22=-8014, 20-21=-6816, 19-20=-7577, 18-19=-7653, 17-18=-6766,
16-17�0
2-28=; 82, 3-28=-9193, 3-27=-586,4-27=-1171, 4-26=-266, 5-26=0, 5-25=-1103,6-25=-893, 6-24=-1691, 7-24=-939, 9-24=-920, 9-22=0, 9-21=-920,10-21=-939,
11-211691, 11-20=-893, 12-20=-1103, 12-19=0, 13-19=-266, 13-18=-1171, 14-18=-586, 14-17=-9193, 15-17=-882
1) T is truss has bee designed for unbalanced loading conditions.
2) T, is truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h =
33.8 ft., Exposure Category C, Enclosed Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00. InteriorRoof Zone, "a" distance =
7!g0 ft. using a to chord tributary area of 1584.65 sq. ft., 0.6 DL applied. Design Velocity Pressure, qh = 42.94 psf.
3) WARNING: The uEa"
ually long span and/or configuration of this truss requires that extreme care be used in its application. Use
proper transportatunloading and erection methods. Assure that all required web lateral bracing is communicated to the building
contractor. Ensurat over-all building bracing is designed by a qualified engineer, architect, or building designer.
4) Pri+lvide adequateinage to prevent water ponding.
5) Tlop chord load ap plied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stadard
+i
� I
10017
.ucie Oaks Commercial Center
Truss Type
Oty
Ply
Truss
ROOF TRUSS
5
1
A2
16-32 s Sep 25 2007 Aegis Metal Framing, LLC Tue Apr 29 1335:14 2008 Page 1
s 1
r
QTY (Total = 845). All Screws Are #12-14 T/3
i 1-2:4, 5-4:16, 5-6:23, 7-6:25, 7-8:24, 11-10:27, 11-12:24, 17-16:4
2-31:15, 2-32 j� 13, 3-30:4, 3-31:6, 4-29:3, 4-30:2. 5-28:6. 5-29:4. 6-28:4. 8-25:3, B-26:2, 8-28:3. 9-25:3, 10-23:16, 10-24:16, 10-25:6, 11-23:10, 12-22:9, 12-23:7, 14-20:15,
14-22:19, 1 I1
9:7. 15_20:8, 16-18:13, 16-19:26
II 0-1-13 2-5-0
9-0-11 15-9-5 22-6-0 27-8-0 32-10-0 38-0-0
4.50 12 7000SZDOMU8Wq
46X
F T2 6-5 8
I 3
T 3
.'•, i 3
o, 6 4 4
C 1 4 2 6 4 2
o0I '` 8
7000S j DM*12 31 30
d C6K
5-0-3 3-4-0 2-5-q , 5-1-5
43-0-3 46-6-0 51-4-0 56-5-5
43-2-0 48-11-0
61-6-11 66-8-0 69-0-0
29 28 27 26 2570002S�D073x12j4) 20
60USWD057xl87000SZD073x1 Q(2)00 12
31% w
0
wl
7
Ico CD
O
197000 x12
.._ 2-0-0
o-a-o
0- 6-8-11 6-8-11 6-8-11 5-2-0 5-2-0 5-2-0 1 5-2-0 3-2-0 5-0-0 1 5-1-5 5-1-5 5-1
2-0-0 9-0-11 15-9-5 22-6-0 27-8-0 32-10-0 38-0-0 43-2-0 464-0 514-0 56-5-5 61-6-11 66-8-0 69-0-0
67-0-0
2-4-0
QTY 11
3 1-32:8, 13-22:2, 17-18:8. 21-22:2, 22-13:36, 22-23:25, 23-22:25. 23-24:25, 24-23:25, 24-25:19, 27-26:21, 27-28:21
18-16:14. 115:7, 19-16:26, 20-14:15, 20-15:8, 20-22:22, 22-12:9, 22-14:19, 22-20:18, 23-10:16, 23-11:10, 23-12:77.24�-1
�o_o.z oa_ z �s0 o-F•a -3.4 30-4:2. 31-2:15. 31-3:6, 32-2:14
LOADING
(psf)
SPACING 4-0-0
CSI
TC 0.97
DEFL
Vert(LL)
TCLL
TCDL
20.0
15.0
Code
FBC/AISI
BC 0.90
Vert(TL)
BCLL
0.0
WB 0.99
Horz(TL)
BCDL
10.0
(Matrix)
d& Lang
STEEL SECTION
TOP CHORD 55 USD q97 50 'Except'
L T2 55 USD 046 50, T3 55 USD 057 50
BOT i HORD 55 USDI057 50 `Except'
B4 55 U. D 073 50, B5 362 USWD 046 50
WEBS 362 US,I D 035 50 *Except
W1 362. SWD 046 50, W2 362 USWD 057 50, W6 362 U D 046 50
W8 362'VSWD 073 50, W10 362 USWD 046 50
W15 36 USWD 073 50, W16 362 USWD 057 50
W17 36 USWD 057 50, W18 362 USWD 046 50
W19 362 USWD 046 50, W20 362 USWD 073 50
W21 362 USWD 046 50, W22 362 USWD 046 50
W26 3E USWD 046 50
REA TIONS at/size/n,aterial)32/0-8-0/CON, 18/0-8-0/CON
Max DoJvn 32=6195(load case 1), 18=6195(load case 1)
Max Upljft 32=-6074(load case 2), 18=-6074(load case 2)
(in)
1.59
LL defl
25-8:3, 25-9:3, 25-10:6, 26-8:2, 28-5:5, 28-6:4,
Tnres weiaht = 704 Ibs
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b
Sheathed 1-5, 5-11, 11-17
4-0-0 on center bracing 1-24, 24-23, 23-22, 21-13, 21-17
2 Rows at 1 /3 pts
362CSJ 20ga 33
10-24
16-19 Attach to back of member full length
w/11412-14 sds at each end and 12" oc along
length
362CSJ 18ga 33
14-22 Attach to back of member full length
w/7412-14 sds at each end and 12" oc along length
362CSJ 18ga 33
14-20 Attach to back of member full length
w/8412-14 sds at each end and 12" oc along length
362CSJ 16ga 50
2-31 Attach to back of member full length
w/6412-14 sds at each end and 12" oc along length
362CSJ 16ga 50
10-23 Attach to back of member full length
w/6412-14 sds at each end and 12" oc along length
362CSJ 14ga 50
20-22 Attach to back of member full length
w/7-#12-14 sds at each end and 12" oc along length
FORCES (lb) Max. C4Irnpression Force
TOP! CHORD 1-2=-2053, 2-33=-10267, 3-33=-9989, 3-34=-10845, 4-34=-10581, 4-5=-10046, 5-6=-10262, 6-7=-10262, 7-35=-10262,
8-35=- 0262, 8-9=-10589, 9-36=-10589, 10-36=-10589, 10-11=-14521, 11-12=-15562, 12-13=-19063, 13-37=-18986,
14-37--19203, 14-38=-10819, 15-38=-10861, 15-16=-9419, 16-17=-2234
BOT CHORD 1-32=63, 31-32=-1024, 30-31=-7215, 29-30=-7793, 28-29=-6862, 27-28=-8051, 26-27=-8051, 25-26=-8051,
24-25 17565, 23-24=-10157, 22-23=-12186, 21-22=0, 13-22=-148, 20-21=-70, 19-20=-6585, 18-19=-1224,
17-18�,1152
WEBA 2-32=' 614, 2-31=-6272, 3-31=-1198, 3-30=-657, 4-30=-138, 4-29=-1183, 5-29=-726, 5-28=-1654, 6-28=-767,
8-28=- 1189,8-26=0,8-25=-543,9-25=-677,10-25=-751,10-24=-8650,10-23=-6070,11-23=-4275,12-23=-3139,
12-22 3247, 20-22=-9123, 14-22=-6271, 14-20=-6794, 15-20=-1425, 15-19=-1630, 16-19=-5482, 16-18=-5452
1j This truss has bee � designed for unbalanced loading conditions.
2) This truss designe - with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h =
33.8 ft., Exposurei'Category C, Enclosed Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance =
7i.90 ft. using a to chord tributary area of 1583.30 sq. ft., 0.6 DL applied. Design Velocity Pressure, qh = 42.94 psf.
2) F�orizontal load ap lied to this truss resulting from the standard wind load, equal to 1 Ibs, has been considered to be resisted by the
diaphragm and/or ther elements, the design of which shall be the responsibility of the Engineer of Record. Wind loads applied to
the supporting wa� should be considered when designing truss to wall connections.
4) WARNING: The �nusually long span and/or configuration of this truss requires that extreme care be used in its application. Use
proper transportation, unloading and erection methods. Assure that all required web lateral bracing is communicated to the building
contractor. Ensure that over-all building bracing is designed by a qualified engineer, architect, or building designer.
Continued on page 2 111
071001
Truss Type
TQtyTP—ly
FROOF
TRUSS
Tue Apr 29 13:35:14
The Monarch Comp,
NOTESI
5) Provide adequate
6) Top chord load aF
LOAD CASE(S) Sta
W
e to prevent water ponding.
0-0-0 oc via valley trusses above.
4�.
7.16-32 s
071001
ROOF TRUSS 11 11 JA3
s Sep 25
28 10:05:38 2008 Page 1
I
CITY (Total = #78 ). All Screws Are #12-14 T/3
3 1-21:2, 5-4: 2, 5-6:11, 10-22:2, 11-22:9. 21-1:2, 22-11:9
2-19:11, 2-2 :8, 3-17:2, 3-19:5, 4-16:5, 4-17:2. 5-15:3, 5-16:4. 6-15:5, 7-13:4. 7-14:2, 7-15:4, 8-13:3, 9-12:7. 9-13:12, 9-22:6, 22-9:8, 22-12:8
2-4-0 5-4-11 5-4-11 1 5-4-11 5-6-8 5-6-8 5-6-8 5-6-8 5-10-2
2-4-0 7-8-11 13-1-5 18-6-0 24-0-8 29-6-15 35-1-7 40-7-14 46-6-0
4.50 12 325USJD097x10
05 6 25 7 T2 8 26 9 10
_43 5 424 3 7 6
4 9 7000SJ073x12
2 (26 \W7 8 9 0 W 2 13 4 W 6 IA14 o .6 22
2 9 5 �01� 2C2\54 354 622 431� 7 8 8
W TSK
21 20 19 18 17 16 15 14 13 12 11
��iD 362USWD046x18"
o-a-o
2-0-0 5-4-11 5-4-11 5-4-11 5-6-8 5-6-8 5-6-8 5-6-8 5-10-2
2-0-0 7-8-11 13-1-5 18-6-0 24-0-8 29-6-15 35-1-7 40-7-14 46-6 0
2-4-0
SCREW QTY
CHORDS 18-17:14, -19:14
WEBS 12-9:7, 12 22:8, 13-7:4, 13-8:3, 13-9:12, 14-7:2, 15-5:3, 15-6:5, 15-7:4, 16 4:5, 16-5:4, 17-3:2, 17-4:2, 19-2:11, 19-3:5, 20-2:9 Truss weight = 313 Ibs
LOADING (psf) SPACING 4-0-0 CS] DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLLI 20.0 Code TC 0.97 Vert(LL) 0.52 15-16 >999 035 2561b 046 4501b
TCDLI 15.0 FBC/AISI BC 0.87 Vert(TL) -0.43 15-16 >999 057 5401b 073 6561b
BCLL 0.0 WB 0.97 Horz(TL) -0.19 11 n/a 097 6621b #
BCDL 10.0 (Matrix) Min Length / LL deft = 240
STEELBRACING
SECTION
TOP CHORD 35 US,.057 50 `Except` TOP CHORD Shea ed 0 o nter purlin spacing 1-5, 5-10
W1 36' USWD 035 50, W19 362 USWD 046 50 BOT CHORD 4- - racin 1-11
BOT CHORD 35 USG, 057 50 *Except* WEBS 3 CSJ 2 - 3 9- 3 Attach to back of member full length
B2 35 SD 046 50 w/5-#12-14 sds at each end and 12" oc along length
WEBS 362 US.ND 035 50 `Except` JOINT ) 2
W2 3611 USWD 057 50, W3 362 USWD 057 50, W13 362 USWD 073
W17 3 2 USWD 073 50, W18 362 USWD 057 50
REACTIONS at/size/ laterial)11/0-3-8/LGF, 20/0-8-0/CON
Max Do n 11=3952(load case 1), 20=4364(load c 1)
Max Up ift 11=-3370(load case 2), 20= 4499(load
FO CES (lb) Max. C tnpression Force -26= 4559,
TOI CHORD 1-21=�73, 1-2=-57, 2-3=-6202, 3-23=-6647, 23-24=-6631, 4-24=-6506, 4-5=-6047, 5-6=-5994, 6-25=-5994, 7-25=-5994, 7-8=-4559, 8-26=-4559, 9
9-10=- 3, 11-22=-3866, 10-22=-312
BOT CHORD 20-21�Q, 19-20=-1577, 18-19=-5654, 17-18=-5654, 16-17=-5951, 15-16=-5136, 14-15=-4883, 13-14=-4883, 12-13=-2346, 11-12=-6
WEBS 2-20=-4129, 2-19=-4185, 3-19=-1138, 3-17=-348, 4-17=-40, 4-16=-882, 5-16=-671, 5-15=-395, 6-15=-853, 7-15=-814, 7-14=0, 7-13=-1826, 8-13=-719, 9-13=-2488,
1 9-12=;1500, 9-22=-3294, 12-22=-2781
NOTES
1) This truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclose
Building, I = 1.00 k z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 716.08 sq. ft., 0.6 DL applied. The Left End
Vertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) F�orizontal load ap�lied to this truss resulting from the standard wind load, equal to 1600 Ibs, has been considered to be resisted by
the diaphragm and/or other elements, the design of which shall be the responsibility of the Engineer of Record. Wind loads applied
to the supporting %Ball should be considered when designing truss to wall connections.
3) Prbvide adequate) rainage to prevent water ponding.
4) Top chord load a I lied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stai dard
9
Truss Type Qty Ply Trn
ROOF TRUSS 1 1 A4
16-32 s
Page
WEBS
i
i
d
QTY (Total = 306 ). All Screws Are #12-14 T/3
i 1-21:2, 4-3:1,0, 4-5:14, 10-22:2, 11-22:9, 21-1:2, 22-11:9
2-19:14, 2-2 i:8, 3-17:2, 3-19:5, 4-16:8, 4-17:2, 5-16:5, 6-14:4, 6-15:2, 6-16:2, 7-14:4, 8-12:13, 8-13:2, 8-14:5, 9-12:4, 9-22:7, 22-9:9, 22-12:9
2-4-0 6-1-0 6-1-0 5-3-6 5-3-6 5-3-6 5-3-6 1 5-3-6 1 5-7-0
j 2-4-0 6-5-0 14-6-0 19-9-6 25-0-13 30-4-3 35-7-9 40-11-0 46-6-0
4.50 12
325USJD097x10
O� 5 23 6
L28 5 /(224
T 3 6 7 8 W9" 0
52 5
4
2 9 5 01 2 2 852 2
? ':.1:
21 20 19 18 17 16 15
-.4362USWD046x18"
1 M 2
14
8 24 9
2 4 i
4 15 6
2 4
13 12
10
9 7000SJ073x12
22
0-4-0
2-0-0 6-1-0 6-1-0 5-3-6 5-3-6 5-3-6 5-3-6 5-3-6
2-0-0 8-5-0 14-6-0 19-9-6 25-0-13 30-4-3 35-7-9 40-11-0 46-6-0
2-4-0
SCREW QTY
CHORDS 18-17:14, 19:14 Truss weight = 300 Ibs
WEBS 12-8:13, 1 9:4, 12-22:9, 13-8:2, 14-6:4, 14-7:4, 14-8:5, 15-6:2, 16-4:8, 16-5:5, 16-6:2, 17-3:2, 17-4:2, 19-2:14, 19-3:5, 20-2:9
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLLI 20.0 Code TC 0.86 Vert(LL) 0.66 15-16 >796 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.95 Vert(TL) -0.57 15-16 >919 057 5401b 073 6561b
BCLL1 0.0 WB 0.93 Horz(TL) -0.22 11 n/a 097 6621b #
BCDL 10.0 (Matrix) Min Length / LL defl = 240 _
i
STEEL SECTION BRACING
TOP CHORD 35 USE 073 50 *Except' TOP CHORD Sheathed nter purlin spacing 1-4, 4-10
W1 361 USWD 035 50, T2 35 USD 057 50, W19 362 USWD 046 50 BOT CHORD 4-0- c e acin 1-11
BOT iCHORD 35 USD 057 50 *Except WEBS 3 8- Attach to back of member full length
B2 35 105 50 E w/7-#12-14 sds at each end and 12" oc along length
4 3 CSJ 1 a 2-19 Attach to back of member full length
WEBS 362 USWD 035 50 *Except' w/5 #12-14 sds at each end and 12" oc along length
W2 3621 USWD 057 50, W3 362 USWD 046 50, W13 362 USWD 046 50 -JOINT
W17 3 F2 USWD 073 50. W18 362 USWD 057 50
REA TIONS QUsize/r} aterial)l1/0-3-8/LGF, 20/0-8-0/CON
Max Do'YYy' n 11=3952(load case 1), 20=4364(load case 1)
Max UpIII 11=-3260(load case 2), 20=-4579(load )
FOR -ES (lb) Max. C �npression Force
TOP CHORD 1-21=1191, 1-2=-63, 2-3=-6445, 3-4=-6548, 4-5=-7202, 5- 720 , 6-23=-7202, 6-7=-6979, 7-8=-6979, 8-24=-3337, 9-24=-3337, 9-10=-9, 11-22=-3866, 10-22=-296
BOTICHORD 20-21, 19-20=-1287, 18-19=-5722, 17-18=-5722, 16-17-f- ' 18, 15-16=-6273, 14-'15=-6273, 13-14=-4486, 12-13=-4486, 11-12=-2
WEBS 2-20= 4 125, 2-19=-4528, 3-19=-1003, 3-17=-338, 4-17=-103, 4-16=-1257, 5-16=-821, 6-16=-458, 6-15=0, 6-14=-789, 7-14=-758, 8-14=-1787, 8-13=0, 8-12=-3296,
1 9-12=-340, 9-22=-3785, 12-22=-3089
NOTES
1) TOs truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , ,Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 716.08 sq. ft., 0.6 DL applied. The Left End
Vertical and Right �nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load applied to this truss resulting from the standard wind load, equal to 1310 Ibs, has been considered to be resisted by
tqe diaphragm anc1J,or other elements, the design of which shall be the responsibility of the Engineer of Record. Wind loads applied
to the supporting vtall should be considered when designing truss to wall connections.
3) Provide adequate Irainage to prevent water ponding.
4) Top chord load ap lied at 0-0-0 oc via valley trusses above.
LOAD CASES) Sta; dard
I Ill
■
071001
MONO HIP 11 12 1A5G
s Sep
SCREW QTY (Total =
CHORDS 1-2:2, 4-3:2
WEBS 2-25:15, 2
12-16:12
SCREW QTY
CHORDS 1-26:6, 2,
WEBS 14-12:12,
26-2:13
). All Screws Are #12-14 T/3
-5:22, 13-14:2, 14-13:8
1, 3-23:5. 3-25:10, 4-22:13, 4-23:4. 5-22:2. 6-20:3, 6-21:5. 6-22:5, 7-20:2. 8-18:7. 8-19:4, 8-20:2, 9-18:2, 10-16:8, 10-17:5, 10-18:5, 11-16:2, 12-14:12. 12-15: ,
2-2-0 4-2-0 1 4-2-0 4-0-0 4-0-0 1 4-0-0 1 4-0-0 1 4-0-0 1 4-0-0 1 4-0-0 4-0-0 1 4-0-0
2-2-0 6-4-0 10-6-0 14-6-0 18-6-0 22-6-0 26-6-0 30-6-0 34-6-0 38-6-0 42-6-0 46-6-0
4.50 12
325USJD097x10
043_ 5
0
D07%%6 25 2423 22 21 20 19 18 17
60USWD057x14"
e IrvlI!p rn 1PLA-ce IwE-3 ?-a Q01211M
S" LA4javT
11 12 13
2 1 51 2 3
1 11
21 5 W 1 8
16 15 14
14AtJWLI ArAC*CR-
QECPV, IQE n
a -ea L*1our
0-2-0
4-2-0 4-2-0 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 4-010
2-00-
2-0-0 6-4-0 10-6-0 14-6-0 18-6-0 22-6-0 26-6-0 30-6-0 34-6-0 38-6-0 42-6-0 46-6-0
2-2-0
24-25:15
16-10:7, 16-11:2, 16-12:12, 17-10:5, 18-8:7, 18-9:2, 18-10:5, 19-8:4, 20-6:3, 20-7:2, 20-8:2, 21-6:5, 22-4:13, 22-5:2, 22-6:5, Truss we aht �969 Ibs 25-3:
LOADING (psf)
TCLL� 20.0
TCDU 20.0
BCLL 5.0
BCL 10.0
SPACING 4-0-0
Code
FBC/AISI
CSI
TC 0.94
BC 0.94
WB 0.85
(Matrix)
DEFL (in) (loc) I/deft
Vert(LL) 1.10 19-20 >482
Vert(TL) 0.90 19-20 >587
Horz(TL) -0.17 14 n/a
Min Length / LL deft = 240
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b #
STEEL
ti
SECTION
BRACING
TOP CHORD S athed - -0 on center purlin spacing 1-4, 4-13
TOP
CHORD 35 USD
T2 35 USD
046 50 *Except*
057 50, W23 60 USWD 073 50 BOT CH R = 0 on er racing 1-14
(2 C J Oga 33 Attach to both web flanges of both plies, full
BOT
HORD 55 USDII057
WEBS
50 *Except* length,
length, w/15 #12-14 at 12" oc
WEBS
B2 55
362 US
USD 097 50
ND 035 50 *Except 600 CSJ 20ga 33 4-22 Attach to both web flanges of both plies, full
at 12" oc
W1 3621!USWD
W8 36?i1USWD
046 50, W2 362 USWD 046 50, W4 362 USWD 046 length, w/13412-14
046 50, W16 362 USWD 073 50 (2)600 CSJ 20ga 33 12-16 Attach to both web flanges of both plies, full
12" oc
W18 362
USWD 073 50, W20 362 USWD 046 50 length, Attacw/12h at
t both
(2)600 CSJ 20ga 33 12-14 Attach to both web flanges of both plies, full
W22 362
USWD 057 50 length, w/9412-14 at 12" oc
REACTIONS
at/size/
LriaI)1410-4-0/UKN, 26/0-4-0/UKN
Max DoN
in 14=7131(load case 1), 26=7327(load case 1)
Max Uplf
tt 14=-10379(load case 2), 26=-11260(load case 2)
FORCES
TOP
(lb) Max. Compression
CHORD 1-2=-V
Force
93, 2-3=-10593, 3-4=-13103, 4-5=-15449, 5-6=-15449, 6-7=-18695, 7-8=-18695, 8-9=-17175, 9-10=-17175, 10-1 1=-1 0751, 11-12=-10751, 12-13=-3,
BOT
13-14-
CHORD 1-26=-
127
073, 25-26=-2060, 24-25=-15004, 23-24=-15004, 22-23=-18851, 21-22=-26436, 20-21=-26436, 19-20=-27091, 18-19=-27091, 17-18=-21162, 16-17=-21162,
15-1628
2-26=-§65,
529, 14-15=-8529
2-25=-13392, 3-25=-2922, 3-23=-4569,4-23=-1804, 4-22=-6584, 5-22=-353, 6-22=-3431, 6-21=-2251, 6-20=-1514, 7-20=402, 8-20=-560, 8-19=-2096,
WEBS
1
8-18=-
083, 9-18=-358, 10-18=-5486, 10-17=-2133, 10-16=-5674, 11-16=-313, 12-16=-10274, 12-15=-2266, 12-14=-8870
NOTES
1) 2 ply truss to be co ' nected together with #10-16 screws as follows: Top chords connected with 1 row at 12 inches on center.
Bottom chords con acted with 1 row at 12 inches on center.
2) This truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h =
33.8 ft., Exposures , ategory C, Enclosed Building, I = 1.00 , Kz =1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance =
7.919 ft. using a toplchord tributary area of 713.02 sq. ft., 0.6 DL applied. The Right End Vertical is not exposed to Wind. Design
Velocity Pressure, qh = 42.94 psf.
3) Horizontal load ap{ ied to this truss resulting from the standard wind load, equal to 826 Ibs, has been considered to be resisted by
tlje diaphragm andYJor other elements, the design of which shall be the responsibility of the Engineer of Record. Wind loads applied
t the supporting all should be considered when designing truss to wall connections.
4) F�r truss to truss bnnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required
for other type load s).
5) Provide adequate rainage to prevent water ponding.
6) Load case(s) 1, 2, S, 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of
tl is truss.
7) gttach 5.5USGP 12" at location of tie-in trusses -See detail US2US-4B.1
8) g,pecial connecto i s required at joints 23,
9) Top chord load ap lied at 0-0-0 oc via valley trusses above.
LOAD CASES)
Continued on page 2
-Fuss Type Ply Truss
MONO HIP jQty
1 2 A5G
_OAD CASE(S)
1) Live: j
Uniform Loads 2=-
Vert: s (plo 40 , 2-3=-140.0, 3 4= 140.0, 4-5= 70.0, 5-6= 70.0, 6-7=-70.0, 7-8=-70.0, 8-9= 70.0, 9-10=-70.0, 10-11=-70.0, 11-12=-70.0, 12-13=-70.0, 1-26=- ,
25-26=-40.0, 25=-40.0, 23-24=-40.0, 22-23=-248.7, 21-22=-248.7, 20-21=-248.7, 19-20=-248.7, 18-19= 248.7, 17-18=-248.7, 16-17=-248.7, 15-16=-248.7,
14-15=-248.7
Concentrated Loads (I )
Vert: 23=-118
2) Wind 1 C&C:
uniform Loads (plf) III
Vert: 1-2=-36. 2-3=-36.0, 3-4=-36.0, 4-5=-26.0, 5-6=-26.0, 6-7=-26.0, 7-8=-26.0, 8-9=-26.0, 9-10=-26.0, 10-11=-26.0, 11-12=-26.0, 12-13=-26.0, 1-26=-2 .,
25-26=-24.0,4-25=-24.0, 23-24=-24.0, 22-23=-77.5, 21-22=-77.5, 20-21=-77.5, 19-20=-77.5, 18-19=-77.5, 17-18=-77.5, 16-17=-77.5, 15-16=-77.5,
14-16=-77.5
Normal:
1-2 , 137.1,2-92.6, .1, 3-4 237.119 20=13.3, 5 6=-19.3, 6-7 17.6, 7-8=-6?16817=592.6, 9-10= 596, 104 15=592.61-12=-13.3, 12-13=-13.3, 1-26=34 ,
21
Concentrated Loads (, )
Vert:23=273.
3) Wind 2 C&C:
Uniform Loads (plf) j
Vert:1-2=-36 0, 2-3=-36.0, 3-4=-36.0, 4-5=-6.0, 5-6=-6.0, 6-7=-6.0, 7-8=-6.0, 8-9=-6.0, 9-10=-6.0, 10-11=-6.0, 11-12= 6.0, 12-13=-6.0, 1-26=-24.0, -15=-1 1.1
24-25=-24.0, 3-24=-24.0, 22-23=-131.1, 21-22=-131.1, 20-21=-131.1, 19-20=-131.1,18-19=-131.1, 17-18=-131.1, 16-17=-131.1,15-16=-131.1,14-11-26=3.1
Normal:
28 22=44.8,82 . , 44 8?19 4-5=- 8,918-69=44.8, 67-18 44.8, 66-67=44.8, 15 16=44i8, 14215=44.81=-82.9, 11-12= 82.9, 12-13=-82.9, 1-26=322.9,
Concentrated Loads k b)
Vert: 23=42
4) De�Id: _
Uniform Loads (plf)
2Vert 5 261 40 0�24 25= 40.0, 2 246 40.0, 22-23=0147.1, 21 22= 147..11,, 20-21 147.1,19-200147.01 8 19,-0147.1 30.0181.147.1,016-17= 147 10 051�66-147.11,
14-15=-147.
Concentrated Loads (lb)
Vert:
ROOF TRUSS 13 11 1 A-ELE
0017
i
1
a Monarch Compan
CREW CITY (Total:
H6FDS 1-2:2, 5-4',
IEBS 2-26:12, 2
12-16:4, 1
n
CITY
S 1-27:25,
15-12:6,
LOADING (psf)
TCLL 20.0
TCDJL 15.0
BCL� 0.0
BCDL 10.0
STEEL SECTION
TO I CHORD 35 U£
T1 35
BOT CHORD 55 Ur
WEBS 362 U
W1 31
W9 31
W11
W14:
Max
:ES (lb) Max.
CHORD 1-2=
7-31
CHORD 1-27
18-1
7-21:
11-11
NOTES
1) This truss has be
2) This truss design
33.F3 ft., Exposur
7.90 ft. using a t
3) WARNING: The
proper transportE
contractor. Ensu
Provide adequate
5) Top chord load a
LOIAD CASE(S) St
7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 1
). All Screws Are #12-14 T13
:9, 9-8:2, 9-10:4, 14-13:2
3-24:2, 3-26:4, 4-23:3, 4-24:2, 5-23:4, 6-22:4, 6-23:3, 7-21:7, 7-22:4, 8-20:9, 8-21:11, 9-19:10, 9-20:8, 10-17:4, 10-18:5, 10-19:5, 11-16:3, 11-17:5, 12-15:6,
6-8 11
6 8 11 6 8 11 ,6 8
I 6-8-0 1
4-0-0
6-6-3 FI 6-8-2
0-1-13
1-14, 4-7-3 4-9-0 2-4-0
9-0-11
15-9-5 22-6-0 29-2-0
35-10-0
42-4-342-6-0 53-2-2
57-2-0 61-11-0 66-8-069-0-0
46-6-0
57-3-13
4.50 12
325USJDg073x10
325USJDg073x10
�5
6 30 'T27
31 8 OR
8 q 9 3 4 47
9
2 3 7W
9WO
11 3 W1654�2
31
T
5 •\ 6
/ 8 3 34l2
4 4
9 4 5 4 554 5 W 4 a
, 51314 o
1 2 9 2 2 2 7
a 3 B2
7 9 4 CSK _ 3 4'
IN
8 2 Too O
81
9 O
20
1D02"M 2Q5 24 23
22 525MDO73y925USJDO7?612 700VOJD073x6
60USWDO35x2O"
525USJD073x112 00 5USJD073x10
C 3 K
G
7
2-0-0
0 a-0
1-6-0 2-4-0
0- 6-8-11 6-8-11 6-8-11 10-0-0
10-0-0 -4- 0- -0 6-6-0 1 10 0 9-6-0
0 -0
2-0-0 9-0-11 15-9-5 22-6-0 32-6-0
42-6-0 44-104B-6-053-0-0 54-10-0 66-8-0
67-0-0
46-4-0 57-2-0
69-0-0
2-4-0
5:18, 16-15:3, 16-17:2, 17-16:2, 17-18:5, 20-19:9, 20-21:4, 21-20:4, 21-22:11, 25-24:25, 25-26:26
9:24, 19-10:5, 20-8:15, 20-9:16, 21-7:14, 21-8:11, 22-6i 22-7:9, 23-4:7,
3:9, 16-11:3, 16-12:4, 17-10:4, 17-11:5, 18-10:5, 19-■
23-5:4, 23-6:3, 24-3:2, 24-4:2,
Tniss weiaht = 464 Ibs
SPACING 4-0-0 CSI 7DEFL (in) floc) fl SCREW VALUE. (#12-14T/3)
Code TC 0.95 L) 0.43 2 035 2561b 046 4501b
FBC/AISI BC 0.92 L) -0.38 -23%/a
9 057 5401b 073 6561b
WB 0.93 TL) 0 19 097 6621b #
(Matrix) Min Len / LL de -
057 50 'Except'
SD 073 50
03550
ND 035 50 *Except*
USWD 046 50, W2 362 USWD 046 50, W6 36 D
USWD 057 50, W10 362 USWD 057 50
2 USWD 057 50, W13 362 USWD 046 50
2 USWD 073 50, W15 362 USWD 073 50
CH9549heathed or 2-0-0 on center purlin spacing 1-5, 5-9, 9-14
CHORD 4-0-0 on center bracing 1-21, 21-20, 20-17, 17-16, 16-14
S 1 Row at midpt
362CSJ 20ga 33
2-26
8-21 Attach to back of member full length
w/5-#12-14 sds at each end and 12" oc along length
362CSJ 18ga 33
8-20 Attach to back of member full length
w/5-#12-14 sds at each end and 12" oc along length
362CSJ 16ga 50
7-21 Attach to back of member full length
w/4-#12-14 sds at each end and 12" oc along length
362CSJ 14ga 50
9-19 Attach to back of member full length
w/4412-14 sds at each end and 12" oc along length
27/0-8-0/CON, 19/0-8-0/LGF, 18/0-8-0/LGF, 15/0-8-0/CON
27=4140(load case 5), 19=5989(load case 1), 18=1150(load case 6), 15=1385(load case 6)
27=-4409(load case 2), 19=-4818(load case 2), 18=-801(load case 2), 15=-2146(load case 2)
npression Force
57, 2-28=-6187, 3-28=-5889, 3-29=-6020, 4-29=-5722, 4-5=-4891, 5-6=-4399, 6-30=-3470, 7-30=-3470,
12, 8-31=-912, 8-9=0, 9-10=-859, 10-32=-145, 11-32=-192, 11-33=-551, 12-33=-583, 12-13=-1036, 13-14=-951
26-27=-37, 25-26=-4184, 24-25=-4184, 23-24=-4108, 22-23=-2709, 21-22=-1624, 20-21=0, 19-20=-1787,
938, 17-18=-939, 16-17=-174, 15-16=-409, 14-15=0
712, 2-26=-4209, 3-26=-730, 3-24=-427, 4-24=0, 4-23=-1498, 5-23=-580, 6-23=-378, 6-22=-1621, 7-22=-1393,
596, 8-21=-2258, 8-20=-3710, 9-20=-3312, 9-19=-5041, 10-19=-994, 10-18=-1011, 10-17=-577, 11-17=-954,
599, 12-16=-763, 12-15=-700, 13-15=-599
i designed for unbalanced loading conditions.
I with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h =
Category C, Enclosed Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance =
i chord tributary area of 1584.65 sq. ft., 0.6 DL applied. Design Velocity Pressure, qh = 42.94 psf.
nusually long span and/or configuration of this truss requires that extreme care be used in its application. Use
)n, unloading and erection methods. Assure that all required web lateral bracing is communicated to the building
that over-all building bracing is designed by a qualified engineer, architect, or building designer.
irainage to prevent water ponding.
died at 0-0-0 oc via valley trusses above.
07100
7.16-32 s
Truss Type �Qty I Ply Truss
ROOF TRUSS 1 2 AFG
E
SCREW CITY (Total = 70 ). All Screws Are #12-14 T/3
CHORDS 1-10:6, 5-6 5, 6-5:5, 10-1:6
WEBS 1-9:6, 2-9. , 3-7:2, 3-8:2, 3-9:2, 4-7:2, 5-7:7
4-7-4
3-9-0 3-9-0 4-7-4
4-7-4
g-4-4 12-1-4 16-8-8
r
1I 11 12 2 1 14 4 155
o
g 'r , 1. 2 2 2 7 5
6 6 ��
g Wgj
W_ \ i 0 2 x.
N /, / ;
.� 5
6 3 2� 2 \ 2 2 7
6 o o
o . j' o
9 8 7 6
C2K
KO(:!-%:KD
4-7-4 3-9-0 3-9-0 4-7-4
4-7-4 8-4-4 12-1-4 16-8-8
SCREW QTY III Truss weight = 14
WEBS
7-3:2, 7-4'
, 7-5:7, 8-32, 9-1:6, 9-2:3, 9-3:2
SPACING 4-0-0
CSI
TIC 0.46
(in) (loc) I/dkr
0.08 8 >9561b
W VALUE. (#12-14 T13)
046 4501b
LOADING (psf)
TCLL 20.0
TCDL 15.0
5.0
Code
FBC/AISI
BC 0.32
0.08 8 >940Ib
073 656Ib
621b
BCLL
WB 0.40
0.02 6
M
#
BCDL 10.0
(Matrix)
LL deft = 240
STEEL SECTION
TOP CHORD 35 US 035 50 `Except'
D eathe
in spacing 1-5
W1 36� USWD 035 50, W9 362 USWD 035 50
0-0 on
BOT CHORD 35 USD 035 50
WEBS 362 USWD 035 50
REPICTIONS Qt/size/II aterial)10/0-8-0/CON, 6/0-4-0/LGF
Max DC,>j�rn 10=2814(load case 1), 6=2564(load case 1
Max Uplift 1 0=-1 521 (load case 2), 6=-1480(load )
FORCES (Ib) Max.' impression Force
TOP CHORD 1-10=-2728; 1-11=-2651, 11-12=-2651, 2-12=-2651, 2-1 2651, 3-13=-2651,
3-14=-2867, 4-14=-2867, 4-15=-2867, 5-15=-2867, 5-6=-2476
BOT CHORD 9-10=-, , 8-9=-2636, 7-8=-2636, 6-7=-1
WEBS 1-9=-2756, 2-9=-782, 3-9=-993, 3-8=0, 3-7=-732, 4-7=-1056, 5-7=-2342
1) 2L ply truss to be c
o center.
2) rhis truss designs
Building, I = 1.00 ,
Vertical and Right
3) For truss to truss
is delegated to the
4) Provide adequate
5) Load case(s) 1, 2,
6) Attach 35USGP
7) Top chord load ar
LOAD CASE(S)
1) Live:
Uniform Loads (pi
Vert: 1-11'
5-15=-14C
Concentrated Loa
Vert: 1=-1
2) Wind 1 C&C:
(Uniform Loads (pl
+ Vert:1-11
9-10=-24.
Normal: 1
5-15=225
Concentrated Loa
Vert: 2=61
nected together with #10-16 screws as follows: Top chords connected with 1 row at 12 inches on center. Bottom chords connected with 1 row at 12 inches
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 1584.65 sq. ft., 0.6 DL applied. The Left End
nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
nnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
iuilding designer.
•ainage to prevent water ponding.
4 has been modified. Building designer must review loads to verify that they are correct for the intended use of this truss.
2" at location of tie-in trusses - See detail US2US-3B.1
ied at 0-0-0 oc via valley trusses above.
40.0, 11-12=-140.0, 2-12=-140.0, 2-13=-140.0, 3-13=-140.0, 3-14=-140.0, 4-14=-140.0, 4-15=-140.0,
9-10=-40.0, 8-9=-40.0, 7-8=40.0, 6-7=-40.0
:lb)
2=-333 3=-333 4=-333 11=-9112=553 15=-636
36.0, 11-12=-36.0, 2-12=-36.0, 2-13=-36.0, 3-13=-36.0, 3-14=-36.0, 4-14=-36.0, 4-15=-36.0, 5-15=-36.0,
8-9=-24.0, 7-8=-24.0, 6-7=-24.0
1=225.5, 11-12=225.5, 2-12=225.5. 2-13=225.5, 3-13=169.2, 3-14=169.2, 4-14=225.5. 4-15=225.5,
> (lb)
11 =1 05 12=-385
3) Wind 2 C&C:
I
ontinued on page 2
07
Truss Type Qty Ply Truss
ROOF TRUSS 1 2 AFG
7.16-32 s Sep 25 200 —Aegis Metal Framing, LLC
Mon
2
LOAD CASE(S)
Uniform Loads (plf)
Vert: 1-11=-3 .0, 11-12=-36.0, 2-12=-36.0, 2-13=-36.0, 3-13=-36.0, 3-14=-36.0, 4-14=-36.0, 4-15=-36.0, 5-15=-36.0, 9-10=-24.0, 8-9=-24.0, 7-8=-24.0,
6-7=-24.0
Normal: 1-11.66.1, 11-12=-66.1, 2-12=-66.1, 2-13=-66.1, 3-13=-66.1, 3-14=-66.1, 4-14=-66.1, 4-15=-66.1, 5-15=-66.1
Foncentrated Loads
Vert: 2=6001—10512=-385
4),Dead:
Uniform Loads (plf)
Vert: 1-11=-6 .0, 11-12=-60.0, 2-12=-60.0, 2-13=-60.0, 3-13=-60.0, 3-14=-60.0, 4-14=-60.0, 4-15=-60.0, 5-15=-60.0, 9-10= 40.0, 8-9= 40.0, 7-8= 40.0, 6-7= 40.0
6oncentrated Loads b)
1 Vert:2=-148 1=-1212=251
071
ROOF TRUSS I 1 12
S
CREW CITY (Total = 146 ). All Screws Are #12-14 T/3
:HORDS 1-30:6, 13- ,4:3, 14-13:3, 30-1:6
IIEBS 1-29:13, 2- 9:3, 3-27:9, 3-28:2, 3-29:14, 4-26:8, 4-27:9, 5-24:2, 5-25:2, 5-26:9, 6-23:2, 6-24:2, 7-21:9, 7-22:2, 7-23:8, 8-20:8, 8-21:5, 9-18:9, 9-19:2, 9-20:8, 10-17:6, 10-18:8,
11-15:7, 1111 6:2. 11-17:6, 12-15:2, 13-15:7
1 2- 3-3-8 , 4-0-0 4-0-0 4-4-6 3-1-0 3-1-0 4-4-6 4-0-0 4-0-0
1-2 12 4-6-4 T 8-6-4 12-6-4 16-10-10 19-11-10 23-0-10 27-5-0 31-5-0 35-5-0 38-8-8 39-11-4
r
I
112
3 34 5 6
7
8 9 192 11 1213
O
i
o
6
3
9 9 8 9 2 8
9
5 8 8 9 8 6 6 7
9
N
g
3
8 9 8 9:P7477
329
28 27 26 25 24 23
22
21 20 19 18 17 16 1514
E MBEh I 1i6
l N7D ML+.VA"2
'
MJELD P-E�pN1It�31D
s rFT SEE uy &L
� lsyy�T,
-2
3-3-8 4-0-0 2-0-0 2-0-0 2-2-3 2-2-3 3-1-0
3-1-0
2-2-3 2-2-3 2-0-0 2-0-0 4-0-0
1-2I
12
4-6-4 8-6-4 10-6-4 12-6-4 14-8-716-10-10 19-11-10
23-0-10
25-2-13 27-5-0 29-5-0 31-5-0 35-5-0 38-8-8 39-11-4
SCREW CITY
, 26-5:9, 27-3:8,
17-11:6, 18-9:9, 18-10:8, 19-9:2, 20-8:8, 20-9:8, 21-7:9, 21-8:5, 22-7:2, 23-6:6, 23-7:8, 24-5:2, 24-Tru
WEBS
15-11:7, 15112:2,
27-4:9, 28-5:2,
15-13:7, 16-11:2, 17-10:6,
29-1:13, 29-2:3, 29-3:11
s wei, t_7-_6
Truss weight = 690 Ibs
LOADING (psf)
SPACING 1-4-0
CSI
DEFL
(in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCLL
20.0
Code
TC 0.91
Vert(LL)
-0.42 22-23 >999
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.83
Vert(TL)
1.02 22-23 >465
057 5401b 073 6561b
BCLL
0.0
WB 0.82
Horz(TL)
-0.17 14 n/a
097 6621b
#
BCDL
10.0
(Matrix)
Min Length / LL defl = 240
STEEL SECTION BRACING
TOP i HORD 55 USD 057 50 *Except* TOP CHORD She -
W1 60 UlJSWD 073 50, W29 60 USWD 073 50 BOT CHORD 1- on c racing 0-14
BOT CHORD 55 USD�73 50
WEBS 362 US D 035 50 *Except'
W4 60 SWD 073 50, W6 60 USWD 073 50, W24 362 USWD 057 50
W26 362 USWD 046 50
REACTIONS QUsize/m terial)30/0-8-0/CON, 14/0-3-10/LGF
Max Dowjil 30=7349(load case 1), 14=3467(load case
Max Uplii 30=-7147(load case 2), 14=-3564(load )
FORCES (lb) Max. Corrlpppression Force
TOP CHORD 1-30=-6882, 1-2=-2454, 2-3=-2454, 3-31=-20615, 4-31=-2061�, 4-5=-22696, 5-6=-25636, 6-7=-25914, 7-8=-20381, 8-9=-18116, 9-10=-13244, 10-32=-10995,
11-32=-(1,0995, 11-12=-1310, 12-13=-1310, 13-14=-3234
BOT HORD 29-30=-�107, 28-29=-14182, 27-28=-14182, 26-27=-22475, 25-26=-27867, 24-25=-27867, 23-24=-28061, 22-23=-25150, 21-22=-25150, 20-21=-21607, 19-20=-16493
18-19=116493, 17-18=-11418, 16-17=-6163, 15-16=-6163, 14-15=-26
WEBS 1-29=-6 01, 2-29=-1267, 3-29=-12606, 3-28=-154, 3-27=-9645, 4-27=-4440, 4-26=-3932, 5-26=-3695, 5-25=0, 5-24=-350, 6-24=-613, 6-23=0, 7-23=-3675,
7-22=-2 1, 7-21=-3924, 8-21=-2519, 8-20=-3348, 9-20=-3834, 9-19=-140, 9-18=-3885, 10-18=-3705, 10-17=-2761, 11-17=-6111, 11-16=-18, 11-15=-5740,
12-15=- 1, 13-15=-3524
1) 2-ply truss to be connected together with #10-16 screws as follows: Top chords connected with 1 row at 12 inches on center.
Bottom chords conn�cted with 1 row at 12 inches on center.
2) This truss designed ,Vvith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h =
33'8 ft., Exposure Category C, Enclosed Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance =
7.9,7 ft. using a top hord tributary area of 1583.30 sq. ft., 0.6 DL applied. The Left End Vertical and Right End Vertical are not
exposed to Wind. esign Velocity Pressure, qh = 42.94 psf.
3) For truss to truss co nection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required
for other type load(s' Design of connection(s) is delegated to the building designer.
4) Pro„ide adequate damage to prevent water ponding.
5) Load case(s) 1, 2, 3 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of
this truss.
6) Attach 5.5USGP x 12" at location of tie-in trusses - See detail US2US-4B.1
7) Spacial connections,
required at joints 23,
fl� Top chord load appl ed at 0-0-0 oc via valley trusses above.
LOAD CASE(S)
1) Live:
10 Uniform Loads Of)
Vert: 1-2=-4 7, 2-3=-46.7, 3-31= 46.7, 4-31=-46.7, 4-5=-46.7, 5-6= 46.7, 6-7=-46.7, 7-8=-46.7, 8-9= 46.7, 9-10=-46.7,
10-32=46.7 11-32=-46.7, 11-12=46.7, 12-13=-46.7, 29-30=-13.3, 28-29=-13.3, 27-28=-13.3, 26-27=-13.3. 25-26=-13.3,
24-25=-l&Z 23-24=-13.3, 22-23=-13.3, 21-22=-13.3, 20-21=-13.3, 19-20=-13.3, 18-19=-13.3, 17-18=-13.3, 16-17=-13.3,
15-16=-13. ' 14-15=-13.3
'ontinued on page 2
Truss Type Qty Ply Truss
ROOFTRUSS 1 I
2 AG
13:39:46 2008 Page 2
LOAD CASE(S)
Concentrated Loads
Vert:2=-165
2) Wind 1 C&C:
Uniform Loads (plf)
Vert: 1-2=-1:
12-13=-12.0,
17-18=-8.0, '
Normal: 1-2=
onicentrated Loads
Vert: 2=-125
3) Wind 2 C&C:
Uniform Loads (plf)
Vert: 1-2=-1:
12-13=-12.0,
17-18=-8.0, '
Normal: 1-2=
12-13=-21.8
Concentrated Loads
Vert: 2=-125
4) Dead:
Uniform Loads (plf)
Vert: 1-2=-2(
12-13=-20.0,
18-19=-13.3,
Concentrated Loads
Vert:2=4361
4=-1953 5=-1887 23=-2557
2-3=-12.0, 3-31=-12.0, 4-31=-12.0, 4-5=-12.0, 5-6=-12.0, 6-7=-12.0, 7-8=-12.0, 8-9=-12.0, 9-10=-12.0, 10-32=-12.0, 11-32=-12.0, 11-12=-12.0,
1-30=-8.0; 28-29=-8.0, 27-28=-8.0, 26-27=-8.0, 25-26=-8.0, 24-25=-8.0, 23-24=-8.0, 22-23=-8.0, 21-22=-8.0, 20-21=-8.0, 19-20=-8.0, 18-19=-8.0,
17=-8.0, 15-16=-8.0, 14-15=-8.0
.3. 2-3=73.3, 3-31=73.3, 4-31=61.8. 4-5=61.8, 5-6=61.8, 6-7=61.8, 7-8=61.8, 8-9=61.8, 9-10=61.8, 10-32=61.8, 11-32=73.3, 11-12=73.3, 12-13=73.3
3=3016 4=1483 5=3016 23=2615
2-3=-12.0, 3-31=-12.0, 4-31=-12.0, 4-5=-12.0, 5-6=-12.0, 6-7=-12.0, 7-8=-12.0, 8-9=-12.0, 9-10=-12.0, 10-32=-12.0, 11-32=-12.0, 11-12=-12.0,
1-30=-8.0, 28-29=-8.0, 27-28=-8.0, 26-27=-8.0, 25-26=-8.0, 24-25=-8.0, 23-24=-8.0, 22-23=-8.0, 21-22=-8.0, 20-21=-8.0, 19-20=-8.0, 18-19=-8.0,
17=-8.0, 15-16=-8.0, 14-15=-8.0
1.8, 2-3=-21.8, 3-31=-21.8, 4-31=-21.8, 4-5=-21.8, 5-6=-21.8, 6-7=-21.8, 7-8=-21.8, 8-9=-21.8, 9-10=-21.8, 10-32=-21.8, 11-32=-21.8, 11-12=-21.8,
3=-768 4=-398 5=-768 6=-220 23=-999
), 2-3=-20.0, 3-31=-20.0, 4-31=-20.0, 4-5=-20.0, 5-6=-20.0, 6-7=-20.0, 7-8=-20.0, 8-9=-20.0, 9-10=-20.0, 10-32=-20.0, 11-32=-20.0, 11-12=-20.0,
9-30=-13.3, 28-29=-13.3, 27-28=-13.3, 26-27=-13.3, 25-26=-13.3, 24-25=-13.3, 23-24=-13.3, 22-23=-13.3, 21-22=-13.3, 20-21=-13.3, 19-20=-13.3,
7-18=-13.3, 16-17=-13.3,15-16=-13.3, 14-15=-13.3
4=-635 5=-1226 6=-351 23=-1595
Job IIISt.Lucie Oaks Commercial Center
Truss Type Qty Ply Truss
_ MONO HIP 1 2 AG1
SCREW QTY (Total = 147 ). All Screws Are #12-14 T/3
CHORDS 1-2:5, 3-2:1 , 3-4:23, 13-14:5, 14-13:5
WEBS 2-24:27, 2- :12, 3-23:19, 3-24:11, 4-23:2. 5-21:9. 5-22:17, 5-23:13, 6-21:2, 7-19:6, 7-20:7, 7-21:3, 8-19:2, 9-17:7, 9-182, 9-19:7, 10-17:2, 11-15:18, 11-16:2, 11-17:8, 12-15:2,
� 13-15:8 '
2-2-0 3-7-5 2-4-6 2-4-6 1 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 t 3-6-0
2-2-0 5-9-5 8-1-11 10.6-0 14-6-0 18-6-0 22-6-0 26-6-0 30-6-0 34-6-0 38-6-0 42-0-0
12
0l N
7000SJD073712 24 23 22
11
21 20
MEO PLAng / w ELO eQ QU <QX'*3
�5ift LA`taT
19
18
'1 o 14
-*WAS 4%ANGEf-I E4N Ua_
SQU%un 5EE t.NWT`
0-2-0
2-0-0 3-7-5 1 2-4-6 1 2-4-6 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 i 4-0-0
2-0-0 5-9-5 8-1-11 10-6-0 14-6-0 18-6-0 22-6-0 26-6-0 30-6-0 34-6-0 38-6-0 42-0-0
2-2-0
QTY
i 1-25:8
15-11.18, l�-1'2:2,15-13:8,16-11:2,17-9:7,17-10:2,17-11:8,18-9:2,19-7:6, 19-8:2, 19-9:7, 20-7:8, 21-5:9, 21-6:8, 21-7:3, 22-5:18, 23-3:19, Truss weight 61 bs 24-3:11,
25-2:15 1
LOADING (psf) SPACING 1-4-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14T13)
TCLLI 20.0 Code TC 0.97 Vert(LL) 1.18 19-20 >403 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.91 Vert(TL) . -1.18 19-20 >403 057 5401b 073 6561b
BCLLI 0.0 WB 0.93 Horz(TL) -0.19 14 n/a 097 6621b #
BCDL 10.0 (Matrix) Min Length / LL deft = 240
STEEL SECTION BRACING
TOP i HORD 55 USD1111 057 50 -Except- TOP CHORD heath - , 3-13
T2 55 L1SD 097 50, W23 60 USWD 073 50 BOT -0-0 o e t r bracing 1-14
BOT CHORD 55 55 ;097 50 WE 0 • J 20ga 33 2-24 Attach to both web flanges of both plies, full
WEB 362 USWD 035 50 *Except` length, Attach
to
at 12" oc
W1 362i.USWD 046 50, W4 362 USWD 046 50, W6 60 USWD 07 (2)600 CSJ 20ga 33 3-23 Attach to both web flanges of both plies, full
W8 362('USWD 046 50, W12 362 USWD 073 50 length, w/19-#12-14 at 12" oc
W14 362 USWD 073 50, W16 60 USWD 073 50, W1 07 0 (2)600 CSJ 20ga 33 11-15 Attach to both web flanges of both plies, full
W22 3612 USWD 073 50 length, w/18412-14 at 12" oc
REACTIONS (jt/size/ eterial)14/0-4-0/UKN, 25/0-4-0/UKN
Max Do n 14=5628(load case 1), 25=12289(load ca 1)
Max Uplift 14=-5318(load case 2), 25=-12807(load case 2)
FOR�ES (lb) Max. Cojpipression Force
TOP CHORD 1-2=-4 1, 2-3=-19049, 3-4=-28978, 4-5=-28978, 5-6=-47336, 6-26=-47336, 7-26=-47336, 7-8=-40258, 8-9=-40258, 9-27=-24687, 10-27=-24687, 10-11=-24687,
11-12=I7977,12-13=-7977,13-14=-5741
BOTICHORD 1-25=-�a22, 24-25=-4730, 23-24=-18067, 22-23=-41646, 21-22=-41646, 20-21=-45194, 19-20=-45194, 18-19=-31042, 17-18=-31042, 16-17=-14859, 15-16=-14859,
14-15=14 _ _
WEBIS 8-19=-'�,�769 19=-855769- 8241259 173 261160-1 4359, 11017= 994169016-2 47811-815=-8964562 5217075183 15=-93428, 7-20=-3012, 7-19=-7880,
NOTES
1) 2-ply truss to be connected together with #10-16 screws as follows: Top chords connected with 1 row at 12 inches on center.
Bottom chords con ected with 1 row at 12 inches on center.
2) Thj-s truss has bee, jdesigned for unbalanced loading conditions.
3) TAis truss designe i ith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h =
33.8 ft., Exposure ategory C, Enclosed Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance =
12.00 ft. using a to chord tributary area of 581.02 sq. ft., 0.6 DL applied. The Right End Vertical is not exposed to Wind. Design
Ve�ocity Pressure, = 42.94 psf.
4) Horizontal load app, led to this truss resulting from the standard wind load, equal to 144 Ibs, has been considered to be resisted by
the diaphragm and nor other elements, the design of which shall be the responsibility of the Engineer of Record. Wind loads applied
tothe supporting wall should be considered when designing truss to wall connections.
5) S�ecial connections) required to support concentrated load(s) atjoint(s) 22, 21, 20.
C P ovide adequate �{ainage to prevent water ponding.
7) Ldad case(s) 1, 2 s been modified. Building designer must review loads to verify that they are correct for the intended use of this
trl ss.
8) Attach 5.5USGP x 2" at location of tie-in trusses - See detail US2US-4B.1
9) Special connection required at joints 20, 22,.21,
10) (op chord load ap lied at 0-0-0 oc via valley trusses above.
LOAD CASE(S). Sta II and Except:
1) Live:
Continued on page 2
071
7.16-32 s
MONO HIP 11 12 IAG1
29
LOADiCASE(S) Standard Except:
Uniform Loads (plf)
Vert: 1-2=-4 7, 2-3=-46.7, 3-4=46.7, 4-5=-46.7, 5-6=-46.7, 6-26=-46.7, 7-26=-46.7, 7-8=-46.7, 8-9=-46.7, 9-27=46.7, 10-27=46.7, 10-11=-46.7, 11-12=-46.7,
12-13=-46.7,-25=-13.3, 24-25=-13.3, 23-24=-13.3, 22-23=-13.3, 21-22=-13.3, 20-21=-13.3, 19-20=-13.3, 18-19=-13.3, 17-18=-13.3, 16-17=-13.3, 15-16=-13.3.
14-15=-13.3'
Soncentrated Loads lb)
Vert: 22=-7513 21=-3952 20=-3952
2).Wind 1 C&C:
Uniform Loads (plf)
Vert: 1-2=-12 0, 2-3=-12.0, 34=-12.0, 4-5=-12.0, 5-6=-12.0, 6-26=-12.0, 7-26=-12.0, 7-8=-12.0, 8-9=-12.0, 9-27=-12.0, 10-27=-12.0, 10-11=-12.0, 11-12=-12.0,
12-13=-12.0,,i1-25=-8.0, 24-25=-8.0, 23-24=-8.0, 22-23=-8.0, 21-22=-8.0, 20-21=-8.0, 19-20=-8.0, 18-19=-8.0, 17-18=-8.0, 16-17=-8.0, 15-16=-8.0, 14-15=-8.0
Normal: 1-2 9.0, 2-3=79.0, 3-4=73.3, 4-5=73.3, 5-6=73.3, 6-26=73.3, 7-26=61.8, 7-8=61.8, 8-9=61.8, 9-27=61.8, 10-27=73.3, 10-11=73.3, 11-12=73.3, 12-13=73.3,
1-25=115.7
Co I centrated Loadsl'(Ib)
Vert: 22=90 Y 21=3370 20=3370
i
i
Truss Type Qty Ply Truss
MONO HIP 18 1 B
16-32 s
15:08:18 2008 Page 1
QTY (Total = (222 ). All Screws Are #12-14 T/3
i 1-15:2, 7-6:1 7-8:8, 9-16:2, 10-16:12, 15-1:2, 16-10:12
1-14:4, 2-1 '2, 3-13:7, 3-14.9, 4-13:4, 5-12:5. 5-13:3, 6-12:6, 7-11:7, 7-12:10, 8-11:5, 8-16:10, 16-8:10, 16-11:7
2-5-0 1 2-0-0 5-5-15 5-5-15 1 5-5-15 5-1-15 4-5-1 4-3-8
2-5-0 4-5-0 9-10-15 15-4-14 20-10-12 26-0-11 30-5-12 34-9-4
QTY
325USJ®673x10
5 7000SJ073x12
15 0-514k C;4 K) 13 12 -1 -1 1J
2-0-0 `��rrrr5 10-11-14 9-7-0 4-3-8
2-0-0 9-10-15 20-10-12 30-5-12 34-9-4
2-5-0
16
-7:7. 11-:8:5. 11-16:7. 1
12-7:10. 13-3:7, 13-4:4, 13-5:3, 14-1:4, 14-2:14, 14-3:15
= 201
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLLI 20.0 Code TC 0.88 Vert(LL) 0.30 12-13 >999 035 2561b 046 4501b
TCDL) 15.0 FBC/AISI BC 0.94 Vert(TL) -0.46 12-13 >845 057 5401b 073 6561b
BCLL 0.0
WB 0.78 Horz(TL) 0.09 .10
n/a 097 6621b
BCDL 10.0 (Matrix) Min Length / LL deft = 240 #
STEFL SECTION BRACING
TOP HORD 35 USDi 046 50 *Except* TOP CHO D thed or 0 n center purlin spacing 1-7, 7-9
W1 362tIUSWD 035 50, T2 35 USD 035 50, W15 60 USWD 035 50 BOT CHO 0- n ce t r bracing 15-10
BOT CHORD 35 US :035 50 WEBS 1 R pt 7-12, 7-11
WEBS 362 US I D 035 50 *Except' INT(S 16
W3 362 (USWD 057 50, W4 362 USWD 057 50, W12 362 USWD 046 5
W13 3 2 USWD 046 50
REACTIONS Qt/size/ terial)10/0-8-0/CON, 14/0-10-0/CMU
Max Don 10=2875(load case 1), 14=3312(load case
Max Uplit 10=-2458(load case 2), 14=-3573(load case
FORCES (lb) Max. Co pression Force
TOP'CHORD 1-15= 48, 1-2=-948, 2-3=-764, 3-17=-4539, 4-17=-4360, 4-5=-4545, 5-18=-3155, 6-18=-3066, 6-7=-3308, 7-8=-1676, 8-9=-371, 10-16=-2845, 9-16=-201
BOTiCHORD 14-15= 13-14=-1602, 12-13=-2181, 11-12=-451, 10-11=-371
WEBS 1-14=- [4, 2-14=-310, 3-14=-3846, 3-13=-976, 4-13=-787, 5-13=-505, 5-12=-1164, 6-12=-3 , 7-12=-2188,7-11=-1758, 8-11=-971, 8-16=-2121, 11-16=-368
Nti I rz
1) T is truss designeddh ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
B�ilding, I = 1.00 , Iz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 397.23 sq. ft., 0.6 DL applied. The Right End
Vertical is exposed to Wind. The Left End Vertical is not exposed to Wind. Design Velocity Pressure, qhl= 42.94 psf.
2) Horizontal load applied to this truss resulting from the standard wind load, equal to 1121 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shll be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) Provide adequate drainage to prevent water ponding.
4) Top chord load app), ed at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stan(ard
i
i
�• i
w
i
Job St.Lucie Oaks Commercial Center Truss Type Oty ITruss
0710017 i MONO HIP 1 1 Bi
The Mi parch Company 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Tue Apr 29 15:23:50 2008 Page 1
SCREW QTY (Total 22 ). All Screws Are #12-14 T/3
CHORDS 1-15:2. 7-6: ,, 7-8:8, 9-16:2, 10-16:12, 15-1:2, 16-10:12
WEBS 1-14:4. 2-1 E2, 3-13:7, 3-14:9, 4-13:4, 5-12:5, 5-13:3, 6-12:6, 7-11:7, 7-12:10, 8-11:5, 8-16:10, 16-8:10, 16-11:7
2-5-0 2-0-0 5-5-15 5-5-15 5-5-15 5-7-4 3-11-12 4-3-8
_ 2-5-0 4-5-0 9-10-15 15-4-14 20-10-12 26-6-0 30-5-12 34-9-4
325US0073x10
7 9
i 4.50 12 8 7 e 5 13 -T31C
6
1 e
5 VV1 11 2 5 7000SJ073x12
� T 5
3 9 16
44 W 8 W �
3 6
� ' 5
C) 2 4 4 3ptl 5 ob
7 5 7 T3�
O
15 0-51'4 13 12 11 10
2-0-0 7-5-15 1 10-11-14 9-7-0 4-3-8
ii
2-0-0 9-10-15 20-10-12 30-5-12 34-9-4
2-5-0
SCREW QTY
WEBS 11-7:7, 11-8:5, 11-16:7, 12-5:5, 12-6:6, 12-7:10, 13-3:7, 13-4:4, 13-5:3, 14-1:4, 14-2:14, 14-3:15 Truss weight = 201 Ibs
LOADING (pst) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLLI 20.0 Code TC 0.95 Vert(LL) 0.30 12-13 >999 035 2561b 046 4501b
TCD 15.0 FBC/AISI BC 0.92 Vert(TL) -0.46 12-13 >843 057 5401b 073 6561b
097 6621b
BCLL 10 /
BCD 10.0 (Matrix) Min Length / LL defl = 240 #
STEEL SECTION BRACING
TOP bHORD 35 USD p46 50 *Except* TOP CHO a r 2- on center purlin spacing 1-7, 7-9
W1 362 iUSWD 035 50, T2 35 USD 035 50, W15 60 USWD 035 50 BOT CH O 4- center acing 15-10
BOT CHORD 35 USDI035 50 S 1 R, midpt 7-12, 7-11
WEBS 362 US D 035 50 *Except` PINT(S) 1
W3 362 ,USWD 057 50, W4 362 USWD 057 50, W12 362 USW 6 50
W13 36 2 USWD 046 50
REA TIONS Qt/size/m tenal)10/0-8-0/CON, 14/0-10-0/CMU
Max Do ,I' 10=2875(load case 1), 14=3312 d ca 1
Max Upli I 10=-2447(load case 2), 14=-3562 2j
i
FORCES (lb) Max. Copression Force
TOP CHORD 1-15=-3'I 8, 1-2=-948, 2-3=-763, 3-17=-4540, 4-17=-4360, 4-5=-4547, 5-18=-3157, 6-18=-3047, 6-7=-3316, 7-8=-1678, 8-9=-375, 10-16=-2845, 9-16=-208
BOT CHORD 14-15=01 13-14=-1581, 12-13=-2143, 11-12=-369, 10-11=-370
WEBS 1-14=-1,54, 2-14=-311„ 3-14=-3845, 3-13=-969, 4-13=-791, 5-13=-522, 5-12=-1152, 6-12=-853, 7-12=-2212, 7-11=-1744, 8-11=-993, 8-16=-2127, 11-16=-342
1) This truss designedlwith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 397.23 sq. ft., 0.6 DL applied. The Right End
Vertical is exposed >o Wind. The Left End Vertical is not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load applied to this truss resulting from the standard wind load, equal to 1124 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) Provide adequate drainage to prevent water ponding.
4) Top chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Standard
0710017
Truss Type Oty Ply Truss
MONO HIP 1 1 B2
s
Apr 29
CITY (Total L 191 ). All Screws Are #12-14 T/3
i 1-15:2, 7- :8, 7-8:4, 9-16:2, 10-16:12, 15-1:2, 16-10:12
1-14:4, 2- 4:2, 3-13:7, 3-14:9, 4-13:4, 5-12:6, 5-13:3, 6-12:4, 7-11:7, 7-12:5, 8-11:2, 8-16:10, 16-8:10, 16-11:8
2-5-0 2-0-0 5-5-15 5-5-15 5-5-15 1-7-4 7-11-12 1 4-3-8
2-5-0 4-5-0 9-10-15 15-4-14 20-10-12 22-6-0 30-5-12 34-9-4
CITY
325US6P73x10
15 14 13 " 'V
0-5-0
2-0-0 7-5-15 10-11-14 9-7-0 4-3-8
2-0-0 9-10-15 20-10-12 30-5-12 34-9-4
2-5-0
1 l 8:2, 11-16:8, 12-5:6, 12-6:4, 12-7:5, 13-3:7, 13-4:4, 13-5:3, 14-1:4, 14-2:9, 1
DK
7000SJ073x12
16
5K.
Truss weight = 217 Ibs
LOADING (psf)
TCLL 20.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
i
SPACING 4-0-0
Code
FBC/AISI
CSI
TC 0.99
BC 0.72
WB 0.82
(Matrix)
DEFL (in) (loc) I/defl
Vert(LL) 0.27 12-13 >999
Vert(TL) -0.38 12-13 >999
Horz(TL) 0.07 10 n/a
Min Length / LL deft = 240
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 662Ib
#
STEEL SECTION
TOP CHORD 35 USD
BRACING
046 50 `Except' TOP CHORD Sheath or 0- center purlin spacing 1-7, 7-9
W1 3d�
USWD 035 50, T2 35 USD 057 50, W15 60 USWD 035 50 BOT CHORD - r bra 15-10
BOT CHORD 35 USb
046 50 WEBS Row pt 7-11
WEBS 362 USWD
035 50 *Except* JOINT 6
W3 36
USWD 046 50, W4 362 USWD 046 50, W10 362 USWD 073 50
REACTIONS attsize/I
aterial)10/0-8-0/CON, 14/0-10-0/CMU
Max Dc
yvn 10=2875(load case 1), 14=3312(load case 1)
Max Uplift
10=-2524(load case 2), 14=-3692(load case 2)
FORCES (Ib) Max. Cllmpression
TOE CHORD 1-15-1
BOT CHORD 14-15�
Force
53, 1-2=-912, 2-3=-722, 3-17=-4533, 4-17=-4 14-18=-4289, 5-6=-3149, 6-7=-3074, 7-8=-1712, 8-9=-213, 10-16=-2842, 9-16=-76
13-14=-1753, 12-13=-2475, 11-12=-1228, 10- =-40
WEBS 1-14=-r
32, 2-14=-323, 3-14=-3815, 3-13=-1058, 4-13=- � 5-13=-407, 5-12=-1202, 6-12=-557, 7-12=-1836, 7-11=-1783, 8-11=-81, 8-16=-2010, 11-16=-1064
1) T is
B il(
Vert
2) Hori
desi
4) TI p
LOAD
truss designe JJ with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
ling, I = 1.00 , Utz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 397.23 sq. ft., 0.6 DL applied. The Right End
cal is expose Ito Wind. The Left End Vertical is not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
zontal load ap lied to this truss resulting from the standard wind load, equal to 990 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
gn of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
,ide adequate drainage to prevent water ponding.
chord load applied at 0-0-0 oc via valley trusses above.
Job St.Lucie Oaks Commercial Center Truss Type Qty Ply Truss
0710017 ROOF TRUSS 1 2 BFG
The Monarch Company 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon /
SCREW QTY (Total 1507 ). All Screws Are #12-14 T/3
CHORDS 1-17:16, 5-6:3, 6-5:20, 6-7:20, 9-10:18, 10-9:18, 13-6:4, 17-1:16
WEBS 1-16:15, 2 16:4, 3-14:9, 3-15:2, 3-16:12, 4-6:15, 4-14:3, 6-4:9, 6-14:13, 7-11:12, 7-12:5, 7-13:2, 8-11:2, 9-11:20
4-6-8 1 4-2-15 1 4-2-15 4-2-15 5-0-13 5-0 13 5-4-7
4-6-8 8-9-7 13-0-5 17-3-4 22-4-1 27-4-13 32-9 4
819
2
21 24
W8 2325
3
4
2 9
3
7
8
9
Q®
2 (5
2
1
2
3 WJ5
g VJ7
a000SJ07
W
W1
VT 2
13
VT 4
W
6-4
ao
ao
1
41
2 93MgE
1
3
1 2
1
11
4 2
16
4-6-8 4-2-15
15
4-2-15
14 125
4-2-15 5-0-13
26 12
1
27
5-0-13
11
28
5-4-7
10
C V cm
CONIVk 04
4-6-8 8-9-7
13-0-5
17-3-4 22-4-1
27-4-13
32-9.4
5gp, LpeyoIL)T
SCREW
WEBS
CITY
11-7:12, 1
-8:2, 11-9:20, 12-7:3, 13-7:2, 14-3:9, 14-4:3, 14-6:13, 15-3:2, 16-1:15, 16-2:4, 16-3:12 Truss weight = 666 Ibs
LOADING
(psf)
SPACING 4-0-0
Code
CSI
TC 0.86
DEFL (in) (loc) I/deft
Vert(LL) 0.44 12-13 >883
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
TCLL
TCDL
20.0
15.0
FBC/AISI
BC 0.89
Vert(TL) 0.35 12-13 >999
057 5401b 073 6561b
BCLL
0.0
WB 0.94
Horz(TL) -0.09 10 n/a
097 6621b
#
BCDL
10.0
(Matrix)
Min Length / LL defl = 240
STEEL SECTION
TOP CHORD 55 USD'
BRACING
035 50 *Except* TOP CHORD Sheathed o nter purlin spacing 1-5, 6-9
!a3
W1 60
JSWD 035 50, W10 362 USWD 035 50, W16 60 USWD 035 50 BOT CHORD 4-0 a acin 7-10
BOT (CHORD 55 US
04650 WEBS ( 0 C 31-17 Attach to both web flanges of both plies, full
WEBS 362 US
D 035 50'Except* length, w/12412-14 at 12" oc
W12 362 USWD 046 50 ( 00 C 20ga 33 9-10 Attach to both web flanges of both plies, full
W8 36�
USWD 046 50,
length, w/14412-14 at 12" oc
600 CSJ 20ga 33 1-16 Attach to both web flanges of both plies, full
length, w/15412-14 at 12" oc
(2)600 CSJ 20ga 33 3-16 Attach to both web flanges of both plies, full
length, w/9-#12-14 at 12" oc
(2)600 CSJ 20ga 33 3-14 Attach to both web flanges of both plies, full
length, w/9412-14 at 12" oc
(2)600 CSJ 20ga 33 6-14 Attach to both web flanges of both plies, full
length, w/10412-14 at 12" oc
(2)600 CSJ 20ga 33 7-11 Attach to both web flanges of both plies, full
length, w/9-#12-14 at 12" oc
(2)600 CSJ 20ga 33 9-11 Attach to both web flanges of both plies, full
length, w/21412-14 at 12" oc
Max Up
FORCES (lb) Max. Q
TOP CHORD 1-17=-
4-23=-
BOT CHORD 16-17=
1� 11-27=
WEBS 1-16=-
7-12=-
1) 2-ply truss to be c(
Bdttom chords con
2) THis truss has bee
3) Tl is truss designe
33.8 ft., Exposure
` 7.90 ft. using a tol
exposed to Wind.
4) Horizontal load api
the diaphragm anc
to the supporting v
5) For truss to truss
fo{ other type load
6) Ptovide adequate
terial)17/1-0-0/LGF, 10/0-3-8/UKN
I 17=5849(load case 1), 10=7421(load case 1)
17=-7904(load case 2), 10=-9218(load case 2)
pression Force
19, 1-18=-2291,18-19=-2291, 2-19=-2291, 2-20=-2291,3-20=-2291, 3-21=-5421, 21-22=-5421, 4-22=-5421,
0, 23-24=-151, 5-24=-166, 6-13=-1718, 5-6=-640, 6-7=-7823, 7-8=-4729, 8-9=-4729, 9-10=-7013
17, 15-16=-4926, 14-15=-4926, 13-14=-9856, 13-25=-9294, 25-26=-9294, 12-26=-9294, 12-27=-9294,
294, 11-28=-33, 10-28=-8
53, 2-16=-1001, 3-16=-4308, 3-15=-21, 3-14=-4406, 4-14=-1458, 4-6=-5913, 6-14=-4911, 7-13=-994,
B6, 7-11=-4623, 8-11=-759, 9-11=-10282
acted together with #10-16 screws as follows: Top chords connected with 1 row at 12 inches on center.
:ted with 1 row at 12 inches on center.
:signed for unbalanced loading conditions.
ith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h =
tegory C, Enclosed Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance =
lord tributary area of 397.23 sq. ft., 0.6 DL applied. The Left End Vertical and Right End Vertical are not
sign Velocity Pressure, qh = 42.94 psf.
J to this truss resulting from the standard wind load, equal to 468 Ibs, has been considered to be resisted by
other elements, the design of which shall be the responsibility of the Engineer of Record. Wind loads applied
should be considered when designing truss to wall connections.
iection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required
Design of connection(s) is delegated to the building designer.
nage to prevent water ponding.
-ontiriued on page 2
Truss Type Uty Fly i russ
ROOF TRUSS 1 2 BFG
6-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:26:56 2008 Page
NOTES
7) Load case(s) 1, 2, 3, 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of this truss.
8) Attach 5.5USGP x 1 I' at location of tie-in trusses - See detail US2US-4B.1
9) Top chord load appli d at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stand
1)'Live:
Uniform Loads (plf)
Vert: 1-18=
7-8=-140.0,
t, 10-28=-40.0
Concentrated Loads
Vert: 2=-223
2) Wind 1 C&C:
Uniform Loads (plf)
Vert: 1-18 —:
8-9=-36.0, 1
Normal: 1-1 f
7-8=219.9, E
Parallel: 5-6
Vert: 2=588
3) Wind 2 C&C:
Uniform Loads (plf)
Vert: 1-18=-
8-9=-36.0, 1
Normal: 1-1
8-9=-65.3
Parallel: 5-6
Vert: 2=588
4) Dead:
Un�form Loads (plf)
Vert: 1-18=-
8-9=-60.0, 1
Vert: 2=-1
I Except
W. 18-19=-140.0, 2-19=-140.0, 2-20=-140.0, 3-20=-140.0, 3-21=-140.0, 21-22=-140.0, 4-22=-140.0, 4-23=-140.0, 23-24=-140.0, 5-24=-140.0, 6-7=-140.0,
140.0, 16-17=-40.0, 15-16=40.0, 14-15=-40.0, 13-14=-40.0, 13-25=40.0, 25-26=-40.0, 12-26=-40.0, 12-27=-40.0, 11-27=-40.0, 11-28=-40.0,
�) t
:-223 18=-314 19=-243 22=-223 23=-243 24=-314 25=-1420 26=-1420 27=-1420 28=-1420
0, 18-19=-36.0, 2-19=-36.0, 2-20=-36.0, 3-20=-36.0, 3-21=-36.0, 21-22=-36.0, 4-22=-36.0, 4-23=-36.0, 23-24=-36.0, 5-24=-36.0, 6-7=-36.0, 7-8=-36.0,
7=-24.0, 15-16=-24.0, 14-15=-24.0, 13-14=-24.0, 13-25=-24.0, 25-26=-24.0, 12-26=-24.0, 12-27=-24.0, 11-27=-24.0, 11-28=-24.0, 10-28=-24.0
19.9, 18-19=219.9, 2-19=219.9, 2-20=219.9, 3-20=185.5, 3-21=185.5. 21-22=219.9, 4-22=219.9, 4-23=219.9, 23-24=219.9, 5-24=219.9, 6-7=219.9,
=219.9
19.9
588 18=586 19=510 22=588 23=510 24=586 25=2011 26=2011 27=2011 28=2011
0, 18-19=-36.0, 2-19=-36.0, 2-20=-36.0, 3-20=-36.0, 3-21=-36.0, 21-22=-36.0, 4-22=-36.0, 4-23=-36.0, 23-24=-36.0, 5-24=-36.0, 6-7=-36.0, 7-8=-36.0,
7=-24.0, 15-16=-24.0, 14-15=-24.0, 13-14=-24.0, 13-25=-24.0, 25-26=-24.0, 12-26=-24.0, 12-27=-24.0, 11-27=-24.0, 11-28=-24.0, 10-28=-24.0
55.3. 18-19=-65.3, 2-19=-65.3, 2-20=-65.3, 3-20=-65.3, 3-21=-65.3, 21-22=-65.3, 4-22=-65.3, 4-23=-65.3, 23-24=-65.3, 5-24=-65.3, 6-7=-65.3, 7-8=-65.3,
18=586 19=510 22=588 23=510 24=586 25=2011 26=2011 27=2011 28=2011
18-19=-60.0, 2-19=-60.0, 2-20=-60.0, 3-20=-60.0, 3-21=-60.0, 21-22=-60.0, C4-22= 4-23=- 0.0 3-24=-60.0, 5-24=-60.0, 6-7=-60.0, 7-8=-60.0,
:-40.0, 15-16=-40.0, 14-15=-40.0, 13-14=-40.0, 13-25=-40.0, 25-26=-40.0, 12-26=-40.0, 1 11-27=-40.0, 11-28=-40.0, 10-28=-40.0
24 18=-174 19=-135 22=-124 23=-135 24=-174 25=-789 26=-789 27=-789 28=-7
1
071001�7
Center
s
Truss I ype t lty r1y 1 russ
ROOF TRUSS 2 1 CA
28
Page
SCREW QTY (Total = -36 ). All Screws Are #12-14 T/3
CHORDS 1-6:2, 3-4:2 4-3:4, 6-1:2
WEBS 1-5:3, 2-4:4 2-5:5
I
I
a0
N
CM
I O
i
SCI EW QTY
WEBS 4-2:4, 5-1: , 5-2:7
TOP
BOT
TOP
IG (psf)
20.0
15.0
0.0
10.0
SECTION
iORD 351
W1
iORD 351
362
Max
Max.
1-6
5-6
1-5
2-4-0 6-9-4
ZB A 2-4-0 b-U-a
=
SPACING 4-0-0 CSI DEFL (in) (loc) I/deft
Code TC 0.98 Vert(LL) 0.02 6 >999
FBC/AISI BC 0.27 Vert(TL) 0.02 6 >999
WB 0.16 Horz(TL) 0.00 4 n/a
(Matrix) Min Length / LL deft = 240
BRACING
1S 035 50 'Except' TOP CHORD S thed o
362 USWD 035 50, W5 362 USWD 035 50 BOT CH once e
1JI,
1SD 035 50
US`/UD 035 50
e/nr��terial)4/0-4-0/USKW, 5/0-8-0/CMU
DoiJln 4=582(load case 3), 5=879(load case 1)
Upl� 4=-440(load case 2), 5=-1773(load case ,
Compression Force
-3'9, 1-2=-729, 2-3=-238, 3-4=-276
-0, 45=-83
=-8 ` 2-5=-679, 2-4=-832
T2l�
Truss weight = 27 Ibs
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b
on center purlin spacing 1-3
Icing 6-4
NUIt:Z
1) This truss designe 'with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Bulding, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 27.72 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load apptjed to this truss resulting from the standard wind load, equal to 731 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall) be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached to truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
4) Top chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Standard
I _ III
T2l�
Truss weight = 27 Ibs
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b
on center purlin spacing 1-3
Icing 6-4
NUIt:Z
1) This truss designe 'with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Bulding, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 27.72 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load apptjed to this truss resulting from the standard wind load, equal to 731 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall) be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached to truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
4) Top chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Standard
I _ III
0710017
Truss Type �Qty Ply Truss
ROOF TRUSS 2 1 CA1
[Ab-3L s
, LLC Mon Apr 28 10:
Page 1
SCREW CITY (Total = 31 ): All Screws Are #12-14 T/3
CHORDS 1-6:2, 3-1 2, 4-3:5, 6-1:2
WEBS 1-5:2, 2- 5
I
00
00
2-0-8 0-8-12
2-0-8 2-9-4
4.50 12
5
®�
W4
W3
1 2
z)
O
OD
V
5
CDo
O
2
11 +��..+
6
5 .+
2-0-0 0-Q-8 0-8-12
2-0-0 2-0-8 2-94
aK
SCREW QTY Truss weight = 11 Ibs
W BS 5-1:2, 5- :11
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.65 Vert(LL) 0.06 6 >758 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.70 Vert(TL) 0.05 6 >869 057 5401b 073 6561b
BCLL 0.0 WB 0.14 Horz(TL) 0.00 n/a 09766211
BCDL 10.0 (Matrix) Min Length / LL defl = 240 #
STEEL SECTION BRACING
TOP CHORD 35 USD 035 50 *Except*
TOP CHOS athed
W1 3(2 USWD 035 50, W4 362 USWD 035 50 BOT C ''��p�`'4- on c ter racing 6-4
BOT CHORD 35 us 035 50
WEI S 362 U§WD 035 50 -40
REACTIONS Qt/size/I►►paterial)4/0-8-0/CMU, 4/0-8-0/CMU, 5/0-8-0/CMU
Max D'Wn 4=1291(load case 2), 5=944(load case 1 d
Max U ift 4=-500(load case 1), 4=-500(load case 1 =-\5%1dqMax Hiizorital 4=-33(load case 1), 4=-33(load case 1), 5 (
FOR, (lb) Max. C Iompression Force
TOP CHORD 1-6=-l13 1-2=-291, 2-3=-135, 3-4=-512
BO CHORD 5-6=0 4-5=-1
WE, S 1-5=- 07, 2-5=-526
1) This truss designe
quilding, I = 1.00 ,
Vertical and Right
2) F orizontal load ap
design of which st
3) 35USKW attache(
4) lop chord load aF
LOAD-CASE(S) Sta
I_
I with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
{z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 10.63 sq. ft., 0.6 DL applied. The Left End
-nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
lied to this truss resulting from the standard wind load, equal to 248 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
all be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
to truss at Joint with 4 410 sds. Refer to Aegis detail US2US-1.
flied at 0-0-0 oc via valley trusses above.
Pl
Job St.Lucie Oaks Commercial Center Truss Type Qty y Truss
0710017 ROOF TRUSS 8 1 CD
7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 1
Page
SCREW CITY (Total =,32 ). All Screws Are #12-14 T/3
CHORDS 1-6:2, 34:2, 4-3:4, 6-1:2
WEBS 1-5:3, 2-4: l; 2-5:3
2_4_0 2-7-10
2-4-0 4-11-10
T2 K
2-0-0 9 4.0 2-7-10
2-0-0 2-4-0 4-1 1-10
SCREW
WE
WE
CITY
S 4-2:4, 5-1 c
1, 5-2:5
weight = 23 Ibs
LOADING
(psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCLLl
20.0
Code
TC 0.42
Vert(LL) 0.01 5-6 >999
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.23
Vert(TL) 0.01 5-6 >999
057 5401b 073 6561b
BCLLI
0.0
WB 0.13
Horz(TL) 0.00 4 n/a
097 6621b
BCDL
10.0
(Matrix)
Min Length / LL deft = 240
#
i
STEEL SECTION
BRACING
TOP CHORD 35 USD 035 50 *Except*
TOP CHORD Sheathed
'
W1 362 b,9WD 035 50, W5 362 USWD 035 50
BOT CHORD 4-0-0 on to ra
6-4
i
BOT CHORD 35 USD 035 50
WEBS 362 US' D 035 50
REACTIONS at/size/rratedal)4/0-4-0/USKW, 5/0-8-0/CMU
TOP
BOT
WEE
NOTI
1) Tf
BL
VE
2) H(
de
3) 35
4) Tc
Max Dowp 4=891(load case 3), 5=789(load case 1)
Max Upli 4=-328(load case 2), 5=-1125(load case 2)
;ES (lb) Max. Coll ppression Force
CHORD 1-6=-32 , 1-2=-545, 2-3=-203, 3-4=-292
CHORD S 5-6=-1,!R-5=-149 1-5=-14 , 2-5=-626, 2-4=-845
:S
's truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
]ding, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 22.51 sq. ft., 0.6 DL applied. The Left End
lical and Right E'I d Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
zontal load appl ed to this truss resulting from the standard wind load, equal to 729 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
sign of which sha I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
USKW attached fo truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
p chord load applied at 0-0-0 oc via valley trusses above.
3 CASE(S) Standard
0710017
Truss Type Oty Ply Truss
ROOF TRUSS 8 1 CD1
s Sep
Apr 28 10:26:58 2008
SCREW QTY (Total 116 ). All Screws Are #12-14 T/3
CHORDS 1-4:2, 2-3: , 3-2:4, 4-1:4
WEBS 1-3:2
I
TOP
BOT
K
2)
4)
5)
N
M
"TZK
N CITY
3-1:2
IG (psf) SPACING 4-0-0
20.0 Code
15.0 FBC/AISI
0.0
10.0
SECTION
-LORD 35 US 035 50 -Except`
W1 362 USWD 035 50, W3 362 USWD 035 50
iORD 35 USDi 035 50
362 USWD 035 50
0-11-10
0-11-10
8 00
4 J
CSI
TC 0.04
BC 0.02
WB 0.02
(Matrix)
:rial)4/0-4-0/USKW, 3/0-4-0/USKW
4-71 I d 2 3-184(load case 3)
0-11-10
0-11-10
DEFL (in)
(loc) I/deft
Vert(LL) 0.00
4 >999
Vert(TL) -0.00
4 >999
Horz(TL) -0.00
3 n/a
Min Length / LL defl = 240
BRACING
TOP CHORD
Sheathed 1-�2� Al
BOT CHORD
��
4-0-0 on je"4l 4-3
rvidx w�q� - ( oa CBSe ) -
Max Up]
ff 4=-20(load case 3), 3=-189(load case 2)
:ES (lb) Max. Cq�npression Force
CHORD 1-4=-52, 1-2=-74, 2-3=-105
CHORD 3-4=-113
S 1-3=-1 -,7
Truss weight = 4 Ibs
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b
-S
C, Enclosed
is truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category
ilding, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 3.27 sq. ft., 0.6 DL applied. The Left End
rtical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
rizontal load applied to this truss resulting from the standard wind load, equal to 112 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
sign of which sh II be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections
USKW attached truss at Joint 3 with 4 410 sds. Refer to Aegis detail US2US-1.
USKW attached l(o truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
p chord load app�ied at 0-0-0 oc via valley trusses above.
J CASE(S) Standard
07100i17
The Monarch Compan,
Truss Type �Qty Ply Truss
ROOF TRUSS 2 1 CK
16-32 s
SCREW QTY (Total =
CHORDS 1-6:2, 3-4::
WEBS 1-5:4, 2-45
K
2)
3)
4)
CITY
141 ). All Screws Are #12-14 T/3
„ 4-3:4, 6-1:2
I, 2-5:7
5-1 !4. 5-2:10
0
N
N
O
ob
a
JG (psf) SPACING 4-0-0
20.0 Code
15.0 FBC/AISI
0.0
10.0
SECTION
10RD 35 US j 035 50 *Except*
W1 36 , USWD 035 50, W5 362 USWD 035 50
10RD 35 USD 035 50
362 USWD 035 50
2-6-0 1-6-u
2-6-0 4-0-0
4.50 Fi2
2-0-0 0-6-0 1-6-0
2-0-0 2-6-0 4-0-0
CSI
DEFL (in) (loc) I/defi
TC 0.50
Vert(LL) 0.03 6 >999
BC 0.36
Vert(TL) 0.03 6 >999
WB 0.19
Horz(TL) 0.00 4 n/a
(Matrix)
Min Length / LL deft = 240
BRACING
TOP CHORD Sheathed
BOT CHORD 4-OALMSeLl
W C)
:TIONS 0t/size/r�i'iaterial)4/0-4-0/USKW, 5/0-10-0/CMU
Max Down 4=739(load case 3), 5=912(load case 1)
Max Uplift 4=-247(load case 1), 5=-2395(load case 2) 1
:ES (lb) Max. Compression Force `�► Q�„� F�
CHORD 1-6=-3¢¢,3, 1-2=-958, 2-3=-61, 3-4=-72
CHORD 5-6=-1)�-5=-264
S 1-5=-2�,8, 2-5=-725, 2-4=-768
T2K
Truss weight =
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b
is truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
ilding, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using atop chord tributary area of 15.88 sq. ft., 0.6 DL applied. The Left End
rticai and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
rizontai load applied to this truss resulting from the standard wind load, equal to 465 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
sign of which sh I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
USKW attached to truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
p chord load applied at 0-0-0 oc via valley trusses above.
CASE(S) Standard
0710017
Oaks Commercial Center
Truss Type Qty Ply Truss
ROOF TRUSS 4 1 CL
[.Ib-Jz s
2008
QTY (Total45 ). All Screws Are #12-14 Tl3
i 1-6:2, 3-4: , 4-3:4, 6-1:2
1-5:5, 2-4: , 2-5:7
3-0-0 2-9-0
3-0-0 5-9-0
72 K
SCREW
WE13S
QTY
4-2:4, 5-1
2-0-0
2-0-0
, 5-2:10
1-0-0 2-9-0
3-0-0 C 5-9-0
Truss weight = 24 Ibs
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCL4 20.0
Code
TC 0.72
Vert(LL) 0.04 5-6 >999
035 2561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.41
Vert(TL) 0.04 5-6 >999
057 5401b 073 6561b
BCLL 0.0
WB 0.20
Horz(TL) 0.00 4 n/a
097 6621b
BCDL 10.0
(Matrix)
Min Length / LL deft = 240
#
STEEL SECTION
BRACING
TOP CHORD 35 USD
035 50 *Except`
TOP CHORD Sheathed 1-3
W1 36�
USWD 035 50, W5 362 USWD 035 50
BOT CHORD 4-0-0 on cen br ing
BOT CHORD 35 USd
035 50
WEBS 362 USWD
035 50
REACTIONS (jUsize/naaterial)4/0 4-0/USKW, 5/2-0-0/CMU
Max Do n 4=744(load case 3), 5=1028(load case 1)
Max Upl {t 4=-47(load case 1), 5=-2434(load case 2)
FORCES (lb) Max. Compression Force
TOP CHORD 1-6=4 61 1-2=-1198, 2-3=-146, 3-4=-163
BOT CHORD 5-6=-11�-5=-318 evo\N5
WEBS 1-5=-321, 2-5=-823, 2-4=-864
NOTES
1) THis truss designe �with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , 'R` = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 23.70 sq. ft., 0.6 DL applied. The Left End
Vertical and Right rd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load app led to this truss resulting from the standard wind load, equal to 700 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which sha,l be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached o truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
4) TO, chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stanpard
0710017
Truss Type Qty Ply Truss
ROOF TRUSS 4 1 CL1
s SeD 25 2007
SCREW QTY (Total
CHORDS 1-4:2, 24
WEBS 1-3:2
I
I
l
I
i
SCREW QTY
WEBS 3-1:2
6). All Screws Are #12-14 T/3
3-2:4, 4-1:4
7
1-9-0
r nn re n
1-9-0
a
= 7 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.15 Vert(LL) 0.00 4 >999 035 2561b 046 4501b
TCD,L 15.0 FBC/AISI BC 0.04 Vert(TL) -0.00 4 >999 057 5401b 073 6561b
BCLL 0.0 WB 0.03 Horz(TL) -0.00 3 n/a 097 6621b
BCDL 10.0 (Matrix) Min Length / LL deft = 240 #
STEEL SECTION BRACING
TOP CHORD 35 USQ 035 50 *Except* TOP CHORD Shea tred
W1 36 USWD 035 50, W3 362 USWD 035 50 BOT CHORD 4-0 n c acing
BOT CHORD 35 USO 035 50
WEBS 362 USWD 035 50
REACTIONS at/size/II aterial)4/0-4-0/USKW, 3/0-4-0/USKW
Max Dgyvn 4=130(load case 1), 3=172(load case 3)
Max Uplift 4=-69(load case 2), 3=-312(load case 2)
FORCES (lb) Max. Cllmpression Force
TOP CHORD 1-4=-1101, 1-2=-125, 2-3=-128
BOT CHORD 3-4=-213
WEBS 1-3=- 0
NOTES
1) This truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.60 ,1} z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 6.36 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) FIorizontal load applied to this truss resulting from the standard wind load, equal to 212 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached to truss at Joint 3 with 4 410 sds. Refer to Aegis detail US2US-1.
4) 35USKW attached) to truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
5) Top chord load ap}�lied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stanndard
I I'I
071
ROOF TRUSS 2 1 CL2
s Ser) 25 2007 Aegis Metal Framing, LL(
SCREW CITY (T(
CHORDS 1-4:2,
WEBS 1-3:2
I
i
16 ). All Screws Are #12-14 T/3
3-2:4, 4-1:4
w
4
TZK
2-5-0
5.00 12
2-5-0
3
SCREW CITY
WEBS 3-1:2 Truss weight = 9 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.31 Vert(LL) 0.00 4 >999 03 561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.06 Vert(TL) -0.00 3-4 >999 05 401b 073 6561b
BCLL 0.0 WB 0.04 Horz(TL) -0.00 3 n/a 621b
BCDL 10.0 (Matrix) Min Length / LL deft = 240 #
STEEL SECTION BRACING
TOP CHORD 35 US 035 50 'Except' TOP CHORD ea ed
W1 36�,2 USWD 035 50, W3 362 USWD 035 50 BOT C ORD -0-0 on ce cing 4-3
BOT CHORD 35 USD 035 50
WEBS 362 USWD 035 50
REACTIONS (t/sizenaterial)4/0-4-0/USKW, 3/0-4-0/USKW
Max D wn 4=190(load case 1), 3=237(load case 3)
iMax Ilift 4:-140(load case 2), 3=-416(load case 2)
FORCES (lb) Max. Impression Force
TOP CHORD 1-4=I148, 1-2=-178, 2-3=-186
BOT CHORD 3-4=- 03
WEBS 1-3=-112
truss design@d with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
ling, I = 1.00 rIKz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft, using a top chord tributary area of 9.25 sq. ft., 0.6 DL applied. The Left End
ical and Rights nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
zontal load applied to this truss resulting from the standard wind load, equal to 302 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
gn of which sli'all be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
SKW a achei to truss at Joint 3 with 4 - #10 sds. Refer to Aegis detail US2US-1.
SKW attachdi to truss at Joint 4 with 4 - #10 sds. Refer to Aegis detail US2US-1.
chord load applied at 0-0-0 oc via valley trusses above.
CASE(S) Sta}dard
071i017
The Monarch Cure
SCREW QTY (Tc
CHORDS 1-4:2,
WEBS 1-3:2
A,
QTY
LOADING (psf)
TOLL 20.0
TCDL 15.0
BOLL 0.0
BCDL 10.0
STEEL SECTION
TOP CHORD 35 U
W1
BOT CHORD 35 U
WEBS 362
16 ). All Screws Are #12-14 T/3
, 3-2:4, 4-1:4
O
00
N
O
00
O
4
T2K
i--
SPACING 4-0-0 CSI
Code TC OA5
FBC/AISI BC 0.10
WB 0.05
(Matrix)
035 50 `Except'
USWD 035 50, W3 362 USWD 035 50
03550
3WD 035 50
REACTIONS Qt/size� aterial)4/0-4-0/USKW, 3/0-4-0/USKW
Max D)wn 4=243(load case 1), 3=510(load case 3)
Max U lift 4=-4(load case 2), 3=-463(load case 2)
FORCES (lb) Max. Compression Force
TOP CHORD 1-4=- 89, 1-2=-280, 2-3=-411
BO,T CHORD 3-4= 28
WEBS 1-3=- 42
s
3-0-0
3-0-0
3-0-0
fr—uss Type �Qty Ply Truss
ROOF TRUSS 8 1 CM
3
DEFL (in) (loc) I/deft
Vert(LL) 0.00 4 >999
Vert(TL) -0.00 3-4 >999
Horz(TL) -0.00 3 n/a
Min Length / LL deft = 240
BRACING
TOP CHO�n-Oon
BOT CMAR�to
(T2D
4-3
28 10:27:00 2008 Pagel
= 12 Ibs
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097662lb
NOTES
1) This truss design d with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 `' Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 13.05 sq. ft., 0.6 DL applied. The Left End
Vertical and Rightli End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) orizontal load ap lied to this truss resulting from the standard wind load, equal to 428 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
. esign of which s 'all be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attache to truss at Joint 3 with 4 -#10 sds. Refer to Aegis detail US2US-1.
4) 35USKW attache to truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
5) Top chord load ap�lied at 0-0-0 oc via valley trusses above.
LOAD- CASE(S) Standard
dard
071001
ROOF TRUSS 16 11 I CN
s
i
CITY (Total = 5 ). All Screws Are #12-14 T/3
i 1-6:2, 3-4:211; -3:5. 6-1:2
1-5:2, 2�
CITY
LOADING (psi)
TCLL 20.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
STEEL SECTION
TOPS CHORD 351
W1
BOT CHORD 351
WEBS 362
Max
:ES (lb) Max.
CHORD 1-6=
CHORD 5-6=
its truss designs
(ilding, I = 1.00 ;
:rtical and Right
xizontal load ap
;sign of which st
;USKW attache(
)p chord load ap
D CASE(S) Sta
2-0-0 1-0-0
2-0-0 3-0-0
-TZK
2-0-0 1-0-0
2-0-0 3-0-0
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
Code
TC 0.35
Vert(LL) 0.08 6 >614
FBC/AISI
BC 0.84
Vert(TL) 0.07 6 >707
WB 0.09
Horz(TL) -0.00 4 n/a
(Matrix)
Min Length / LL deft = 240
BRACING
035 50 `Except*
TOP CHORD Sheathed 1-3
USWD 035 50, W4 362 USWD 035 50
BOT CHORD 4-0-0 on center bras
03550
1
ND 035 50
ow
Truss weight = 14 Ibs
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b
aterial)4/0-4-0/USKW, 5/0-8-0/LGF
in 4=1127(load case 3), 5=938(load case 1)
ft 4=-453(load case 1), 5=-1578(load case 2)
repression Force
1, 1-2=-392, 2-3=-172, 3-4=-382
1-5=-72
5, 2-5=-511
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
:z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 13.05 sq. ft., 0.6 DL applied. The Left End
nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
ied to this truss resulting from the standard wind load, equal to 448 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
II be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
o truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
ied at 0-0-0 oc via valley trusses above.
0017
MEVA
ROOF TRUSS 14 11 I CR
s
2008
CITY (Tote = 45 ). All Screws Are #12-14 T/3
i 1-6:2, 34:2, 4-3:4, 6-1:2
1-5:5, 24:4, 2-5:7
N
O
M
O
00
a
3-0-0 5-9-0
T2K
2-0-0 1-0-0 2-9-0
2-0-0 3-0-0 C SV 5-9-0
SCREW CITY 1�
WEBS 4-2:4, 5- :5, 5-2:10 Truss weight = 24 Ibs
LO DING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/defl SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.72 Vert(LL) 0.04 5-6 >999 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.41 Vert(TL) 0.04 5-6 >999 057 5401b 073 6561b
BCLL 0.0 WB 0.20 Horz(TL) 0.00 4 n/a 097 6621b
BCbL 10.0 (Matrix) Min Length / LL deft = 240 #
STEEL SECTION H BRACING
TO I CHORD 35 USD 035 50 *Except` TOP CHORD Sheaed 1-3
W1 362 USWD 035 50, W5 362 USWD 035 50 BOT CHORD 4-0-0 othn cent
en r r i g 6-4
BOT CHORD 35 USD 035 50
WEBS 362 USWD 035 50
REACTIONSOtIsize/I�naterial)4/0-4-0/USKW, 5/2-0-0/CMU
Max Dcyan 4=744(load case 3), 5=1028(load case 1)
Max UI lift 4=-47(load case 1), 5=-2434(load case 2)
FORCES (lb) Max. Cllompression Force
TOP CHORD 1-6=-466, 1-2=-1198, 2-3=-146, 3-4=-163
BOT CHORD 5-6=-1I, 4-5=-318
WEBS 1-5=-3 1, 2-5=-823, 2-4=-864
NOTES
1) T is truss designe with ASCE 7-02 wind load as referenced by FB . V = 1 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
gilding, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zo "a" distance = 7.90 ft. using a top chord tributary area of 23.70 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Hbrizontal load applied to this truss resulting from the standard wind load, equal to 700 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which sh'll be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached �o truss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
4) Top chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stan,Yard
0710017
Truss Type Oty Ply Truss
ROOF TRUSS 4 1 CR1
7.16-32 s Sao 25 2007 Aegis Metal Framing, LLC
10:27:02
QTY (Total
i 14:2. 2-:
1-3:2
6 ). All Screws Are #12-14 T/3
3-2:4, 4-1:4
N
CITY
LOADING (pso SPACING 4-0-0
TCLL 20.0 Code
TCDL 15.0 FBC/AISI
BCLL 0.0
BCDL 10.0
O
0P
O
STEEL! SECTION
TOP CHORD 35 USD 35 50 *Except*
Al 362 ?0SWD 035 50, W3 362 USWD 035 50
BOT CHORD 35 USD'? 50
WEBS; 362 US 4p 035 50
1-9-0
cnn[77
1-9-0
1-9-0
CSI
DEFL (in) (Joe) I/defl
TC 0.15
Vert(LL) 0.00 4 >999
BC 0.04
Vert(TL) -0.00 4 >999
WB 0.03
Horz(TL) -0.00 3 n/a
(Matrix)
Min Length / LL deft = 240
BRACING
TOP CHORD Sheathed 1-
BOT CHORD 4-0-0 t ing
REACTIONS QUsize/ma erial)4/0-4-0/USKW, 3/0-4-0/USKW
Max Dow 4=130(load case 1), 3=172(load case 3) %woo
Max Uplift 4=-69(load case 2), 3=-312(load case 2)
FORCES (lb) Max. Com Dression Force
TOP CHORD 14=-101 1-2=-125, 2-3=-128
BOT CHORD 34=-213
WEBS 1 1-3=-80 11
Truss wei ng t = 7
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b
NOTES
1) Thisltruss designed w h ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Buil ing, I = 1.00 , Kz 1`— 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 6.36 sq. ft., 0.6 DL applied. The Left End
Verti I and Right En Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load applie to this truss resulting from the standard wind load, equal to 212 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall tie the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached to russ at Joint 3 with 4 410 sds. Refer to Aegis detail US2US-1.
4) 35USKW attached touss at Joint 4 with 4 410 sds. Refer to Aegis detail US2US-1.
5) Top chord load applie at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Standa
07100
6-32 s
Truss Type Qty Ply Truss
ROOF TRUSS 2 1 CR2
QTY (Total 2All Screws Are #12-14 T/3
i 1-4:2,2-341
1-3:2 4
N
N
N
3-9-0
3-9-0
nn
3-9-0 C�-
3-9-0
3
Tz K
SCREW CITY
WEBS 3-1:2
Truss weight = 14 Ibs
LOADING (pso
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCLLI 20.0
Code
TC 0.77
Vert(LL) 0.00 4 >999
035 2561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.14
Vert(TL) -0.01 3-4 >999
057 5401b 073 6561b
BCLLJ 0.0
WB 0.06
Horz(TL) -0.00 3 n/a
97 6621b
BCDLI 10.0
(Matrix)
Min Length / LL deft = 240
#
STEEL SECTION
BRACING
TOP CHORD 35 USDi 035 50 *Except*
TOP CHORD Sheathe
W1 362(,iUSWD 035 50, W3 362 USWD 035 50
BOT CHORD 4-0-0 o ente Jng 4-3
BOT CHORD 35 USDl'0'35 50
WEBi 362 US' 035 50
REACTIONS at/size/rr terial)4/0-4-0/USKW, 3/0-4-0/USKW
CID.
Max Dov �i 4=310(load case 1), 3=354(load case 3)
Max Upli 4=-261(load case 2), 3=-593(load case 2)
FORCES (lb) Max. Co pression Force
TOP CHORD 1-4=-2 � , 1-2=-270, 2-3=-289
BOT CHORD 3-4=-46
WEBS 1-3=-16
NOTES 11
1) This truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , a = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 15.03 sq. ft., 0.6 DL applied. The Left End
Vertical and Right E' d Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load appl ad to this truss resulting from the standard wind load, equal to 459 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which she. 1 be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 350SKW attached to truss at Joint 3 with 4 410 sds. Refer to Aegis detail US2US-1.
4) 350SKW attached tl? truss at Joint 4 with 4 -#10 sds. Refer to Aegis detail US2US-1.
5) Top chord load applli,d at 0-0-0 oc via valley trusses above.
LOAD-CASE(8) Standard
ROOF TRUSS 18 11 ID
s
28
QTY (Tota I= 192). All Screws Are #12-14 T/3
i 1-17:2, ;3:6, 4-5:11, 6-5:11, 6-7:6, 9-10:2, 10-9:2, 17-1:2
1-16:2, ',15:9, 2-16:12, 3-14:4, 3-15:3, 4-14:5, 5-13:2, 5-14:2, 6-13:5, 7-12:3, 7-13:4, 8-11:12, 8-12:9, 9-11:2
2-6-0 5-3-0 5-3-0 4-0-0 4-0-0 5-3-0 5-3-0 2-6-0
2-6-0 7-9-0 13-0-0 17-0-0 21-0-0 26-3-0 31-6-0 34-0-0
I
325US,=73x10 32511.11SM073x10
6 0
I'
0
17 0-6- C4 K 15 14 13 12� 11 2-0-010
2-0-0 1 5-3-0 5-3-0 8-0-0 5-3-0 5-3-0 060
2-0-0 7-9-0 13-0-0 21-0-0 26-3-0 31-6-0 32-0-0
2-6-0 34-0-0
SCREW QTY
WEBS 11-8:13, 1-9:2, 12-7:3, 12-8:9, 13-5:2, 13-6:5, 13-7:4, 14-3:4, 14-4:5, 14-5:2, 15-2:9, 15-3:3, 16-1:2, 16-2:13 Truss weight = 192 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/defl SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.96 Vert(li 0.11 13 >999 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.42 Vert(TL) -0.16 13-14 >999 057 540lb 073 6561b
BCLL 0.0 WB 0.50 Horz(TL) 0.04 11 n/a 097 6621b
BCDL 10.0 (Matrix) Min Length / LL deft = 240 #
STEEL SECTION BRACING
TOP CHORD 35 US 057 50 `Except' TOP CHORD Sheathed or 1 A91o
rpurlin spacing 1-4, 4-6, 6-9
W1 36 USWD 035 50, T2 35 USD 035 50, W16 362 USWD 035 50 BOTCHORD 4-0-0 on ent ra
BOT CHORD 35US 03550
WEBS 362 UtWD 035 50
REACTIONS at/size/aterial)16/0-10-0/CMU, 11/0-10-0/CMU
Max Do n 16=3033(load case 1), 11=3033(load case 1)
Max Uplift 16=-3207(load case 2), 11=-3207(load cas42)
FORCES (lb) Max. C ;mpression Force
TOPCHORD 1-17=- 18,1-2=-495,2-3=-3103,3-4=-3129,4-5=-2798,5,\6-31--3103, 8-9=-495, 9-10=-418
BOT CHORD 16-17 15-16=-45,14-15=-1056,13-14=-816,12-13=-1011 =0WEBS 1-16= 6,2-16=-2967,2-15=-1649,3-15=-619,3-14=-9247=-509, 5-13=-347, 6-13=-713, 7-13=-924, 7-12=-619, 8-12=-1649, 8-11=-2967, 9-11=-37
NOTES
1) This truss has bee designed for unbalanced loading conditions.
2) This truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 381.92 sq. ft., 0.6 DL applied. The Left End
Vertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) Provide adequate c lainage to prevent water ponding.
4) Top chord load apf ied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stan' and
071
Truss Type Qty Ply Tn
ROOF TRUSS 5 1 D1
s Sep 25 2007 Aegis Metal Framing, LI
2008
SCREW CITY (Total = 081 ). All Screws Are #12-14 T/3
CHO�DS 1-15:2, 4-3 6, 4-5:11, 6-5:11, 6-7:5, 8-9:7, 9-8:12, 15-1:2
WEBS 1-14:2. 2-1 :9, 2-14:12, 3-12:4, 3-13:3, 4-12:5, 5-11:2, 5-12:3, 6-11:5, 7-10:3, 7-11:4, 8-10:10
2-6-0 5-3-0 5-3-0 4-0-0 4-0-0 5-4-3 5-7-13
i
2-6-0 7-9-0 13-0-0 17-0-0 21-0-0 26-4-3 32-0-0
325US0073xl0 325USM073xl0
2-0-00 6 0 5-3-0 5-3-0 8-0-0 5-4-J o-i-is
2-0-02-6-0 7-9-0 13-0-0 21-0-0 26-4-3 32-0-0
SCREW CITY
WEBS 10-7:3, 10- :10, 11-5:2, 11-6:5, 11-7:4, 12-3:4, 12-4:5, 12-5:3, 13-2:9, 13-3:3, 14-1:2, 14-2:13 Truss weight= 189 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.96 Vert(LL) 0.12 11-12 >999 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.46 Vert(TL) -0.17 11-12 >999 057 5401b 073 6561b
BCLL 0.0 WB 0.58 Horz(TL) 0.05 9 n/a 097 6621b
BCDL 10.0 (Matrix) Min Length / LL deft = 240 #
STEEL SECTION I BRACING
TOP CHORD 35 USD r7 50 *Except* TOP CHORD Sheathed or 1- 3 o ce purlin spacing 1-4, 4-6, 6-8
W1 362 SWD 035 50, T2 35 USD 035 50, T3 35 USD 073 50 BOT CHORD 4-0-0 o - b 15-
W14 362 USWD 046 50
BOT CHORD 35 USD Ib35 50
WEB$ 362 US,rD 035 50
REACTIONS (jt/size/m�terial)9/0-10-0/CMU, 14/0-10-0/CMU
Max DotiJn 9=2966(load case 3), 14=3081(load case 1)
Max Upli 9=-2130(load case 2), 14=-3266(load case 2)
FORCES (lb) Max. Coi ipression Force
TOP CHORD 1-15=-4 7, 1-2=-497, 2-3=-3117, 3-4=-3146, 4-5=-2813, 5-6= 24, 6 170, 7-8=-3105, 8-9=-2905
BOT CHORD 14-15= i 13-14=-45, 12-13=-1402, 11-12=-1200, 10-11=-1633, 10=-1
WEBS 1-14=4 5, 2-14=-2981, 2-13=-1710, 3-13=-637, 3-12=-919, 4-12=-755, 5-12=-558, 5-11=-293, 6-11=-804, 7-11=-1001, 7-10=-634, 8-10=-1718
NOTES
1) This truss has been 11 esigned for unbalanced loading conditions.
2) This truss designed kith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , ' = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 338.12 sq. ft., 0.6 DL applied. The Left End
Vertical and Right E d Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) Horizontal load appli d to this truss resulting from the standard wind load, equal to 292 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shal The the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
4) Provide adequate drainage to prevent water ponding.
5) Top chord load appli d at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stand rd
071
Truss Type �Qty Ply Truss
ROOF TRUSS 2 1 D2G
QTY (Total = �96 ). All Screws Are #12-14 T/3
i 1-2:2, 4-3:1 4-5:8, 8-7:6, 8-9:11, 11-10:3
2-20:8, 2-21� 3, 3-19:3, 3-20:6, 4-18:6, 4-19:11, 5-17:14, 5-18:13, 6-17:2, 7-16:12, 7-17:13, 8-15:11, 8-16:6, 9-14:6, 9-15:3, 10-12:11, 10-14:7
QTY
3 1-21:10,1
12-10:11.
2-6-0 3-3-0 3-3-0 4-4-0 1 4-4-0 3-8-0 3-8-0 3-3-0 3-3-0 2-6-0
2-6-0 5-9-0 9-0-0 13-4-0 17-8=0 21-4-0 25-0-0 28-3-0 31-6-0 34-0-0
u nn 325US.D2073x10 325USJD073x10
D073 1 20 19 18 17 16
C4 K C8h
0
I90
0
15 14 13 AbuSM073x6
Cl K CB
K
60
2-0-0 3-3-0 -i 3-3-0 4-4-0 4-4-0 3-8-0 3-8-0 3-3-0 2-1-0 1-2-9 , 2-0-0 ,
2-0-0 5-9-0 9-0-0 13-4-0 17-8-0 21-4-0 25-0-0 28-3-0 30-4-0 32-0-0
2-6-0 31-6-0 34-0-0
2:13
9:6. 14-10:7. 15-8:11. 15-9:3. 16-7:12, 16-8:6, 17-5:14, 17-6:30, 17-7:13, 18-4:6, 18-5:13, 19-3:3, 19-4:11, 20-2:
= 246 Ibs
LOADING
(psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCLL
20.0
Code
TC 0.68
Vert(LL) 0.12 18-19 >999
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.81
Vert(TL) 0.10 18-19 >9
057 5401b 073 6561b
BCLL
0.0
WB 1.00
Horz(TL) -0.03 13
097 6621b
BCDL
10.0
(Matrix)
Min Length / LL d fle2'
STEEL SECTION III aFI+L-ORDPW-Ocenter
TOP CHORD 35 USD 035 50 TOPr -0-0 on center purlin spacing 1-4, 4-8, 8-11
BOT CHORD 55 USD IQ35 50 BOT bracing 1-11
WEBS 362 USWD 035 50 "Except'
W5 362 USWD 057 50, W7 362 USWD 057 50, W8 3 057
W9 60 SWD 035 50, W10 362 USWD 046 50, W1 2 U 057
W13 361 USWD 046 50
REACTIONS of/size/m�terial)21/1-0-0/CMU, 17/0-8-0/CMU, 12/1-0-0/ U, 13/0-8-0/CMU
Max Do v%1 21=2324(load case 5), 17=4697(load case 1), 12=1497(load case 6), 13=864(load case 3)
Max Uplid 21=-3831(load case 2), 17=-7491(load case 2), 12=-2655(load case 2), 13=-904(load case 2)
FORCES (lb) Max. Co pression Force
TOP CHORD 1-2=48 2-3=-1492, 3-4=-1682, 4-5=-994, 5-22=-143, 6-22=-143, 6-7=-143, 7-8=-798, 8-9=-1329, 9-10=-1095, 10-11=-677
BOT CHORD 1-21=-1 9, 20-21=-91, 19-20=-1367, 18-19=-1690, 17-18=-867, 16-17=-437, 15-16=-1219, 14-15=-881, 13-14=-205, 12-13=-205, 11-12=-211
WEBS 2-21=-2�20, 2-20=-2072, 3-20=-767, 3-19=-608, 4-19=-2823, 4-18=-758, 5-18=-3345, 5-17=-2218, 6-17=-362, 7-17=-1930, 7-16=-3076, 8-16=-828, 8-15=-2641,
9-15=-5I 8, 9-14=-839, 10-14=-1689, 10-12=-1745
NOTES
1) This truss has been designed for unbalanced loading conditions.
2) This truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 383.50 sq. ft., 0.6 DL applied. Design
Velocity Pressure, q = 42.94 psf.
3) For truss to truss co{nection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s).
4) Provide adequate d, inage to prevent water ponding.
5) Load case(s) 1, 2, 3 4, 5, 6 has been modified. Building designer must review loads to verify that they are correct for the intended
use of this truss.
6) Attach 5.5USGP x 1 " at location of tie-in trusses - See detail US2US-4B.1
7) Sl5ecial connections required at joints 19, 15,
8) Top chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE(S)
1) Live:
Uniform Loads (plf)
Vert: 1-2=-1 0.0, 2-3=-140.0, 3-4=-140.0, 4-5=-70.0, 5-22=-70.0, 6-22=-70.0, 6-7=-70.0, 7-8=-70.0, 8-9=-140.0, 9-10=-140.0
10-11=-14b.0, 1-21=-40.0, 20-21=-40.0, 19-20=-40.0, 18-19=-200.0, 17-18=-200.0, 16-17=-200.0, 15-16=-200.0,
14-15=-40.0' 13-14=-40.0, 12-13=-40.0, 11-12=-40.0
Co centrated Loads (lb)
Vert:19=-810 15=-810
2) Wird 1 C&C: II
Uniform Loads (plf
Vert: 1-2=-36 0, 2-3=-36.0, 3-4=-36.0, 4-5=-26.0, 5-22=-26.0, 6-22=-26.0, 6-7=-26.0, 7-8=-26.0, 8-9=-36.0, 9-10=-36.0,
10-11=-36.Of 1-21=-24.0, 20-21=-24.0, 19-20=-24.0, 18-19=-64.0, 17-18=-64.0, 16-17=-64.0, 15-16=-64.0, 14-15=-24.0,
13-14=-24.d1 12-13=-24.0, 11-12=-24.0
Normal: 1-2--202.7, 2-3=202.7, 3-4=202.7, 4-5=-50.6, 5-22=-50.6, 6-22=-50.6, 6-7=-50.6, 7-8=-50.6, 8-9=202.7, 9-10=202.7.
10-11=202.�, 1-21=312.6, 18-19=540.9, 17-18=540.9, 16-17=540.9, 15-16=540.9, 11-12=312.6
'ontinued or page 2
/.1 ti-3L s
Truss Type �Qty Ply Truss
ROOF TRUSS 2 1 D2G
Tue Apr 29 15:46:51 2008
LOAD CASE(S)
Concentrated Loa
Vert: 19
3) Wind 2 C&C:
Uniform Loads (pl
Vert: 1-2=
18-19=-1C
i Normal:1
17-18=44.
Concentrated Loa
X Vert:19=-
4) Dead:
Uniform Loads (pl
Vert: 1-2=
19-20=-4C
Vert: 1 E
5) 1st unbalanced
Uniform Loads
Vert: 1-
19-20=.
Vert: 19=-
6) 2, d unbalanced L
Uniform Loads (pl
Vert: 1-2=
19-20=-4(
Concentrated Loa
Vert:19=-
(lb)
915=2209
5.0, 2-3=-36.0, 3-4=-36.0, 4-5=-6.0, 5-22=-6.0, 6-22=-6.0, 6-7=-6.0, 7-8=-6.0, 5-9=-36.0, 9-10=-36.0, 10-1 1=-36.0,1-21=-24.0, 20-21=-24.0, 19-20=-24.0,
0, 17-18=-104.0, 16-17=-104.0, 15-16=-104.0, 14-15=-24.0, 13-14=-24.0, 12-13=-24.0, 11-12=-24.0
=-168.3, 2-3=-168.3, 3-4=-168.3, 4-5=-87.6, 5-22=-87.6, 6-22=-87.6, 6-7=-87.6, 7-8=-87.6, 8-9=-168.3, 9-10=-168.3, 10-11=-168.3, 1-21=374.5, 18-19=44.7,
16-17=44.7, 15-16=44.7, 11-12=374.5
(lb)
9 15=-249
.0, 2-3=-60.0, 3-4=-60.0, 4-5=-30.0, 5-22=-30.0, 6-22=-30.0, 6-7=-30.0, 7-8=-30.0, 8-9=-60.0, 9-10=-60.0, 10-11=-60.0, 1-21=40.0, 20-21=-40.0,
18-19=-120.0, 17-18=-120.0, 16-17=-120.0, 15-16=-120.0, 14-15=40.0, 13-14=-40.0, 12-13=-40.0, 11-12=-40.0
(lb)
) 15=-450
40.0. 2-3=-140.0, 3-4=-140.0, 4-5=-70.0, 5-22=-70.0, 6-22=-70.0, 6-7=-70.0, 7-8=-70.0, 8-9=-60.0, 9-10=-60.0, 10-11=-60.0, 1-21=-40.0, 20-21=-40.0,
18-19=-200.0, 17-18=-200.0, 16-17=-200.0, 15-16=-200.0, 14-15=-40.0, 13-14=-40.0, 12-13=-40.0, 11-12=-40.0
(lb)
0 15=-810
60.0, 2-3=-60.0, 3-4=-60.0, 4-5=-70.0, 5-22=-70.0, 6-22=-70.0, 6-7=-70.0, 7-8=-70.0, 8-9=-140.0, 9-10=-140.0, 10-11=-140.0, 1-21=-40.0, 20-21=-40.0,
0, 18-19=-200.0, 17-18=-200.0, 16-17=-200.0, 15-16=-200.0, 14-15=-40.0, 13-14=-40.0, 12-13=-40.0,11-12=40.0
Is (lb)
60 15=-810
i rr. Y0.�_ '� •i.
M
y.
•r�
071
Oaks Commercial Center ,
i russ i ype ��9
ry rry uss
ROOF TRUSS 1 EA
s Sea 25 2007 Aegis Metal Framing, LLC
QTY (Total = ! ). All Screws Are #12-14 T/3
i 1-8:2, 4-6:2,I6-4:4, 8-1:2
1-7:4, 2-7:4, b-6:5, 3-7:4
1:1I a
SCREW CITY
WEBS 6-3:5, 7-1:4
2-4-0 3-11-3 4-2-1:3
2-4-0 6-3-3 10-6-0
2-0-0 2-4-0 10-5-2
LOADING (psf) SPACING 4-0-0
TCLL 20.0 Code
TCDL 15.0 FBC/AISI
BCLL 0.0
BCDL 10.0
STEEL SECTION
TOP CHORD 35 USD 35 50 'Except'
W1 362 ! SWD 035 50, W6 362 USWD 035 50
BUT CHORD 35 USD 35 50
WEBS 362 USVVD 035 50
CSI
DEFL (in)
(loc) I/deft
TC 0.79
Vert(LL) -0.03
6-7 >999
BC 0.43
Vert(TL) -0.11
6-7 >906
WB 0.18
Horz(TL) -0.01
6 n/a
(Matrix)
Min Length / LL defl = 240
BRACING
TOP CHORD
Sheathed
BOT CHORD
4c1r:
4
iu-0-0
Truss weight = 42 Ibs
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 §A01b 073 6561b
*Durli
acinq 1-5
REACTIONS QUsize/m&erial)6/0-4-0/USKW, 7/0-8-0/CMU
Max Dow 6=802(load case 3), 7=1161(load case 1)
Max Upli 6=-949(load case 2), 7=-1905(load case 2)
FORCES (lb) Max. Coni ression Force
TOP CHORD 1-8=-45 �1-2=-950, 2-3=-800, 3-4=-201, 4-5=-8, 4-6=-247
BOT CHORD 7-8=0, 6�7=-890
WEBS 1-7=-15, 7=-484, 3-7=-569, 3-6=-857
NOTES
1) This truss designed ith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , K il = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 43.99 sq. ft., 0.6 DL applied. The Left End
Vertical and Right Er Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load appliq"d to this truss resulting from the standard wind load, equal to 1038 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached tc}; truss at Joint 6 with 4 410 sds. Refer to Aegis detail US2US-1.
4) Top chord load appli d at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stand rd
Job I St.Lucie Oaks Commercial Center Truss Type Oty Ply Truss
0710017 ROOF TRUSS 10 1 1 ED
s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:27:23 2008 Page 1
QTY (Total =149 ). All Screws Are #12-14 T/3
i 1-8:2, 4-6:� 6-4:6, 8-1:2
1-7:4, 2-7: 3-6:5, 3-7:4
ob
a
3-4-0 2-8-3 2-11-13_
3-4-0 6-0-3 9-0-0
8 7 C2K 6
2-0-0 1-4-0 , 5-7-2 0-9 14
2-0-0 3-4-0 B-11-2 9-0-0 .
iZK
SCR�W
WEBS
CITY
6-3:5, 7-1::
[.1 7-2:7, 7-3:4 Truss weight=45 Ibs
LOADING
(psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCLL
20.0
Code
TC 0.58
Vert(LL) 0.05 7-8 >999
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.55
Vert(TL) 0.05 7-8 >999
057 5401b 073 6561b
BCLL
0.0
WB 0.26
Horz(TL) 0.00 6 n/a
097 6621b
BCDL
10.0
(Matrix)
Min Length / LL deft = 240
#
STEEL
SECTION
BRACING
TOP CHORD
35 USD
35 50 *Except* TOP CHORD She t e o 0MontEr purlin spacing 1-5
W1 362
USWD 035 50, W6 362 USWD 035 50 BOT CHORD 4- - on r
BOT CHORD 35 USD I035 50
WEBS 362 USIVD 035 50
REACTIONS attsize/m;llterial)6/0-4-0/USKW, 7/2-0-0/CMU
Max Dow 6=1384(load case 3), 7=1230(load case 1)
Max Upli III 6=-742(load case 2), 7=-1578(load case 2)
FORCES (lb) Max. Corj1,pression Force
TOP CHORD 1-8=-50 , 1-2=-954, 2-3=-835, 3-4=-229, 4-5=-11, 4-6=-
BOT CHORD 7-8=-0,-7=-327
WEBS 1-7=-25i, 2-7=-914, 3-7=-564, 3-6=-1149
NOTES
1) This truss designed , ith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 42.11 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load appli d to this truss resulting from the standard wind load, equal to 1257 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shal be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached toi truss at Joint 6 with 4 -#10 sds. Refer to Aegis detail US2US-1.
4) Top chord load appli d at 0-0-0 oc via valley trusses above.
LOAD CASE(b) Standard
0710017
7.16-32 s
ROOF TRUSS 14 11 1 EJB
1
QTY (To93 ). All Screws Are #12-14 T/3
i 1-13:2,.�,� 8:2, 8-6:7, 13-1:2
1-12:4, 6-11:7, 2-12:7, 3-10:2, 3-11:3, 4-9:4, 4-10:2, 5-8:7, 5-9:3
I1, 2-6-0 3-11-15 3-11-15 3-11-15 4-3-8
2-6-0 6-5-15 10-5-13 14-5-12 18-9-4
fl
cb
o�
o
I
SCREW CITY
13 1 C 3K 11 10 a 8 7Z k
2-0-0 9-6-p 3-11-15 3-11-15 3-11-15 4-2-10 0-gr14
2-0-0 2-6-0 6-5-15 10-5-13 14-5-12 18-8-6 18-9-4
10-3:2, 10-4:2, 11-2:7, 11-3:3, 12-1:4, 12-2:9 Truss
LOADING
(psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCI11-
20.0
Code
TC 0.74
Vert(LL) 0.07 10-11 >999
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.48
Vert(TL) -0.06 10-11 >999
057 5401b 073 6561b
BCLL
0.0
WB 0.67
Horz(TL) -0.03 8 n/a
097 6621b
BCDL
10.0
(Matrix)
Min Length / LL deft = 240
#
STEEL
SECTION al
BRACING
TOP
CHORD 35 USQ
035 50 *Except* TOP CHORD Sheathjoe me urlin spacing 1-7
W1 3
2 USWD 035 50, W11 362 USWD 035 50 BOT CHORD 4-0-0 o3-8
BOT
CHORD 35 US
035 50
WEBS
362 U
WD 035 50
REACTIONS Qt/size/I aterial)8/0-4-0/USKW, 12/1-0-0/CMU do
Max D' ivn 8=1438(load case 1), 12=1898(load case 1)
Max Ut I ift 8=-1633(load case 2), 12=-2266(load case 2)
FO CES (lb) Max. C mpression Force
TOP CHORD 1-13=1 13, 1-2=-844, 2-3=-1664, 3-14=-1520, 4-14=-14'2 4- 927, 6=-181, 6-7=-8, 6-8=-251
BOT CHORD 12-13; i 0, 11-12=-730, 10-11=-1837,'9-10=-1527, 8-9=-910
WEBS 1-12=! 39, 2-12=-1670, 2-11=-1165, 3-11=-404, 3-10=-511, 4-10=-151, 4-9=-887, 5-9=-547, 5-8=-1364
1) This truss designe
Building, I = 1.00 ,
Vertical and Right
2) Horizontal load ap
design of which sF
3) 35USKW attachec
4) TI p chord load ap
LOAD CASE(S) Stai
I '
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 131.07 sq. ft., 0.6 DL applied. The Left End
nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
ad to this truss resulting from the standard wind load, equal to 1595 lbs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
D truss at Joint 8 with 7 410 sds. Refer to Aegis detail US2US-1.
ied at 0-0-0 oc via valley trusses above.
071001
Truss Type Oty Ply Tru
ROOF TRUSS 6 1 EK
s Sep 25 2007 Aegis Metal Framing, LL
QTY (Total = 4). All Screws Are #12-14 T/3
i 1-8:2, 4-6:2, 6-4:4, 8-1:2
1-7:5, 2-7:4, 3-6:3, 3-7:4
it 2-6-0 2-7-3 2-10-13
2-6-0 5-1-3 8-0-0
oI0
s
2-0-0 0-6-00 5-5-2 0-Q71g
2-0-0 2-6-0 7-11-2 8-0-0
w
0
0
t2K
SCREW
WEBS
CITY
6-3:3, 7-1:5
-2:8, 7-3:4 Truss weight = 33 Ibs
LOADI
4G (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/defl
SCREW VALUE. (#12-14 T/3)
TCLL
20.0
Code
TC 0.54
Vert(LL) 0.02 7-8 >999
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.35
Vert(TL) -0.03 6-7 >999
057 5401b 073 6561b
BCLL
0.0
WB 0.13
Horz(TL) 0.00 6 n/a
097 6621b
BCDL
10.0
(Matrix)
Min Length / LL deft = 240
#
STEEL SECTION BRACING
TOP CAI-IORD 35 USD 035 50 *Except* TOP CHORD Sheathed 1-5
1 W1 362 I11SWD 035 50, W6 362 USWD 035 50 BOT CHORD 4-0-0 on to I - 8-6
BOT CHORD 35 USD 035 50
WEBS 362 US 035 50
REACTIONS at/size/material)6/0-4-0/USKW, 7/1-0-0/CMU
Max Dow 6=655(load case 3), 7=991(load case 1)
Max Uplift 6=-552(load case 2), 7=-1920(load case 2)
FORCES (lb) Max. Compression Force
TOP CHORD 1-8=-429!I1-2=-1050, 2-3=-734, 3-4=-142, 4-5=-8, 4-6=-179
BOT CHORD 7-8=0, 6- =-371
WEBSI 1-7=-212 I2-7=-404, 3-7=-495, 3-6=-643
1) This truss designed
Building, I = 1.00 , 1,
Vertical and Right E
2) Horizontal load appl
design of which she
3) 35USKW attached 1
4) Toplchord load appl
LOAD iCASE(S) Stanc
s
h ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 33.31 sq. ft., 0.6 DL applied. The Left End
Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
to this truss resulting from the standard wind load, equal to 817 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
-uss at Joint 6 with 4 -#10 sds. Refer to Aegis detail US2US-1.
at 0-0-0 cc via valley trusses above.
071001
Truss Type I Qty I rly I I russ
ROOF TRUSS 11 11 1 EKGE
s
1 2008
r
-F
QTY (Total = 26). All Screws Are #12-14 T/3
i 2-3:3, 6-8:2, 8-6:2
3-11:2, 4-1 0�, 5-9:3
QTY
i 2-11:2
9-5:3. 1
2-0-0 2-0-0 2-0-0 2-0-0
2-0-0 4-0-0 6-0-0 8-0-0
4.50 F12
VSD 036 W OCIr
r
rASWJ W MA
(:)*lZ1SL
xeeus 4'.
11-3:2
11 10 9 8
325USJD073x10
6" 275USHDO57
w i4412-1z jd3 2-0-0 2-0-0 2-0-0
2-0-0 4-0-0 6-0-0 8-0-0
= 28 Ibs
LOADING
(psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCLLI
20.0
Code
TC 0.24
Vert(LL) n/a n/a
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.02
Vert(TL) n/a n/a
057 5401b 073 6561b
BCLLI
0.0
WB 0.07
Horz(TL) 0.00 n/a
097 6621b
BCDL
I
10.0
(Matrix)
Min Length / LL defl = 999
#
STEEL SECTION
TOP bHORD 35 USJ 035 50 "Except"
W4 364 USWD 035 50
BOT CHORD 35 USD 035 50
WEBS 362 USWD 035 50
Max
Max
FORCES (lb) Max. Ci
TORCHORD 1-2=-1
BOTiCHORD 2-11=-
WEBS 4-10=-
NOTES
1) This truss designe(
Building, I = 1.00 ,
Vertical is not expc
2) Hbrizontal load apf
design of which sK
3) Gable requires con
4) Gable studs space
5) For studs exposed)
6) Top chord load app
LOAD CASE(S) Starj
BRACING
TOP CHORD Sheathed 1-7
BOT CHORD 4-0-0 on-o to racing 2-8
aterial)1/8-0-0/UKN, 8/8-0-0/UKN, 2/8-0-0/UKN, 10/8-0-0/UKN, 11/8-0-CPJKN /8-0-0/ �
rn 1=34(load case 1), 8=151(load case 1), 2=172(load case 1), (lo case , 1 -317(load case 1), 9=372(load case 1)
1=-11(load case 2), 8=-174(load case 2), 10=-529(load case , 11=-44 N se 2), 9=-529(load case 2)
%-190
fzontal 1=8(load case 1), 2=-10(load case 1), 11=2(load 1)
npression Force 11�2-3=-735, 3-4=-548, 4-5=-320, 5-6=-92,jjj;;j 12
10-11=0, 9-10=0, 8-9=-1
05, 3-11=-257, 5-9=-306
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
i = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 33.74 sq. ft., 0.6 DL applied. The Right End
ed to Wind. Design Velocity Pressure, qh = 42.94 psf.
ed to this truss resulting from the standard wind load, equal to 785 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the.Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
nuous bottom chord bearing.
at 2-0-0 on center.
D wind, see Aegis Metal Framing "Standard Gable End Detail"
ed at 0-0-0 oc via valley trusses above.
10710017
Truss Type �Qty Ply Truss
ROOF TRUSS 4 1 EL
S
28
WEBS
QTY (Total = 541). All Screws Are #12-14 T13
i 1-9:2, 4-6:2, 4:4, 9-1:2
1-8:5, 2-7:3, C�8:6, 3-6:4, 3-7:2
3-0-0 3-2-11 a-O-°
3-0-0 6-2-11 9-9-0
C?
00
co
O
I
9 8 7 6
2-0-0 1-0-0 3-2-11 3-5-7 0-QT14
2-0-0 3-0-0 6-2-11 9-8-2 9-9-0
QTY
6-3:4, 7-2:317-3:2, 8-1:5, 8-2:9
3K
LOADNG (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/defl
TCLL 20.0 Code TC 0.64 Vert(LL) 0.04 8-9 >999
TCDL 16.0 FBC/AISI BC 0.43 Vert(TL) 0.03 8-9 >999
BCLL 0.0 WB 0.17 Horz(TL) 0.01 6 n/a
BCDL 10.0 (Matrix) Min Length / ILL defl = 240 if
STEEL SECTION BRACING
TOP CHORD 35 USD 035 50 'Except' TOP C eathed
W1 3621USWD 035 50, W7 362 USWD 035 50 BOT ORD 4 0 on me
BOT CHORD 35 USD �035 50
WEBS 362 US D 035 50
REACTIONS Qt/size/m terial)6/0-4-0/USKW, 8/2-0-0/CMU
Max Down 6=808(load case 3), 8=1212(load case 1
Max Uplift' 6=-717(load case 2), 8=-2234(load case
FORCES (lb) Max. Co�pression Force
TOP CHORD 1-9=-47,, 1-2=-1177, 2-3=-509, 3-4=-187, 4-5=-9, 4-6=-213
BOT CHORD 8-9=-1, f1-8=-314, 6-7=-398
WEBS 1-8=-31 , 2-8=-1001, 2-7=-605, 3-7=-165, 3-6=-875
T 21F,
Truss weight = 4
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b
on center purlin spacing 1-5
icing 9-6
1) This truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , I42 = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRcof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 41.34 sq. ft., 0.6 DL applied. The Left End
Vertical and Right Ed Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load appIll d to this truss resulting from the standard wind load, equal to 1076 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which sha I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections
3) 35USKW attached 1;o truss at Joint 6 with 4 410 sds. Refer to Aegis detail US2US-1.
4) Top chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Standard
r
is
0710017
Truss Type Qty Ply Truss
ROOF TRUSS 2 1 EL1
s SeD 25 2007 Aegis Metal Framing, LLC Mon Apr 28 1
QTY (Total t 45 ). All Screws Are #12-14 T/3
i 1-7:2, 3-5 2, 5-3:4, 7-1:2
1-6:5, 2-$4, 2-6:7
rh
ch
0
ao
a
2-0-0
3-0-0 3-5-0
3-0-0 6-5-0
2-0-0 3-0-0 6-4-2 6-5-0
SCREW QTY
WEBS 5-2:4, 6)5, 6-2:10 Truss weight = 26 Ibs
LOA6ING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/defl SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.81 Vert(LL) 0.04 6-7 >999 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.43 Vert(TL) 0.04 6-7 >999 540lb 073 6561b
BCLL 0.0 WB 0.19 Horz(TL) 0.00 5 n/a 0 6621b
BCD IL 10.0 (Matrix) Min Length / LL deft = 240 #
i
STEEL SECTION BRACING
TOP' CHORD 35 USD 035 50 *Except* TOP CHORD ea h 1-4
W1 360 USWD 035 50, W5 362 USWD 035 50 BOT CHORD -0- o enter r ci 7-5
BO 1 CHORD 35 USD 035 50
WEBS 362 USWD 035 50
REAICTIONS Gt/size/ I' aterial)5/0-4-0/USKW, 6/2-0-0/CMU
Max Do N n 5=714(load case 3), 6=1028(load case 1)
Max Upjft 5=-6(load case 2), 6=-2343(load case 2)
FORCES (lb) Max. C mpression Force
TOP j CHORD 1-7=-4 5, 1-2=-1181, 2-3=-179, 3-4=-9, 3-5=-209
BOTI CHORD 6-7=-1 5-6=-297
WEBS 1-6=-311, 2-6=-816, 2-5=-884
NOTES
1) This truss designe, with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
B � ilding, I = 1.00 , il = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 26.90 sq. ft., 0.6 DL applied. The Left End
Vortical and Right I_.nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load applied to this truss resulting from the standard wind load, equal to 742 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which sh II be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 3 , USKW attached (o truss at Joint 5 with 4 -#10 sds. Refer to Aegis detail US2US-1.
4) Top chord load ap ied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stan lard
I- i
0710017
Truss Type Oty Ply Truss
ROOF TRUSS 2 1 EL2
16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon
E
QTY (Total l 47). All Screws Are #12-14 T/3
i 1-B:2, 4-62, 6-4:4, 8-1:2
1-7:5, 2-7!,;4, 3-6:3, 3-7:4
M
O
A
3-0-0 2-2-11 2-6-5
3-0-0 5-2-11 7-9-0
to
O
N
5O
�O
0 0
0 ®
o
0
a
8
7
6
2-0-0
1-0-0
4-8-2
01114
2-0-0
3-0-0
7-8-2
7-9-0
SC
SC4WQTY
EW QTY
WEBS
6-3:3, 7-
1 5, 7-2:9, 7-3:4
Truss weight = 33 Ibs
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc)
I/deft S REW VALUE. (#12-14 T/3)
TCLL 20.0
Code
TC
0.64
Vert(LL) 0.04 7-8
>999 2561b 046 4501b
TCDL 15.0
FBC/AISI
BC
0.47
Vert(TL) 0.04 7-8
>999 7 5401b 073 6561b
BCLL 0.0
WB
0.16
Horz(TL) 0.00 6
1 7 6621b
BCDL 10.0
(Matrix)
Min Length / LL deft = 24
#
STEEL SECTION
BRACING
TOP CHORD 35 US
^ 035 50 *Except*
he
TO CHORr4-O-OCQh
W1 36�
USWD 035 50, W6 362 USWD 035 50
CHOR
cen er bracing 8-6
U
2)
3
4)
CHORD 35 US 035 50
S 362 UJWD 035 50
'TIONS attsize//naterial)6/0-4-0/USKW, 7/2-0-0/CMU
Max Down 6=722(load case 3), 7=1081(load case 1)
Max Upljft 6=-353(load case 2), 7=-2243(load case 2)
:ES (lb) Max. Cy Impression Force
CHORD 1-8=-4 7, 1-2=-1271, 2-3=-884, 3-4=-141, 4-5=-9, 4-6=-162
CHORD 7-8=-016-7=-140
S 1-7=-3 8, 2-7=-437, 3-7=-527, 3-6=-659
s truss designe , with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Iding, I = 1.00 , rz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 32.68 sq. ft., 0.6 DL applied. The Left End
tical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
-izontal load applied to this truss resulting from the standard wind load, equal to 878 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
;ign of which sh II be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
1SKW attached o truss at Joint 6 with 4 -#10 sds. Refer to Aegis detail US2US-1.
chord -load applied at 0-0-0 oc via valley trusses above.
CASE(S) Standard
07100.17
E
ROOF TRUSS 16 11 1 EM
QTY (Total i i 34). All Screws Are #12-14 T/3
i 1-7:2, 3-5:& 5-3:4, 7-1:2
1-6:3, 2-5:;b, 2-6:3
.0
0
2-6-0 4-0-8
2-6-0 6-6-8
Ui
O
C!n
7 6
5
2-0-0 ,0-6-0,
3-11-10
0-oT14
SCREW
CITY
2-6-0
C2K' LZK
6-5-10
6-6-8
WEBS
5-2:5, 6-1:1,
6-2:5
Truss weight = 30 Ibs
LOADING
(psf)
SPACING
4-0-0
CSI
DEFL (in) (loc)
I/defl
SCREW VALUE. (#12-14 T/3)
TCLL
20.0
Code
TC 0.74
Vert(LL) 0.02 6-7
>999
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.29
Vert(TL) 0.02 6-7
>999
057 5401b 073 6561b
BCLL
0.0
WB 0.20
Horz(TL) 0.00 5
n/
097 6621b
BCDL
10.0
(Matrix)
Min Length / LL deft =
#
STEEL
SECTION
BRACIN
TOP CHORD 35 US 035 50 'Except' p
W1 36 USWD 035 50, W5 362 USWD 035 50 BOT
BOT CHORD 35 USE,035 50
WETS 362 US D 035 50
REACTIONS Qt/size/ .I terial)5/0-4-0/USKW, 6/1-0-0/CMU
Max Do n 5=1035(load case 3), 6=896(load case 1)
Max Upl It
5=-553(load case 2), 6=-1167(load case 2)
FORCES (lb) Max. Co, pression Force
TOP ICHORD 1-7=-370, 1-2=-570, 2-3=-311, 3-4=-11, 3-5=-458
BOT CHORD 6-7=-0,1-6=-348
WEBS 1-6=-11,'4, 2-6=-704, 2-5=-1065
2)
4)
bracing 7-5
its truss designedliiroith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
idding, I = 1.00 , {Ifni = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 30.29 sq. ft., 0.6 DL applied. The Left End
rtical and Right Old Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
irizontal load applied to this truss resulting from the standard wind load, equal to 923 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
sign of which sh y' be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
;USKW attached 0 truss at Joint 5 with 4 410 sds. Refer to Aegis detail US2US-1.
,p chord loadapp ied at 0-0-0 oc via valley trusses above.
D CASE(S) Standard
I
i
Job St.Lucie Oaks Commercial Center Truss Type Qty Ply Truss
0710 17 j ROOF TRUSS 4 1 EN
Tke 7.16-32 s Sao 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:27:28 2008 Page 1
CITY (Total I= 32 ). All Screws Are #12-14 T/3
i 1-7:2, 3- i2, 5-3:4, 7-1:2
1-6:2, 245, 2-6:3
'ch
ob
a
2-4-0 4-2-8 J
2-4-0 6-6-B
CP
O
CT
SCREW QTY
WEBS 5-2:5, 6-
2-0-0 9-4-9
2-4-0
I2, 6-2:5 Y, �2K
4-1-10
6-5-10
0-q,14
6-6-8
Truss weight =29lbs
LO, DING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc)
I/deft
SCREW VALUE. (#12-14 T/3)
TCLL 20.0
Code
TC 0.78
Vert(LL) 0.02 6-7
>999
035 2561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.25
Vert(TL) 0.02 6-7
>999
057 5401b 073 6561b
BCLL 0.0
WB 0.21
Horz(TL) 0.00 5
n/a
097 6621b
BCDL 10.0
(Matrix)
Min Length / LL deft = 240
#
STEEL SECTION I
BRACING
TOP CHORD 35 US ^ 035 50 *Except*
TOP CHORD Sh
-
W1 36� USWD 035 50, W5 362 USWD 035 50
BOT CHORD 4 on
t racing 5
BOT CHORD 35 USD 035 50
WEBS 362 U§WD 035 50
ICTIONS
RE at/size/ aterial)5/0-4-0/USKW, 6/0-8-0/CMU
Max Dc n 5=1017(load case 3), 6=859(load case 1
Max Up�ift 5=-600(load case 2), 6=-1067(Ioad ca
i
FORCES (lb) Max. C Impression Force
TOP CHORD 1-7=-316, 1-2=-500, 2-3=-327, 3-4=-11, 3-5=-480
BOT CHORD 5-7=-0 5-6=-428
WEBS 1-6=-7 , 2-6=-670, 2-5=-1071
2)
4)
s truss designed„ with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
[ding, I = 1.00 , �z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 30.29 sq. ft., 0.6 DL applied. The Left End
:tical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
rizontal load applied to this truss resulting from the standard wind load, equal to 923 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
•ign of which shell be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
JSKW attached o truss at Joint 5 with 4 -#10 sds. Refer to Aegis detail US2US-1.
chord load ap ,lied at 0-0-0 oc via valley trusses above.
I CASE(S) Standard
Job
0710017
s
ROOF TRUSS 12 11 I EN1
CITY (rota'
i 1-5:2, 2-
1-4:3
QTY
= 17 ). All Screws Are #12-14 T/3
:3, 4-2:4, 5-1:2
4-5-12
O
N
L I 4-4-14 0-Q 14
4-4-14 4-5-12
T
O
CTI
?z K
Wtt3S
4-1::i
Truss weight = 21 Ibs
LOADING
LI
(psf)
SPACING 4-0-0
CSI
DEFL
(in)
(loc) I/de
SCREW VALUE. (#12-14 T/3)
TC
L 20.0
Code
TC 0.97
Vert(LL)
0.00
>9
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.20
Vert(TL)
-0.01
057 5401b 073 6561b
BCLL
0.0
I
WB 0.10
Horz(TL)
-0:0
4
097 6621b
BCDL
10.0
(Matrix)
Min Leng
a
240
#
i
STEEL SECTION
TO CHORD 35 USD
035 50 *Except
CH
�CI
eathed 1-3
I W1 3
2 USWD 035 50, W3 362 USWD 035 50
CHORD 4-0-0
on center bracing 5-4
BOT CHORD 35 US,
035 50
\VtP
WEBS 362 U
WD 035 50
REACTIONS at/size/Ipatedal)5/0-7-4/LGF,
4/0-4-0/USKW
Max Dc�
n 5=369(load case 1), 4=889(load case 3)
Max Uq�ft
4=-827(load case 2)
II
FORCES (lb) Max. Compression
Force
TOP CHORD 1-5=-2871
1-2=-404, 2-3=-11. 2-4=-612
1.
BOT CHORD 4-5=-6.19
1) This truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , f Cz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 20.40 sq. ft., 0.6 DL applied. The Left End
Vertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load ap lied to this truss resulting from the standard wind load, equal to 618 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached Ito truss at Joint 4 with 4 -#10 sds. Refer to Aegis detail US2US-1.
4) Top chord load apF� ied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stan and
i
071001
Tr�TRUSS
Qty Ply Truss
RO4 1 ER
s
Mon
QTY (Total = 0,3 ). All Screws Are #12-14 T/3
i 1-9:2, 4-6:2 6-4:4, 9-1:2
1-8:5, 2-7:3 2-8:6, 3-6:4, 3-7:2
3-0-0 3-2-11 3-6-5
3-0-0 6-2-11 9-9-0
CITY
2-0-0 3-0-0 6-2-11 9-8-2
9-9-0
9D
N
TzK
WEBS 6-3:4, 7-2:3, 7-3:2, 8-1:5, 8-2:9
Truss weignt = 43 ins .
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in)
(loc)
I/defl
SCREW VALUE. (#12-14 T/3)
TCLLI 20.0
Code
TC 0.64
Vert(LL) 0.04
8-9
>999
035 2561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.43
Vert(TL) 0.03
8-9
>999
051 5401b 073 6561b
BCLL 0.0
WB 0.17
Horz(TL) 0.01
6
n/a
0j 6621b
BCDL 10.0
(Matrix)
Min Length / LL deft = 240
Illilk
#
STEEL SECTION
BRACING
TOP CHORD 35 US 035 50 *Except*
TOP CHORD
heathe
or 2-0-
nter p in spacing 1-5
W1 361 USWD 035 50, W7 362 USWD 035 50
BOT CHORD
- on
nter b i
9-6
BOT CHORD 35 USD 035 50
WEBIS 362 USI(D 035 50
1100
REACTIONS Qt/size/Ilaterial)6/0-4-0/USKW, 8/2-0-0/LGF
Max Do n 6=808(load case 3), 8=1212(load case 1)
Max Up
l 6=-717(load case 2), 8=-2234(load case 2)
FORCES (lb) Max. Co
pression Force
TOP CHORD 1-9=-4 4, 1-2=-1177, 2-3=-509, 3-4=-187, 4-5=-9, 4-6=-213
BOT CHORD 8-9=-1,
7-8=-314, 6-7=-398
WEBS 1-8=-3
B, 2-8=-1001, 2-7=-605, 3-7=-165, 3-6=-875
1) is truss designecl,,With ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 41.34 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wihd. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load applied to this truss resulting from the standard wind load, equal to 1076 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which sha I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached o truss at Joint 6 with 4 -#10 sds. Refer to Aegis detail US2US-1.
4) Top chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stan lard
I
,^ I
i
I
07100
ROOF TRUSS 1 2 1 FGB
s Sep 25 2007 Aegis Metal Framing, LLC
Apr 28
QTY (Total = � 94 ). All Screws Are #12-14 T/3
i 1-10:15, 5- '15, 6-5:15, 10-1:15
1-9:14, 2-9: 0, 3-7:5, 3-8;2, 3-9:5, 4-7:10, 5-7:14
4-4-1 4-0-3 4-0-3 4-4-1
4-4-1 8-4-4 12-4-7 16-8-8
O
O
:i
1 11 7
r� r .�
r .
r .!• r�if
SEE LA your MRv
Fp2 CugSr�t
4-4-1 4-0-3 4-0-3 , 4-4-1 ,
4-4-1 8-4-4 12-4-7 16-8-8
C$K
SCREW
WEBS
QTY
7-3:5, 7-4:
IAI*IL-t1v .
0, 7-5:14, 8-3:2, 9-1:14, 9-2:10, 9-3:5
Truss weight= 322 Ibs
LOADING
(pso
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCLIJ
20.0
Code
TC 0.95
Vert(LL) 0.15 8 >999
035 2561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.40
Vert(TL) 0.12 8 >999
057 5401b 073 6561b
BCLL
0.0
WB 0.95
Horz(TL) -0.02 6 n/a
OW 6621b
BCDL
10.0
(Matrix)
Min Length / LL defl = 240
#
STEEL SECTION
BRACING
TOP 55 US 035 50 *Except*
TOP CHORD eath or 2- center lin spacing 1-5
(CHORD
W1 60 P1SWD 035 50, W9 60 USWD 035 50
BOT CHOR -0- o enter r c 10-6
BOT CHORD 55 USDI035 50
(2)600 33 -10 Attach to both web flanges of both plies, full
WEBS 362 USiWD 035 50 *Except*
length, w/10412-14 at 12" oc
W4 36 USWD 046 50, W6 362 USWD 046 50, W7 362 US
CSJ 20ga 33 5-6 Attach to both web flanges of both plies, full
length, w/11412-14 at 12" oc
(2)600 CSJ 20ga 33 1-9 Attach to both web flanges of both plies, full
length, w/14412-14 at 12" oc
(2)600 CSJ 20ga 33 2-9 Attach to both web flanges of both plies, full
length, w/6-#12-14 at 12" oc
(2)600 CSJ 20ga 33 5-7 Attach to both web flanges of both plies, full
length, w/14412-14 at 12" oc
REACTIONS at/size/ aterial)10/0-3-10/LGF, 6/0-114/CMU
Max DO 'n 10=5231(load case 1), 6=5380(load case 1)
Max Up1lIift 10=-7393(load case 2), 6=-7716(load case 2)
FORCES (lb) Max. CJllnpression Force
TOP CHORD 1-10=-$,089, 1-11=-1986, 2-11=-1986, 2-12=-1986, 3-12=-1986, 3-13=-1973,
4-13=-1973, 4-14=-1973, 14-15=-1973, 5-15=-1973, 5-6=-5238
BOT CHORD 9-10=- 77, 8-9=-3471, 7-8=-3471, 6-7=-877
WEBS 1-9=-664, 2-9=-2985, 3-9=-1673, 3-8=-178, 3-7=-1707, 4-7=-2924,
5-7=-6944
1) 2-'ply truss to be co, nected together with #10-16 screws as follows: Top chords connected with 1 row at 12 inches on center.
Bottom chords con gected with 1 row at 12 inches on center.
2) This truss designed1with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h =
33.8 ft., Exposure ategory C, Enclosed Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance =
7.9g ft. using a toq,,chord tributary area of 41.34 sq. ft., 0.6 DL applied. The Left End Vertical and Right End Vertical are exposed
to' Wind. Design Velocity Pressure, qh = 42.94 psf.
3) For truss to truss nnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required
for other type load( �). Design of connection(s) is delegated to the building designer.
4) For truss to truss nnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required
for -other type load'.). Design of connection(s) is delegated to the building designer. Special connection(s) required to support
concentrated load() at joint(s) 2, .
5) Provide adequate rainage to prevent water ponding.
6) Load case(s) 1, 2, 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of
this truss.
71 A{tach 5.5USGP x 12" at location of tie-in trusses - See detail US2US-4B.1
8) Top chord load ap ied at 0-0-0 oc via valley trusses above.
LOAD CASE(S)
1) Live:
Uniform Loads (02 Vert: 1-11-1 140.0, 2-11=-140.0, 2-12=-140.0, 3-12=-140.0, 3-13=-140.0, 4-13=-140.0, 4-14=-140.0, 14-15=-140.0,
5-15=-140 10, 9-10=-40.0, 8-9=-40.0, 7-8=-40.0, 6-7=-40.0
:ontipued on page 2
Truss Type Qty
Ply Trus
ROOF TRUSS 2 FGB
16-32 s Sep 25 2007 Aegis Metal Framing,
Page 2
:ntrated Loads (lb)
Vert: 2=-251 11=-243 12=-1871 13=-2512 14=-243 15=-314
1 C&C:
m Loads (pIq
Vert: 1-11=- ti.0, 2-11=-36.0, 2-12=-36.0, 3-12=-36.0, 3-13=-36.0, 4-13=-36.0, 4-14=-36.0, 14-15=-36.0, 5-15=-36.0, 9-10=-24.0, 8-9=-24.0, 7-8=-24.0,
6-7=-24.0
Normal: 1-1 226.8. 2-11=226.8, 2-12=226.8, 3-12=365.2, 3-137226.8, 4-13=226.8, 4-14=226.8, 14-15=226.8. 5-15=226.8
Parallel: 1-10i 202.3, 5-6=-202.3
:ntrated Loadsl(Ib)
Vert: 2=409 11=510 12=2568 13=409914=510 15=586
2 C&C:
m Loads (plf]
Vert: 1-11=- 6.0, 2-11=-36.0, 2-12=-36.0, 3-12=-36.0, 3-13=-36.0, 4-13=-36.0, 4-14=-36.0, 14-15=-36.0, 5-15=-36.0, 9-10=-24.0, 8-9=-24.0, 7-8=-24.0,
6-7=-24.0
Normal: 1-1 -66.3, 2-11=-66.3, 2-12=-66.3, 3-12=-101.6, 3-13=-66.3, 4-13=-66.3, 4-14=-66.3, 14-15=-66.3, 5-15=-66.3
Parallel: 1-1 185.1, 5-6=185.1
nitrated Load (lb)
Vert:2=409 11=510 12=2568 13=4099 14=51 0 1 5=586
i
m Loads (plt
Vert: 1-11=- 0.0. 2-11=-60.0, 2-12=-60.0, 3-12=-60.0, 3-13=-60.0, 4-13=-60.0, 4-14=-60.0, 14-15=-60.0, 5-15=-60.0, 9-10=-40.0, 8-9=-40.0, 7-8=-40.0, 6-7=-40.0
intrated Load ,! (lb)
Vert: 2=-1395 11=-135 12=-1040 13=-1395 14=-135 15=-174
Job
St.Lucie Oaks Commercial Center
Truss Type
Qty
Ply
Truss
071001
ROOF TRUSS
1
1
HA
The
MI narch Company
7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:27:56 2008 Page 1
SCREW
CITY (Total =
06 ). All Screws Are #12-14 T/3
CHORDS
1-10:3, 5-6:
6-5:6, 10-1:3
WEBS
1-9:8, 2-8:8,
2-9:9, 3-7:5, 3-8:5, 4-6:8, 4-7:3
I
3-2-2 3-8-8 3-8-8 4-0-2
3-2-2 6-10-9 10-7-1 14-7-3
3.18 r12 5
2
4
8
3
\�
3 \�
ti
'
� 8
2 69
rBl
89
5 3 B 6
I
j
o
o o
1
1
8 12 7 6-8-1:1::::
�Fz
3-8-8 4-0-2
2-8-7 3-2-2 6-10-9 10-7-1 14-7-3
SCREW
CITY
TOP
BOT
TOP
BOT
VG (pso
20.0
15.0
0.0
10.0
SECTION
LORD 35 t
W1
iORD 35 t
362
Max
Max
Max.
1-1(
9-1(
1-9=
7-4:3, 8-2:8, 8-3:5, 9-1:8, 9•
SPACING 4-0-0
Code
FBC/AISI
035 50 'Except`
USWD 035 50, W9 362 USWD 035 50
05750
VD 035 50
iterial)6/0-4-0/USKW, 9/0-11-5/CMU
1 6=1193(load case 1), 9=1170(load )
6=-1460(load case 2), 9=-1394(load se 2)
ipression Force
2, 1-2=-1927, 2-3=-1272, 3-4=-1249, 4-5=-135, 5-6=-217
9-11=-597, 8-11=-597, 8-12=-1005, 7-12=-1005,6-7=-1459
, 2-9=-1544, 2-8=-2068, 3-8=-571, 3-7=-1278, 4-7=-591, 4-6=-1492
CSI
DEFL (in) (loc) I/deft
TC 0.93
Vert(LL) 0.09 7-8 >999
BC 0.93
Vert(TL) 0.07 7-8 >999
WB 0.39
Horz(TL) 0.01 6 n/a
(Matrix)
Min Length / LL deft = 240
BRACING
TOP CHORD heat
Truss weiaht = 92 Ibs
SCREW VALUE. (#12-14 T/3)
035 2561b 046 4501b
057 5401b 073 6561b
097 6621b
inter purlin spacing 1-5
10-6
1) Th'is truss designed;with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 73.09 sq. ft., 0.6 DL applied. The Left End
Vertical and Right �d Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load app ied to this truss resulting from the standard wind load, equal to 982 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which sh II be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) For truss to truss c6Itnection(s) of concentrated load(s) shown refer to Aegis Detail Series U32US. Special connection(s) required for other type load(s). Design of connection(s)
is delegated to the uilding designer.
4) 35USKW attached to truss at Joint 6 with 4 410 sds. Refer to Aegis detail US2US-1.
5) Load case(s) 1, 2, 1 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of this truss.
6) Attach 35USGP x 2" at location of tie-in trusses - See detail US2US-3B.1
7) Attach 35USGPX iom 10 to 6 - See details US2US-5.1
8) USGP-X capacity e�Cceeded special connections required at 11,
9) Top chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE'S)
1) Live:
Uniform Loads (plf)
Vert: 1-2=- 40.0, 2-3=-140.0, 3-4=-140.0, 4-5=-140.0, 9-10=-40.0, 9-11=-40.0, 8-11=-40.0, 8-12=-40.0, 7-12=-40.0,
6-7=-40.0
Concentrated Loads (lb)
Vert: 11=1 T07 12=-572
21 VVind 1 C&C:
U�iform Loads (plo,
Vert: 1-2=-36.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 9-10=-24.0, 9-11=-24.0, 8-11=-24.0, 8-12=-24.0, 7-12=-24.0,
6-7=-24.0
I Normal: 1- =248.7, 2-3=248.7, 3-4=248.7, 4-5=248.7, 9-10=347.0
Concentrated Loaos (lb)
Vert: 11=-11 65 12=971
3) Wind 2 C&C:
on page 2
I
Job St. Lucie Oaks Commercial Center Truss Type Qty Ply Truss
07100 7 ROOF TRUSS 1 1 HA
The Monarch Compan i 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:27:56 2008 Page 2
-OADI CASE(S)
Uniform Loads (plf)
Vert: 1-2=
Normal: 1-2
Concentrated Load
Vert: 11=-1
t)-Dead:
Uniform Loads (plf)
Vert: 1-2=-E
Concentrated Load,
Vert: 11=56
2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 9-10=-24.0, 9-11=-24.0, 8-11=-24.0, 8-12=-24.0, 7-12=-24.0, 6-7=-24.0
'.1, 2-3=-87.1, 3-4=-87.1, 4-5=-87.1, 9-10=408.8
I
12=971
0, 2-3=-60.0, 3-4=-60.0, 4-5=-60.0, 9-10=-40.0, 9-11=-40.0, 8-11=40.0, 8-12=-40.0, 7-12=40.0, 6-7=-40.0
;lb)
12=-318
07100
Truss Type c tty riy I russ
ROOF TRUSS 4 1 HD
s
56
CITY (Total = 76 ). All Screws Are #12-14 T/3
i 1-8A, 4-5:3 5-4:4, 8-1A
1-7:9, 2-6:6 2-7:6, 3-5:5, 3-6:3
—4
4-2-15 2-11-9 5-3-5
4-2-15 7-2-7 12-5-12
2-9-15 4-2-15 7-2-7 12-5-12
T2K
SCREW CITY
WEBS 5-3:5, 6-2: , 6-3:3, 7-1:9, 7-2:9 Truss weight = 85 Ibs
LOADING (psf) SPACING 4-0-0 CS] DEFL (in) (loc) I/defl SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.76 Vert(LL) 0.13 7-8 >755 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.89 Vert(TL) 0.12 7-8 >823 057 5401b 073 6561b
BCLL 0.0 WB 0.40 Horz(TL) 0.01 5 n/a Ilin
6621b
to
BCDL 10.0 (Matrix) Min Length / LL deft = 240 #
STEEL SECTION BRACING
TOP CHORD 35 US 046 50 *Except* TOP CHORD h or 2-0 centespacing 1-4
W1 362 USWD 035 50, W7 362 USWD 035 50 BOT CHOR 4-0-0 o enter • r Mg 8-5
BOT CHORD 35 USIJ 046 50
WEBS 362 USWD 035 50 *Except*
W3 362 USWD 046 50
REACTIONS at/size/ llaterial)5/0-4-0/USKW, 7/2-9-15/CMU
Max DoWn 5=1013(load case 3), 7=1875(load case 1)
Max Uplift 5=-917(load case 2), 7=-3863(load case 2)
FORCES (lb) Max. C II pression Force
TOP�CHORD 1-8=-8�, 1-2= 2128, 2-3=-689, 3-4=-337, 4-5=-311
BOTICHORD 8-9=-2,I7-9=0, 6-7=-618, 5-6=-462
WEBS 1-7=-6 1, 2-7=-1558, 2-6=-1398, 3-6=-415, 3-5=-1133
NOTES
1) This truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
BLilding, I = 1.00 , f <z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 60.60 sq. ft., 0.6 DL applied. The Left End
Vertical and Right qnd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load apt lied to this truss resulting from the standard wind load, equal to 1505 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which sh�ll be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) For truss to truss connection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
isl delegated to the building designer.
4) 35USKW attached to truss at Joint 5 with 4 410 sds. Refer to Aegis detail US2US-1.
5) Load case(s) 1, 2, 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of
t1iis truss.
6) Attach 35USGP x�012" at location of tie-in trusses -See detail US2US-3B.1
7) Attach 35USGPXi rom 8 to 5 - See details US2US-5.1
8) Top chord load ap lied at 0-0-0 oc via valley trusses above.
LOAD CASE(S)
1) Live:
Urriform Loads (pl
Vert: 1-2=111�40.0, 2-3=-140.0, 3-4=-140.0, 8-9=-40.0, 7-9=-40.0, 6-7=-40.0, 5-6=-40.0
Concentrated Loatls (Ib)
Vert:6=-1Q2 9=-120
2) Wind 1 C&C:
Tniform Loads (pillf)
Vert: 1-2= P6.0, 2-3=-36.0, 3-4=-36.0, 8-9=-24.0, 7-9=-24.0, 6-7=-24.0, 5-6=-24.0
Normal: 1. 2=255.7, 2-3=255.7, 3-4=255.7, 8-9=347.0, 7-9=347.0
Concentrated Loads (lb)
Vert:6=57 9=402
3) Wind 2 C&C:
Uniform Loads (pl
Vert: 1-2=,, 6.0, 2-3=-36.0, 3-4=-36.0, 8-9=-24.0, 7-9=-24.0, 6-7=-24.0, 5-6=-24.0
Normal: 1-2=-89.9, 2-3=-89.9, 3-4=-89.9, 8-9=408.8, 7-9=408.8
:ontinued on page 2 Il
ROOFTRUSS 4 1 J.HD
s Sep 25 2007 Aegis Metal Framing, LL
Mon Apr 28
4)
CASE(S)
centrated Lo:
Vert: 6=5
d:
orm Loads (p
Vert: 1-2=
centrated Loo
Vert: 6=!
(lb)
9=402
;0.0, 2-3=-60.0, 3-4=-60.0, 8-9=-40.0, 7-9=-40.0, 6-7=-40.0, 5-6=-40.0
(lb)
9=-67
Job
071
Th
S
QTY (Total = 70, ). All Screws Are #12-14 T/3
3 1-8:3, 4-5:2, � 4:5, 8-1:3
1-7:8, 2-6:3, -7:6, 3-5:9, 3-6:6
�I
3-4-15
7-1-1
3.18 12
s
truss I ype l iry rry ruses
ROOF TRUSS 1 1 HK
11-0-12
3
TZ K
8
7 C2K
9
6 5
2-8-7 0-8-8
3-8-2
3-11-12
2-8-7 3-4-15
7-1-1
11-0-12
SCR4W
CITY
WE
5-3:9, 6-2:
6-3:6, 7-1:8, 7-2:7
Truss weight= 67 Ibs
LOADING
(psf)
SPACING 4-0-0
CSI
DEFL (in)
(loc) I/deft
W VALUE. (#12-14 T/3)
TCLL
20.0
Code
TC 0.90
Vert(LL) 0.09
8 >890
"13561b 046 4501b
TCD
15.0FBC/AISI
BC 0.83
Vert(TL) 0.08
7-8 >99
401b 073 6561b
BCLL
0.0
WB 0.47
Horz(TL) 0.01
5 /
0621b
BCDL
10.0
(Matrix)
Min Length / LL d
4
#
STEEL SECTION
B G
TOP CHORD 35 USDI 035 50 *Except*
CHORD
heat i or 2- -0 on center purlin spacing 1-4
W1 367'!USWD 035 50, W7 362 USWD 035 50
B - ORD
center bracing 8-5
BOT CHORD 35 USD,;057 50
WEBS 362 USjND 035 50
REACTIONS Uusize/rgaterial)5/0-4-0/USKW, 7/1-5-0/CMU
Max Do" 5=1290(load case 3), 7=1056(load case 1)
Max Uplift 5=-117(load case 2), 7=-1815(load case 2)
FORCES (lb) Max. Colmpression Force
TOP CHORD 1-8=-638, 1-2=-2038, 2-3=-1841, 3-4=-142, 4-5=-222
BOT CHORD 7-8=-1,j�-9=-580, 6-9=-580, 5-6=0
WEBS 1-7=-58,5, 2-7=-966, 2-6=-712, 3-6=-479, 3-5=-2221
1) TFjis truss designed�'With ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Brilding, I = 1.00 , IF = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 44.56 sq. ft., 0.6 DL applied. The Left End
Vertical and Right qpd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load app ed to this truss resulting from the standard wind load, equal to 793 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) For truss to truss connections) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
isIdelegated to the puilding designer.
4) 35USKW attached o truss at Joint 5 with 4 410 sds. Refer to Aegis detail US2US-1.
5) Load case(s) 1, 2, , 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of this truss.
6) Attach 35USGP x 2" at location of tie-in trusses -See detail US2US-3B.1
7) Attach 35USGPX 'om 8 to 5 - See details US2US-5.1
8) Top chord load ap ied at 0-0-0 oc via valley trusses above.
LOAD CASE(S)
1) Live:
Uniform Loads (plf�,
Vert: 1-2=- 40.0. 2-3=-140.0, 3-4=-140.0, 7-8=-40.0, 7-9=-40.0, 6-9=-40.0, 5-6=-40.0
Concentrated Loa s (lb)
Vert: 9=49
2) Wind 1 C&C:
Uniform Loads (pl
Vert: 1-2= 36.0, 2-3=-36.0, 3-4=-36.0, 7-8=-24.0, 7-9=-24.0, 6-9=-24.0, 5-6=-24.0
Normal: 1- =267.2, 2-3=267.2, 3-4=267.2, 7-8=347.0
Concentrated Loa s (lb)
Vert: 9=-1 #1z9
3) Wind 2 C&C:
Uniform Loads (pl�
Vert: 1-2=h6.0, 2-3=-36.0, 3-4=-36.0, 7-8=-24.0, 7-9=-24.0, 6-9=-24.0, 5-6=-24.0
Normal: 1J2=-94.5, 2-3=-94.5, 3-4=-94.5, 7-8=408.8
Concentrated Loads (lb)
Vert: 9=-1 29
;ontinued on page 2 11
Job!
St.Lucie Oaks Commercial Center
Truss Type
Qty
Ply
Truss
0710017
I
ROOF TRUSS
1
1
HK
i tie monarcn t;ol
LOAD CASE(S)
4) Dead:
Uniform Loads
Vert:1
Concentrated I
Vert: 9
.I
.0, 2-3=-60.0, 3-4=-60.0, 7-8=-40.0, 7-9=-40.0, 6-9=-40.0, 5-6=-40.0
(lb)
j �I; 1fl
liY
I. 10-0/ J Otep 40 LV1 VI MtVyl, IVICIdI f IGllllIItj, —L . IVIVII MIJI — IuI—I —V I oyc �
0017
CITY (ToT!1�51
11 1 86 ). All Screws Are #12-14 T/3
i 1-8:4,, 5 4:4, 8-1:4
1-7:11-6:9, 2-7:6, 3-5:5, 3-6:3
14*
ti
C'IO
4-1-7
9 7
2-8-7 1-5-0
2-8-7 4-1-7
tEW CITY
3S 5-3:5, 6- 9, 6-3:3, 7-1:11, 7-2:10
ANG (psf) SPACING 4-0-0
20.0 Code
15.0 FBC/AISI
0.0
10.0
.L SECTION
CHORD 35 US4 046 50 *Except*
W1 3621 USWD 035 50, W7 362 USWD 035 50
CHORD 35 USD 046 50
S 362 USWD 035 50 *Except*
W3 3d,, USWD 046 50
mmercial Center
Truss Type
Qty
Ply
Truss
ROOF TRUSS
__j
2
1
HL
7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 1
4-6-11
4-10-5
8-8-2
13-6-7
4
3.54 12
2
3
5
3
i
6
s
' 4
p
3
5
4
7
�
o
O
C5 K
106
5
4-6-11
4-10-5
8-8-2
13-6-7
Truss weic
CSI
DEFL
TC 0.91
Vert(LL)
BC 0.94
Vert(TL)
WB 0.56
Horz(TL)
(Matrix)
Min Length
REACTIONS 0t/size/n'iaterial)5/0-4-0/USKW, 7/2-9-15/CMU
Max Dox6 5=880(load case 3), 7=1951(load case 1)
Max Upl 5=-823(load case 2), 7=-4344(load case 2)
FORCES (It Max. CoLression Force
TOP CHORD 1-8=-8 , 1-2=-2604, 2-3=-829, 3-4=-187, 4-5=-270
BOT CHORD 8-9=-2,17IP-9=0, 7-10=-792, 6-10=-792, 5-6=-588
WEBS 1-7=-79,7, 2-7=-1425, 2-6=-2315, 3-6=-356, 3-5=-1145
ACIN�
\V
.Q CHC
OT CHC
TZK
(in) (loc) I/deftCREW VALUE. (#12-14 T/3)
0.16 7-8 >58AN"97
35 2561b 046 4501b
0.15 7-8�6457 5401b 073 6561b
0.01 n 6621b
had or 2-0-0 on center purlin spacing 1-4
on center bracing 8-5
1) ThI's truss designediiI' ith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 63.55 sq. ft., 0.6 DL applied. The Left End
Vertical and Right Eiid Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load appl ed to this truss resulting from the standard wind load, equal to 1021 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) For truss to truss coflnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
is delegated to the b ilding designer.
4) 350SKW attached tp truss at Joint 5 with 4 -#10 sds. Refer to Aegis detail U82US-1.
5) Load cases) 1, 2, 3, 14 has been modified. Building designer must review loads to verify that they are correct for the intended use of
this truss. 111
6) Attach 35USGP x 12" at location of tie-in trusses - See detail US2US-313.1
7) A6ch 35USGPX from 8 to 5 - See details US2US-5.1
8) T661 chord load appli'd at 0-0-0 oc via valley trusses above.
LOAD, CASE(S)
1) Live:
Uniform Loads (plf)
Vert: 1-2=-140.0, 2-3=-140.0, 3-4=-140.0, 8-9=-40.0, 7-9=-40.0, 7-10=40.0, 6-10=40.0, 5-6=-40.0
Coricentrated Loads l(Ib)
V,ert: 9=-261 0=94
2) Wind 1 C&C:
Uni irm Loads (plf)
Vert: 1-2=-36 0, 2-3=-36.0, 3-4=-36.0, 8-9=-24.0, 7-9=-24.0, 7-10=-24.0, 6-10=-24.0, 5-6=-24.0
Normal: 1-2= 54.0, 2-3=254.0, 3-4=254.0, 8-9=347.0, 7-9=347.0
Concentrated Loads �jb)
Vert:9=704 10=520
3) Wind 2 C&C:
Uniform Loads (plf)
1 Vert: 1-2=-36 0, 2-3=-36.0, 3-4=-36.0, 8=9=-24.0, 7-9=-24.0, 7-10=-24.0, 6-10=-24.0, 5-6=-24.0
Normal: 1-2=�$9.2, 2-3=-89.2, 3-4=-89.2, 8-9=408.8, 7-9=408.8
continued on page 2
Job
1
St.Lucie Oaks Commercial Center
Truss Type
Qty
Ply
Truss
6710017
i
ROOF TRUSS
2
1
HL
The Monarch Coi
LOAD CASE(S)
Concentrated I
Vert: 9
4) Dead:
Uniform Loads
Vert: 1
-Concentrated I
Vert: 9
7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 15:05:47 2008 Page 2
(lb)
10=520
=-60.0, 2-3=-60.0, 3A=-60.0, 8-9=-40.0, 7-9=-40.0. 7-10=-40.0, 6-10=-40.0, 5-6=-40.0
ads (lb)
145 10=52
0710017
s
Truss Type Qty Ply Tru:
ROOF TRUSS 1 1 HL1
CITY (Total =1 63 ).All Screws Are #12-14 T/3
i 1-6:3, 3-4:21 4-3:4, &1.3
1-5:9, 2-4:7j 2-5:5
CM
M
M
4-1-7
3.54 12
4-8-8
8-9-14
u p I -
O
1_5-0 5 C 4 K 4_8_6 4
SCREW CITY 11 2-8-7 4-1-7 8-9-14
WEBS 4-2:7, 5-1:9, 5-2:14 Truss weight = 41 Ibs
LOADI G (psf) SPACING 4-0-0 CSI DEFL (in) N/a
SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.85 Vert(LL) 4 -6 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.85 Vert(TL 5-6 057 5401b 073 6561b
BCLL 0.0 WB 0.35 orc(T1 0.01 0976621b
BCDL 10.0 (Matrix) Min Le h / LL f1= #
STEELSECTIONB ACING
TOP CHORD 35 USD 0 7 50'Except' P CHORD Sheathed or 2-0-0 on center purlin spacing 1-3
W1 362 TSWD 035 50, W5 362 USWD 035 50 ROT CHORD 4-0-0 on center bracing 6-4
BOT C I ORD 35 USD 0�5 50
WEBS 362 USW D 035 50 'Except'
W3 362 U SWD 057 50
REACTIONS Gt/size/matllrial)4/0-4-0/USKW, 5/2-9-15/CMU
Max Down 4=887(load case 3), 5=1435(load case 1)
Max Uplift 5=-3430(load rase 2)
FORCES (Ib) Max. Com ssion Force
TOP CHORD 1-6=-667, 2=-2199, 2-3=-178, 3-4=-274
BOT CHORD 5-6=-1, 4- =-582
WEBS I 1-5=-586, 5=-1140, 2-4=-1595
NOTESI
1) This truss designed wi ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , Kz - 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using atop chord tributary area of 35.57 sq. ft., 0.6 DI -applied. The Left End
Vertical and Right EndlVertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load applied to this truss resulting from the standard wind load, equal to 723 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall b¢ the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attached to truss at Joint 4 with 4 -#10 sds. Refer to Aegis detail US2US-1.
4) Top chord load applied 6t 0-0-0 oc via valley trusses above.
LOAD CASES) Standar .
0017
Truss Type Qty Ply Truss
ROOF TRUSS 4 1 HM
s
00
QTY (Tot�l = 58 ). All Screws Are #12-14 T/3
i 1-8:Z 152, 5-4:4, 8-1:2
1-7:6, 6:3, 2-7:6, 3-5:4, 3-6:3
�I a
3-4-15 2-7-12 2-11-6
3-4-15 6-0-11 9-0-0
g 7 6 5
2-8-7 0-8-8 2-7-12 2-11-6
2-8-7 3-4-Lj 6-0-11 9-0-0
SCREW
WEBS
W
CITY
5-3:4, 6-
I11 L 2 �[
:3, 6-3:3, 7-1:6, 7-2:10 7^
Truss wei ht = 42 Ibs
9
LID DING (psf)
SPACING 4-0-0
CSI
DEFL (in)
(loc) I/deft qQ SCREW VALUE. (#12-14 T/3)
TOLL 20.0
Code
TC 0.73
Vert(LL) 0.05
7-8 >99LIftl 035 2561b 046 4501b
TC!DL 15.0
FBC/AISI
BC 0.54
Vert(TL) 0.05
057 5401b 073 6561b
BOLL 0.0
WB 0.18
Horz(TL)
5 097 6621b
K
BdDL 10.0
(Matrix)
Min Len
a 240 #
STEEL SECTION
TOP CHORD 35 U D 035 50 'Except'
BRACT
PC
Og
heathed or 2-0-0 on center purlin spacing 1A
W1 362 USWD 035 50, W7 362 USWD 035 50
B T CHORD
4-0-0 on center bracing 8-5
BOT CHORD 35 UOD 035 50
WEBS 362 I SWD 035 50
REI CTIONS Qt/sizjmaterial)5/0-4-0/USKW, 7/1-5-0/CMU
Max D6wn 5=858(load case 3), 7=1252(load case 1)
Max Uplift 5=-555(load case 2), 7=-2425(load case 2)
FORCES (lb) Max. Compression Force
TOP CHORD 1-8=-530, 1-2=-1310, 2-3=-453, 3A=-197, 4-5=-179
BO,T CHORD 7-8=-, 6-7=-363, 5-6=-172
WEBS 1-7=- 66, 2-7=-1037, 2-6=-471, 3-6=-250, 3-5=-888
0
2)
3)
4)
this truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
3uilding, I = 1.00 IKz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 38.56 sq. ft., 0.6 DL applied. The Left End
/ertical and Righl End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
iorizontal load a plied to this truss resulting from the standard wind load, equal to 1156 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
iesign of which s�iall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
�SUSKW attache to truss at Joint 5 with 4 -#10 sds. Refer to Aegis detail US2US-1.
jop chord load applied at 0-0-0 oc via valley trusses above.
AD CASE(S) Standard
7
ROOF TRUSS 13 11 I HN
s
10:28:02
CITY (To15'1'6:2.6-5:6,9-1:2
I = 90 ). All Screws Are #12-14 T/3
i 1-9:2,
1-8:5, 2� :6, 2-8:9, 3-7:2, 4-6:6, 4-7:7
3-2-2 1-2-15 2-1-11 2-5-5
3-2-2 4-5-1 6-6-12 9-0-0
5.66 12
0
2
0
6
9
I
2
T
5
9
6
Co1
E
(TiD
S
WEBS
REW CITY
6-4:6, 7'
2-8-7 51
2-8-7 23-2-2 4-5-1
:6, 7-3:10, 7-4:7, 8-1:5, 8-2:9 1 K
4-6-15
9-0-0
Truss weight = 54 Ibs
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in)
(loc) I/deft
REW VALUE. (#12-14 T/3)
TOLL 20.0
Code
TC 0.65
Vert(LL) 0.05
8-9
5 2561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.48
Vert(TL) 0.04
8-9 999
5401b 073 6561b
BELL 0.0
WB 0.30
Horz(TL) 0
6 n/a
0 6621b
BGDL 10.0
(Matrix)
Mi ngth / deft = 2
#
STEEL SECTION
YQING
TOP CHORD 35 U
D 035 50 *Except*
CHORD
eathed or 2-0-0 on center purlin spacing 1-5
W1
02 USWD 035 50, W8 362 USWD 035 50
BIORD
4-0-0 on center bracing 9-6
BOT CHORD 35 U
D 035 50
WEBS BS 362 1
iSWD 035 50
REACTIONS at/Size/material)6/0-4-0/USKW,
8/0-11-5/CMU
Max Down
6=1375(load case 3), 8=1252(load case 3)
Max L
plift 6=-105(load case 2), 8=-294(load case 2)
FORCES (lb) Max.
11ompression Force
TOP CHORD 1-9=-499,
1-2=-1206, 2-3=-1715, 3-4=-1675, 4-5=-166, 5-6=-135
BO,T CHORD 8-9=
J, 7-8=-361, 6-7=-118
WEBS 1-8=,,65,
2-8=-2153, 2-7=-454, 3-7=-186, 4-7=-937, 4-6=-1433
1) T his truss design d with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 I Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 38.56 sq. ft., 0.6 DL applied. The Left End
2) hY ertical and Righ End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
orizontal load a Vied to this truss resulting from the standard wind load, equal to 1156 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which s all be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) or truss to truss connection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s).
4) 5USKW attache, to truss at Joint 6 with 4 410 sds. Refer to Aegis detail US2US-1.
5) toad case(s) 1, 2' 3, 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of this truss.
6) Attach 35USGP 12" at location of tie-in trusses - See detail US2US-3B.1
7) Special connections required at joints 7,
8) Attach 35USGPX from 9 to 6 - See details US2US-5.1
9) USGP-X capacit iaexceeded special connections required at 7,
10). Top chord loadapplied at 0-0-0 oc via valley trusses above.
LOAD CASE(S)
1) Live:
Uniform Loads (p
I* Vert: 1-2 '1140.0, 2-3=-140.0, 3-4=-140.0, 4-5=-140.0, 8-9=-40.0, 7-8=-40.0, 6-7=-40.0
Concentrated Lo ds (lb)
Vert: 7=1 68
2) Wind 1 C&C:
Uniform Loads (p
Vert: 1-2 36.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 8-9=-24.0, 7-8=-24.0, 6-7=-24.0
Normal: 1'2=272.6, 2-3=272.6, 3-4=272.6, 4-5=272.6, 8-9=347.0
Concentrated Lo ds (lb)
Vert: 7=- 01
3) Wind 2 C&C:
Uniform Loads (p fl
Vert: 1-2 36.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 8-9=-24.0, 7-8=-24.0, 6-7=-24.0
Normal: 1'2=-96.7, 2-3=-96.7, 3-4=-96.7, 4-5=-96.7, 8-9=408.8
;ontinued on page 2
16-32 s
ROOF TRUSS 13 11 1 HN
LOAD
corI centrated Loads
Vert:7=-250
4) Dead:
Uniform Loads (plf)
Vert: 1-2=-6(
Concentrated Loads
Vert: 7=871
2-3=-60.0, 34=-60.0, 4-5=-60.0, 8-9=-40.0, 7-8=-40.0, 6-7=-40.0
;t s`
�a r
y ._ts
7
ROOF TRUSS 1 1 HN1
s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 1.0:28:02 2008 Page 1
1
QTY (Total :H 29). All Screws Are #12-14 T13
i 1-6:2, 3-4 2, 4-3:5, 6-1:2
1-5:2, 2-4 6, 2-5:2
O
T
3-0-8 3-0-8
3-0-8 6-1-0
X,RRF1 -,5-
TZK
1
SCEW
W
QTY
BS 4.2:5, 5-1,2,
5-2:2
3-0-8
6-1-0
Truss wei ht = 31 Ibs
LOADING (psf)
SPACING
4-0-0
CSI
DEFL
(in)
VALUE. (#12-14 Tl3)
TCLL 20.0
Code
TC 0.58
Vert(LL)
0.01
035 2561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.21
Vert(TL)
0(locl/dSCREW
057 5401b 073 6561b
BCL� 0.0
WB 0.13
Horz(T
-0. 01/a
097 6621b
BCDL 10.0
(Matrix)
in Le
h / LL d
#
i
STEEL SECTION
ACI
CHORD 35 USQ 035 50 'Except'
CHORD Sheathed 1-3
ViP
36P USWD035 50, W5 362 USWD 035 50
W135
ZI
T CHORD 4-0-0 on center bracing 6-4
CHORD 50
WEBS 362 USWD 035 50
1 11
:TIONS Qt/size/material)6/0-8-8/LGF, 4/0 4-OIUSKW
Max Doyen 6=520(load case 1), 4=632(load case 3)
Max Uplift 6=-207(load case 2), 4=-1110(load case 2)
:ES (lb) Max. C ,mpression Force
CHORD 1-6=4V2, 1-2=-366, 2-3=-198, 3-4=-180
CHORD 5-6=-7�98, 4-5=-704
S 1-5=0,,2-5=-46. 2-4=-568
1) T is truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
B ilding, I = 1.00 , IKz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using atop chord tributary area of 25.65 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load ap�Iied to this truss resulting from the standard wind load, equal to 798 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
dgsign of which shill be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections
3) 3gUSKW attached 'to truss at Joint 4 with 5 410 sds. Refer to Aegis detail US2US-1.
4) Top chord load applied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stagpard
0710017
2)
3)
QTY (Total ='j109 ). All Screws Are #12-14 T/3
3 1-11:2, 6-�2, 7-6:4, 11-1:2
1-10:6, 2-9:8, 2-10:6, 3-8:10, 3-9:6, 4-8:3, 5-7:3, 5-8:3
11 2-7-13 1-5_ 10 4-
111 2-7-13 4-1-7
,I
I
E
6
)
1'1
2-7-13
2-7-13
SCREW QTy
)ING (psf)
20.0
15.0
0.0
10.0
:L SECTION
CHORD 351
W1
f-HORD 351
i 362
W5
SPACING
Code
10 9
;r Truss Type Qty Ply Truss
ROOF TRUSS 2 1 FIR
7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mo
4-2-4 2-5-9 2-9-3
8-3-11 10-9-4 13-6-7
3.54 V2
2-8-7 4-1-7 C d �[
:8, 9-3:15, 10-1:6, 10-2:6 �'i 1�
4-0-0 CSI
TIC 0.82
FBC/AISI BC 0.36
WB 0.57
(Matrix)
8
4-2-4
1 13-6-7
DEFL (in) (too) I/deft
Vert(LL) 0.10 11 >963
Vert(THorz(T) 0.01 1 r
Horz(TL) 0.01 7 n/a
Min Length / 0
Page 1
T2K
7
Truss weight = 84 Ibs
IEW VALUE. (#12-14 T/3)
2561b 046 4501b
5401b 073 6561b
6621b
046 50 *Except* HOF�I(hed or 2-0-0 on center purlin spacing 1-6
USWD 035 50, W10 362 USWD 035 50 CHORD 0 on center bracing 11-7
03550
VD 035 50 *Except*
USWD 057 50
TIONS Ot/size/r�iaterial)7/0-4-0/USKW, 9/2-9-15/CMU
Max Do n 7=832(load case 3), 9=1951(load case 1)
Max Up !ft 7=-863(load case 2), 9=-3794(load case 2)
ES (lb) Max. COlmpression Force
:HORD 1-11= 17, 1-2=-1280, 2-3=-2760, 3-4=-715, 4-5=-818, 5-6=-107, 6-7=-149
:HORD 10-111r1, 9-10=-425, 8-9=-904, 7-8= 469
i 1-10=-430, 2-10=-1399, 2-9=-611, 3-9=-1383, 3-8=-2555, 4-8=-516, 5-8=-183, 5-7=-791
truss designeo with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
ding, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 63.64 sq. ft., 0.6 DL applied. The Left End
`.ical and Right Pd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
zontal load applied to this truss resulting from the standard wind load, equal to 1029 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
gn of which sho'll be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
truss to truss connection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
slegated to thelbuilding designer.
SKW attachedi,to truss at Joint 7 with 4 410 sds. Refer to Aegis detail US2US-1.
d case(s) 1, 2, 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of
truss.
ch 35USGP x 12" at location of tie-in trusses - See detail US2US-3B.1
ch 35USGPX rom 11 to 7 -See details US2US-5.1
chord load applied at 0-0-0 oc via valley trusses above.
CASE(S)
orm Loads (pl
Vert: 1-2= 140.0, 2-3=-140.0, 3-4=-140.0, 4-5=-140.0, 5-6=-140.0, 10-11=-40.0, 9-10=40.0, 8-9=-40.0, 7-8=-40.0
centrated Loads (lb)
Vert: 10=- 61 8=94
d 1 C&C:
arm Loads (pl�
Vert: 1-2436.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 10-11=-24.0, 9-10=-24.0, 8-9=-24.0, 7-8=-24.0
Normal: lj, =253.9, 2-3=253.9, 3-4=253.9, 4-5=253.9, 5-6=253.9, 10-11=347.0
centrated Loads (lb)
Vert: 10= b4 8=520
d 2 C&C:
orm Loads (plj
Vert: 1-2=136.0. 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 10-11=-24.0, 9-10=-24.0, 8-9=-24.0, 7-8=-24.0
Normal: 12=-89.2, 2-3=-89.2, 3-4=-89.2, 4-5=-89.2, 5-6=-89.2, 10-11=408.8
ad on page 2 11
0710017
ROOFTRUSS 2 1 HR
s Seo 25 2007 Aegis Metal Framing, LLC Mon Apr 28 1
LOAD CASE(S)
Concentrated Loads
(lb)
Vert:10=70
8=520
4) Dead:
Uniform Loads (plf)
Vert: 1-2=-6
.0, 2-3=-60.0, 3-4=-60.0, 4-5=-60.0, 5-6=-60.0, 10-11=-40.0, 9-10=-40.0, 8-9=-40.0, 7-8=-40.0
loncentrated Load
(lb)
I Vert:10=-1
8=52
t '*
�S
rs, tiYJ
i
0710017
s
Truss Type Qty Ply Truss
ROOF TRUSS 1 1 HR1
SCREW QTY (Total
4182 ). All Screws Are #12-14 T/3
CHORDS 1-8:3, 4-5:2,
5-4:4, 8-1:3
WEBS 1-7:9, 2-6:
, 2-7:9, 3-5:5, 3-6:4
4-1-7
3-1-12
3-5-6
4-1-7
7-3-3
10-8-8
'
4
- 1
3.54 12
�
3
�
56
\
a,
2
6
C)
\`` \
© 0
ob
1
�
7
6
5
2-8-7
1-5-0 1
3-1-12
3-5-6
2-8-7 4-1-7 7-3-3 10-8-8
SCREW QTY C4.�
WEBS 5-3:5, 6-2' , 6-3:4, 7-1:9, 7-2:13 Truss weight = 48 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/dg C VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.80 Vert(LL) 0.12 > 035 lb 046 4501b
TCDL 15.0 FBC/AISI BC 0.79 Vert(TL) 0.11 08 > 3 057 5401b 073 6561b
BCLL 0.0 WB 0.27 Horz 0.01 5 n 097 6621b
BCDL 10.0 (Matrix) in L gth / LL d ' = 24 #
I
STEEL SECTION RA G
TOP CHORD 35 USD 046 50 *Except* Sheathed or 2-0-0 on center purlin spacing 1-4
W1 36 USWD 035 50, W7 362 USWD 035 50 CHORD 4-0-0 on center bracing 8-5
BOT CHORD 35 USb 035 50
WEBS 362 USWD 035 50
REACTIONS at/sizell 7/2-9-15/CMU
Max Doyen 5=900(load case 3), 7=1514(load case 1)
Max Uplift 5=-250(load case 2), 7=-3293(load case 2)
FORCES (lb) Max. Compression Force
TOP CHORD 1-8=-642, 1-2=-2226, 2-3=-831, 3-4=-144, 4-5=-199
BOT CHORD 7-8=-1IJ 6-7=-663, 5-6=0
WEBS 1-7=-657, 2-7=-1238, 2-6=-1405, 3-6=-299, 3-5=-1160
1
NOTES
1) This truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 43.43 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
lied to this truss resulting from the standard wind load, equal to 853 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
2) Horizontal load app
design of which s �II be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) 35USKW attache to truss at Joint 5 with 4 -#10 sds. Refer to Aegis detail US2US-1.
4) Top chord load ap lied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Sta idard
i
l
i
I
0710017
6-32 s
Truss Type �Qty Ply �Trus
ROOF TRUSS 1 2 K1G
SCREW CITY (Total 649 ). All Screws Are #12-14 T/3
CHORDS 1-2:2, 8-7�111 9. 8-9:9, 10-11:2. 11-10:29
WEBS 2-17:19, 2r,18:14. 3-16:6, 3-17:7, 4-15:5, 4-16:4, 5-14:4. 5-15:3, 6-13:21, 6-14:21, 7-13:2, 8-12:21, 8-13:26, 9-11:30, 9-12:27
a
2-6-0 4-1-9 4-1-9 4-1-9 4-1-9 1 3-7-4 1-4-8 2-7-8 2-11-12
2-6-0 6-7-9 10-9-2 14-10-11 19-0-4 22-7-8 24-0-0 26-7-8 29-7-4
525USAZ73x10
8 .97 10
1I 4.50 IF112
EMBrch ?LATE 1
WELID
5M LA" ICUT 3,
D073x618 17 16 15
7
0
14 13
s E Sev FIAT£ l
V4£L-0
12 1.1 SEE 1* k"w'r
2-0-0 0 6 0 4-1-9 4-1-9 1 4-1-9 4-1-9 3-7-4 4-0-0 2-11-12
2-0-0 2-6-0 6-7-9 10-9-2 14-10-11 19-0-4 22-7-8 26-7-8 29-7-4
SCREW CITY
CHORDS 1-18:4
WEBS 11-9:17. 12-8:21. 12-9:13, 13-6:10, 13-7:7, 13-8:1
Truss weight = 618 Ibs
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
W VALUE. (#12-14 T/3)
TCLL 20.0
Code
TC 0.96
Vert(LL) 0.52 14-15 >626
046 4501bTCDL
15.0
FBC/AISI
BC 0.83
Vert(TL) 0.42 14-15 >7
q356lb
401b 073 6561b
BCLL 0.0
WB 0.90
Horz(TL) -0.09 11 a
621b
BCDL 10.0
(Matrix)
Min Length / LL� IM4
#
STEEL SECTION
TOP CHORD 35 USD 035 50 *Except*
W16 6,Q USWD 035 50
BOT CHORD 55 US057 50
WEBS 362 U^§WD 035 50 *Except*
W2 60, USWD 057 50, W9 362 USWD 057 50, W10 362 US 057
W12 3�t2 USWD 046 50, W14 362 USWD 073 50
W15 60 USWD 046 50
I
REACTIONS Qt/size/ aterial)11/0-7-4/CMU, 18/1-0-0/CMU
Max D n 1 1=1 1708(load case 1), 18=6751(load case 1)
Max U . ift 11=-14622(load case 2), 18=-8309(load case 2)
"W"d or 1-9-9 on center purlin spacing 1-8, 8-10
on on center bracing 1-11
(2)600 CSJ 20ga 33 6-14 Attach to both web flanges of both plies, full
length, w/10412-14 at 12" cc
(2)600 CSJ 20ga 33 6-13 Attach to both web flanges of both plies, full
length, w/8412-14 at 12" cc
(2)600 CSJ 20ga 33 8-13 Attach to both web flanges of both plies, full
length, w/15412-14 at 12" cc
(2)600 CSJ 20ga 33 8-12 Attach to both web flanges of both plies, full
length, w/16412-14 at 12" cc
(2)600 CSJ 20ga 33 9-12 Attach to both web flanges of both plies, full
length, w/11412-14 at 12" cc
(2)600 CSJ 20ga 33 9-11 Attach to both web flanges of both plies, full
length, w/14412-14 at 12" cc
FORCES (lb) Max. Cj''?mpression Force
TOP CHORD 1-2=4d9, 2-3=-9169, 3-19=-11290, 4-19=-11195, 4-5=-11702, 5-20=-11400, 6-20=-11217, 6-7=-7728, 7-8=-7546, 8-9=-3400, 9-10=-8, 10-11=-172
BOT CHORD 1-18= 15, 17-18=-1641, 16-17=-10802, 15-16=-13163, 14-15=-13846, 13-14=-13791, 12-13=-7183, 11-12=-4271
WEBS 2-18=46043, 2-17=-9556, 3-17=-2615, 3-16=-2948, 4-16=-1147, 4-15=-2310, 5-15=-43, 5-14=-1981, 6-14=-10297, 6-13=-7973, 7-13=-696, 8-13=-13229, 8-12=-8161
* 9-12-H-1 3754, 9-11 =-1 2065
NOTES
1) 2 ;ply truss to be c pnected together with #10-16 screws as follows: Top chords connected with 1 row at 12 inches on center.
Bottom chords Gornected with 1 row at 12 inches on center.
2) This truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h =
3.3.8 ft., Exposureiategory C, Enclosed Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance =
7.90 ft. using a to chord tributary area of 287.22 sq. ft., 0.6 DL applied. The Right End Vertical is not exposed to Wind. Design
Velocity Pressure, qh = 42.94 psf.
3) Horizontal load ap lied to this truss resulting from the standard wind load, equal to 1832 Ibs, has been considered to be resisted by
the diaphragm an �or other elements, the design of which shall be the responsibility of the Engineer of Record. Wind loads applied
to the supporting wall should be considered when designing truss to wall connections.
4) Special connecti �n(s) required to support concentrated load(s) at joint(s) 14.
S) Provide adequate drainage to prevent water ponding.
6) Load case(s) 1, 2, 3, 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of
this truss.
7) Attach 5.5USGP 12" at location of tie-in trusses - See detail US2US-4B.1
B) Top chord load applied at 0-0-0 cc via valley trusses above.
LOAD CASE(S)
1) Live:
i
,ontinued on page 2
071ob17
ROOF TRUSS 1 2 1 K1G
s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 1
2
LOAD CASE(S)
Uniform Loads (pl
Vert: 1-2=
17-18=-4C
Concentrated Loa
Vert: 14=-
2) Wind 1 C&C:
Uniform Loads (pl
Vert:1-2=
16-17=-24
Normal: 1.
Concentrated Loa
Vert: 14=1
3) Wind 2 C&C:
Uniform Loads (pl
Vert:1-2=
16-17=-24
Normal: 1-
Concentrated Loa
Vert: 14=1
4) Dead:
Uniform Loads (pll
Vert: 1-2=
16-17=-40
Concentrated Loa,
Vert: 14=-.
0.0, 2-3=-140.0, 3-19=-140.0, 4-19=-140.0, 4-5=-140.0, 5-20=-140.0, 6-20=-140.0, 6-7=-140.0, 7-8=-140.0, 8-9=-140.0, 9-10=-140.0, 1-18=40.0,
16-17=-40.0, 15-16=-40.0, 14-15=-40.0, 13-14=-40.0, 12-13=-40.0, 11-12=40.0
(lb)
i4 13=-2875 12=-2875
.0, 2-3=-36.0, 3-19=-36.0, 4-19=-36.0, 4-5=-36.0, 5-20=-36.0, 6-20=-36.0, 6-7=-36.0, 7-8=-36.0, 8-9=-36:0, 9-10=-36.0, 1-18=-24.0, 17-18=-24.0,
15-16=-24.0, 14-15=-24.0, 13-14=-24.0, 12-13=-24.0, 11-12=-24.0
237.1, 2-3=237.1, 3-19=237.1, 4-19=168.3, 4-5=168.3, 5-20=168.3, 6-20=237.1, 6-7=237.1, 7-8=237.1, 8-9=219.9, 9-10=219.9, 1-18=347.0
;lb)
?9 13=3458 12=3458
0, 2-3=-36.0, 3-19=-36.0, 4-19=-36.0, 4-5=-36.0, 5-20=-36.0, 6-20=-36.0, 6-7=-36.0, 7-8=-36.0, 8-9=-36.0, 9-10=-36.0, 1-18=-24.0, 17-18=-24.0,
15-16=-24.0, 14-15=-24.0, 13-14=-24.0, 12-13=-24.0, 11-12=-24.0
82.5, 2-3=-82.5, 3-19=-82.5, 4-19=-82.5, 4-5=-82.5, 5-20=-82.5, 6-20=-82.5, 6-7=-82.5, 7-8=-82.5, 8-9=-65.3, 9-10=-65.3, 1-18=322.9
Ib)
?9 13=3458 12=3458
,0, 2-3=-60.0, 3-19=-60.0, 4-19=-60.0, 4-5=-60.0, 5-20=-60.0, 6-20=-60.0, 6-7=-60.0, 7-8=-60.0, 8-9=-60.0, 9-10=-60.0, 1-18=-40.0, 17-18=-40.0,
15-16=-40.0, 14-15=-40.0, 13-14=-40.0, 12-13=-40.0, 11-12=-40.0
:lb)
0 13=-1597 12=-1597
0710017
s
ROOF TRUSS 11 11 1 K2
a
QTY (Total) 152). All Screws Are #12-14 T/3
i 1-12:2, %:3, 5-6:2, 6-7:2, 7-6:10, 12-1:2
1-11:3, 2 i10:7, 2-11:11, 3-9:4, 3-10:3. 4-8:4, 4-9:3, 5-7:9, 5-8:7
1 2-6-0 7-2-0 7-2-0
2-6-0 9-8-0 16-10-0
0
co
M
QTY
7-5
DING (psf)
20.0
15.0
0.0
10.0
?L SECTION
CHORD 351
W1
CHORD 351
S 362
W4
Max U
FORCES (lb) Max. C
TOP CHORD 1-12=
BOT CHORD 11-12
WEBS 1-11=
NOTES
1) This truss designe
Building, I = 1.00 ,
Vertical and Right
2) Horizontal load ap
design of which st
3) Provide adequate
4) Top chord load ap
LOAD CASE(S) Stai
I
I
i
7-2-0 5-7-4
24-0-0 29-7-4
325US99073x10
1
12 11 QC3K 10 9 8 7 C?vK
2-0-0 0 6 0 7-2-0 7-2-0 7-2-0 5-7-4
2-0-0 2-6-0 9-8-0 16-10-0 24-0-0 29-7-4
8-5:7. 9-3:4. 9-4:3, 10-2:12, 10-3:3, 11-1:3, 11-2:12 is Truss weight = 180 Ibs
SPACING 4-0-0 CSI DEFL (in) (loc) I/d
Code TC 0.99 Vert(LL) 0.20 9-10 >
FBC/AISI BC 0.90 Vert(TL) -0.19 99
WB 0.77 Horz(T -0.0 7 /a
(Matrix) Mira th / L efl = 240
W VALUE. (#12-14 T/3)
03 561b 046 4501b
05 Olb 073 6561b
097 6621b
057 50 'Except' WE
RD Sheathed or 2-0-0 on center purlin spacing 1-5, 5-6
USWD 035 50, T2 35 USD 035 50, W11 60 USWD 0RD 4-0-0 on center bracing 12-7
03550 362CSJ 20ga 33 5-7 Attach to back of member full length w/5412-14
ND 035 50 'Except' sds at each end and 12" oc along length
USWD 046 50, W8 60 USWD 073 50, W9 362 USWD 046 50
aterial)7/0-7-4/CMU, 11/1-0-0/CMU
,n 7=2398(load case 1), 11=2858(load case 1)
t 7=-2398(load case 2), 11=-2943(load case 2)
npression Force
39, 1-2=-757, 2-13=-3634, 3-13=-3316, 3-14=-2853, 4-14=-2536, 4-5=-1396, 5-6=-8, 6-7=-375
, 10-11=-1460, 9-10=-3267, 8-9=-2560, 7-8=-1112
2-11=-2603, 2-10=-1837, 3-10=-287, 3-9=-966, 4-9=-238, 4-8=-1 928, 5-8=-1 176, 5-7=-2235
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 287.22 sq. ft., 0.6 DL applied. The Left End
rid Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
ed to this truss resulting from the standard wind load, equal to 1952 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
ainage to prevent water ponding.
ed at 0-0-0 oc via valley trusses above.
Job
0710017
s
Truss Type Qty Ply ITr
ROOF TRUSS 1 1 K3
2008 Paae1
SCREW QTY (Total = 154). All Screws Are #12-14 T/3
CHORDS 1-13:2, 51:3, 5-6:2, 6-8:6, 8-6:13, 13-1:2
WEBS 1-12:3, 111:7, 2-12:11, 3-10:4, 3-11:2, 4-9:4, 4-10:3, 5-8:9, 5-9:4
�_ -6-0 , 7-2-0 7-2-0 7-2-0 5-7-4 , 2-0-12 ,
2-6-0 9-8-0 16-10-0 24-0-0 29-7-4 31-8-0
325USM073x10
A
I
z 7 W4
3 4 3 .".8 9
;I
0
13 12G3K 11 10 9 8 C�K
2-0-00 6 0 2-0 7-2-0 7-2-0 7
2-0-02-6-0 9-8-0 16-10-0 24-0-0 SCREW QTY
WEBS 8-5:9, 9 :8, 9-5:7, 10-3:4, 10-4:3, 11-2:12, 11-3:2, 12-1:3, 12-2:12 Truss weight = 188 Ibs
I
LOADING (psf) SPACING 4-0-0 CSI FL ) (lo SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0. ) 0. 1 >999 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0. V T -0.19 10-11 >999 057 5401b 073 6561b
BCLL 0.0 WB 0.1rik -0.08 8 n/a 097 6621b
BCDL 10.0 (Matrix)'Mn Length / LL deft = 240 #
STEEL SECTION BRACING
TOP CHORD 35 USD 057 50 'Except' TOP CHORD Sheathed or 2-0-0 on center purlin spacing 1-5, 5-7
W1 3 Z USWD 035 50, W11 60 USWD 035 50 BOT CHORD 4-0-0 on center bracing 13-8
BOT CHORD 35 UqD 035 50 WEBS 362CSJ 20ga 33 5-8 Attach to back of member full length w/5-#12-14
WEBS 362 USWD 035 50 *Except* sds at each end and 12" oc along length
W4 36 USWD 046 50, W8 60 USWD 073 50, W9 362 USWD 046 50
REACTIONS QUsize)l aterial)8/0-7-4/CMU, 12/1-0-0/CMU
Max D8=2736(load case 1), 12=2844(load case 1)
Max U hilt 8=-3217(load case 2), 12=-2914(load case 2)
iFORCES (lb) Max. qmpression Force
TOP CHORD 1-13=b69, 1-2=-759, 2-14=-3607, 3-14=-3290, 3-15=-2821, 4-15=-2504, 4-5=-1362, 5-6=0, 6-7=0, 6-8=-768
BOT CHORD 12-13r0, 11-12=-1444, 10-11=-3202, 9-10=-2484, 8-9=-1031
WEIBS 1-12=(., 2-12=-2589, 2-11=-1787, 3-11=-282, 3-10=-958, 4-10=-243, 4-9=-1938, 5-9=-1180, 5-8=-2171
NOTES
1) This truss has bee designed for unbalanced loading conditions.
2) This truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , �� = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 334.26 sq. ft., 0.6 OL applied. The Left End
Vertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) Horizontal load applied to this truss resulting from the standard wind load, equal to 1937 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
4) Provide adequate Drainage to prevent water ponding.
5) Top chord load ap ked at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Sta Bard
I
Job St.Lucie Oaks Commercial Center I Truss Type Qty I Ply I Truss
0710I 17 ROOF TRUSS 1 1 1 1 1 K4
TheMonarch Compapy 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC
0:29:40
SCREW QTY (Totall, 174). All Screws Are #12-14 T/3
CHORDS 1-13:2, 5 .31 5-6:2, 6-8:6, 8-6:13, 13-1:2
WEBS 1-12:3, 21I11:7, 2-12:11, 3-10:4, 3-11:2. 4-9:8, 4-10:3, 5-8:9, 5-9:4
. 2-6-0 7-2-0 7-2-0 7-2-0 5-7-4 2-0-12
2-6-0 9-8-0 16-10-0 24-0-0 29-7-4 31-8-0
r'
SCREW CITY
LOADING (psf)
TCL'L 20.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
STEEL SECTION
TO i CHORD 351
W1
BOT CHORD 351
WEBS 362
W4
I
REACTIONS Qt/sizei
Max Di
Max UI
FORCES (lb) Max. C
TOP CHORD 1-13=
BOT CHORD 12-13
WEBS 1-12=
NOTES
1) This truss has bee
2) This truss designe
Building, I = 1.00 ,
Vertical and Right
3) Horizontal load ap
design of which st
4) Provide adequate
5) Tjp chord load ap
LOAD CASE(S) Stai
325USM073x10
2-0-00 6 0 7-2-0 7-2-0 7-2-0 1 5-7-4
2-0-02-6-0 9-8-0 16-10-0 24-0-0 29-7-4
9-5:7. 10-3:4, 10-4:3, 11-2:12, 11-3:2, 12-1:3, 12-2:12 — Truss
SPACING 4-0-0
Code
FBC/AISI
057 50 'Except*
USWD 035 50, W11 60 USWD 035 50
03550
VD 035 50 `Except*
USWD 046 50, W9 362 USWD 046 50
CSI
TC 0.95
BC 0.88
WB 0.76
(Matrix)
DEFL
(in) (loc) I/deft
Vert(LL)
0.21 10-11 > 99
Vert(TL)
-0.21 1 - 1 99
Horz(TL)
-0.0 n/a
Min Length / L!_ eft = 24 -
r
= 174 Ibs
;EW VALUE. (#12-14 T/3)
2561b 046 4501b
5401b 073 6561b
RD Shed or 2-0-0 on center purlin spacing 1-5, 5-7
RD 4-0-0 on center bracing 13-8
362CSJ 20ga 33 4-9 Attach to back of member full length w/4412-14
sds at each end and 12" oc along length
362CSJ 20ga 33 5-8 Attach to back of member full length w/5412-14
sds at each end and 12" oc along length
aterial)8/0-7-4/CMU, 12/1-0-0/CMU
n 8=2736(load case 1), 12=2844(load case 1)
t 8=-3217(load case 2), 12=-2914(load case 2)
npression Force
70, 1-2=-758, 2-14=-3609, 3-14=-3291, 3-15=-2818, 4-15=-2501, 4-5=-1 363, 5-6=0, 6-7=0, 6-8=-768
, 11-12=-1442, 10-11=-3203, 9-10=-2480, 8-9=-1032
2-12=-2590, 2-11=-1790, 3-11=-280, 3-1 0=-963, 4-1 0=-242, 4-9=-1 932, 5-9=-1 181. 5-8=-2173
designed for unbalanced loading conditions.
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 334.26 sq. ft., 0.6 DL applied. The Left End
nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
ed to this truss resulting from the standard wind load, equal to 1937 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
ainage to prevent water ponding.
ed at 0-0-0 oc via valley trusses above.
0710017
Truss Type Qty Ply TrL
ROOF TRUSS 1 1 K5
s
Page 1
QTY (Toti l = 144). All Screws Are #12-14 T/3
i 1-13:2, j 4:5, 5-6:4, 7-9:6, 9-7:13, 13-1:2
1-12:3, -12:5, 3-11:2, 3-12:8, 4-10:7, 4-11:3, 5-10:2, 6-9:9, 6-10:4
I
2-6-0 5-10-0 5-10-0 5-10-0 4-7-13 4-11-7 2-0-12
2-6-0 8-4-0 14-2-0 20-0-0 24-7-13 29-7-4 31-8-0
0
CV
00
,I
325US4P073x10
13 1 11 10
jC�:4K c4 K
2-0-00 6i0 8-9-0 8-9-0 9-7-4
r�
2-0-02-6-0 11-3-0 20-0-0 29-7-4
CITY
9-6:9, 1
,-4:7, 10-5:2, 10-6:4, 11-3:2, 11-4:3, 12-1:3, 12-2:13, 12-3:8
i (pst)
I SPACING 4-0-0
CSI
DEFL
90.0
Code
TC 0.94
Vert(LL)
15.0
FBC/AISI
BC 0.74
Vert(TQ
0.0
WB 0.96
Horz(TL)
10.0
(Matrix)
Min Ler�c
STEEL SECTION
TOP CHORD 35 U:
W12
BOT CHORD 35 UI
WEBS 3621
W42
RE�CTIONS Qt/size
Max D
Max U
FORCES (lb) Max. (
TOP CHORD 1-13=
BO,TCHORD 12-1-
WEBS 1-12=
NOTES
1) This truss design(
Building, I = 1.00
Vertical and Right
2) Horizontal load aF
�esign of which sl
3) Provide adequate
4) Top chord load a{
LOAD CASE(S) Sta
(in) (loc) I/deft
0.19 10-11 >99a 8
-0.21 9-10 �3
/ LLCd&fl =
Truss weight = 174 Ibs
VALUE. (#12-14 T/3)
b 046 4501b
b 073 6561b
046 50 *Except* bRD e3ft ed or 2-0-0 on center purlin spacing 1-5, 5-8
USWD 035 50, T2 35 USD 057 50, W11 60 USWD 50\VO
, D 4-0-0 on center bracing 13-9
04650 362CSJ 20ga 33 6-9 Attach to back of member full length w/5412-14
ND 035 50 *Except* sds at each end and 12" oc along length
USWD 073 50, W9 362 USWD 046 50
aterial)9/0-7-4/CMU, 12/1-0-0/CMU
n 9=2736(load case 1), 12=2844(load case 1)
t 9=-3194(load case 2), 12=-3144(load case 2)
npression Force
37, 1-2=-717, 2-14=-926, 3-14=-851, 3-15=-3348, 4-15=-3093, 4-5=-2164, 5-6=-1866, 6-7=0, 7-8=0, 7-9=-675
11 -1 2=-3413, 10-11 =-2994, 9-1 0=-1 148
2-12=-767, 3-12=-3433, 3-11=-353, 4-11=-195, 4-10=-1301, 5-10=0, 6-10=-1334, 6-9=-2226
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 334.26 sq. ft., 0.6 DL applied. The Left End
nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
ed to this truss resulting from the standard wind load, equal to 1684 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
'ainage to prevent water ponding.
ied at 0-0-0 oc via valley trusses above.
0017 II ROOF TRUSS 1 1 1 K6
Monarch Com0briv 7.16-32 s Sep 25 2007 Aegis Metal Framing, LI
CITY (Total = 168 ). All Screws Are #12-14 T/3
3 1-13:2, t 3:5, 4-5:4, 6-8:8, 8-6:13, 13-1:2
1-12:3, -11:6, 2-12:12, 3-10:5, 3-11:3, 4-9:4, 4-10:3, 5-9:6, 6-9:11
2-6-0 6-9-0 6-9-0 6-7-13 6-11-7 2-0-12
2-6-0 9-3-0 16-0-0 22-7-13 29-7-4 31-8-0
%I
I
0
0
0
:I
CITY
4.50 F12 3251JS,n073x10
13 12 11 10 9 8
c4K c4 K
2-0-00T6T0 6-9-0 6-9-0 6-7-13 6-11-7
2-0-02-6-0 9-3-0 16-0-0 22-7-13 29-7-4
7
WEBS 9-4:4, 9
:6, 9-6:11, 10-3:5, 10-4:3, 11-2:13, 11-3:3, 12-1:3, 12-2:13
Truss weight = 172 Ibs
LOADING (psf)
SPACING 4-0-0
CSI
DEFL
(in) "oc) III /d
SCREW VALUE. (#12-14 T/3)
TCLL 20.0
Code
TC 0.86
Vert(LL)
0,21 10 >
035 2561b 046 4501b
TCDL 15.0
i FBC/AISI
BC 0.99
Vert(TL)
-0.18 1 -11
057 5401b 073 6561b
BCLL 0.0
WB 0.98
Horz(TL)
7 8
097 6621b
BCbL 10.0
(Matrix)
-16
in Le
h / LL d = 24
#
ST EL SECTION
BRA
TOP CHORD 35 U
D 073 50 *Except*
OP C
Sheathed or 2-0-0 on center purlin spacing 1-4, 4-7
W1 6
USWD 035 50, T2 35 USD 057 50,
W11 60f
T CHORD 4-0-0 on center bracing 13-8
BOT CHORD 35 U
D 035 50
NV
EBS
362CSJ 20ga 33
6-9 Attach to back of member full length w/6-#12-14
WEBS 362 L
SWD 035 50 *Except*
sds at each end and 12" oc along length
W4 3
2 USWD 057 50
I
1)
2)
3)
5)
3TIONS 011size, aterial)8/0-7-4/CMU, 1211-0-0/CMU
Max Di wn 8=2738(load case 1), 12=2825(load case 1)
Max U lift 8=-3159(load case 2), 12=-3336(load case 2)
'ES (lb) Max. mpression Force
CHORD 1-13=�52, 1-2=-658, 2-3=-3623, 3-4=-2869, 4-5=-1972, 5-6=-1972, 6-7=0, 6-8=-2628
CHORD 12-13, 0, 11-12=-902, 10-11=-3672, 9-10=-2570, 8-9=-1
S 1-12=3, 2-12=-2580, 2-11=-2822, 3-11=-348, 3-10=-977, 4-10=-493, 4-9=-801, 5-9=-1072, 6-9=-2594
his truss has bee' designed for unbalanced loading conditions.
his truss designE with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
uilding, I = 1.00 , kz = 1.01 , Kd = 0.85 , Kzt =1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 334.26 sq. ft., 0.6 DL applied. The Left End
ertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
orizontal load ap Illied to this truss resulting from the standard wind load, equal to 1425 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
Dsign of which sh 11 be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
rovide adequate rainage to prevent water ponding.
op chord load ap ilied at 0-0-0 oc via valley trusses above.
,D CASE(S) Stagpard
Job' St.Lucie Oaks Commercial Center Truss Type Qty Ply Truss
07110017 ROOF TRUSS 1 1 K7
The Monarch Comp iny 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:29:45 2008 Page 1
SCREW QTY (Total = 128 ). All Screws Are 912-14 T/3
CHORDS 1-13:2, '-3:13, 4-5:6, 7-9:6, 9-7:12, 13-1:2
WEBS 1-12:4, i2-12:4, 3-11:2, 3-12:14, 4-11:2, 5-10:5, 5-11:2, 6-9:6, 6-10:5
2-6-0 4-9-0 4-9-0 5-9-3 5-9-3 6-0-13 2-0-12
2-6-0 7-3-0 12-0-0 17-9-3 23-6-7 29-74 31-8-0
I I
0
N
L
1I
4.50 Fl.2
325US JD073x10
13 12 11 10
C�K C4�
' 2-0-00 0 9-6-0 8-7-13 8-11-7
2-6-0 12-0-0 20-7-13 29-7-4
SCREW CITY I2
WEBS 9-6:7, 10-5:5,
10-6:5, 11-3:2, 11-4:2, 11-5:2, 12-1:4, 12-2:8, 12-3:8 Truss weight= 160 Ibs
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/defl REW VALUE. (#12-14 T/3)
TOLL 20.0
Code
TC 0.99
Vert(LL) 0.20 10-11 >999 2561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.75
Vert(TL) -0.18 9-10 >999 5401b 073 6561b
BCLL 0.0
WB 0.99
)NJ7
Horz(TL) -0.09 9 6621b
BCi IbL 10.0
(Matrix)
Min Length / ILL deft = 2 #
STEEL SECTION
BR CING
TOP CHORD 35 U
035 50 'Except- D CHOfShe-0 a on center purlin spacing 1-4, 4-8
W1 311b
2 USWD 035 50, T2 35 USD 057 50, W11 60 USWD 035 5 HOn center bracing 13-9
BOT CHORD 35 U
046 50
WEBS 362 USWD
035 50 *Except*
W3 3I I2
USWD 046 50, W4 362 USWD 057 50, W10 362 0
REACTIONS at/size/material)9/0-7-4/CMU,
12/1-0-0/CMU
Max Dwn
9=2736(load case 1), 12=2844(load case 1)
Max U
'lift 9=-2962(load case 2), 12=-3392(load case 2)
FORCES (Ib) Max. 0ompression
Force
F CHORD -1,
35-14=-2856, 6-14=-2856, 6-7=0, 7-8=0, 7-9=-735
112=
BO CHORD 113
W�BS 1-12=5,
0 6 13205, - 81=11-2990, 9345, 10=49363006,
2-12=-614, 3-12=-3438, 3-11=-253, 4-11=-169, 5-11=-327, 5-10=-789, 6-10=-910, 6-9=-2903
NOTES
1) This truss designE
Building, I = 1.00 ,
Vertical and Right
2) F{orizontal load ap
design of which st
3) Provide adequate
4) Top chord load ap
LOAD CASE(S) Sta
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 334.26 sq. ft., 0.6 DL applied. The Left End
rid Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
ed to this truss resulting from the standard wind load, equal to 1078 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
ainage to prevent water ponding.
ad at 0-0-0 oc via valley trusses above.
ROOF TRUSS 11 11 I K8G
28 10:29:49 2008
SCREW QTY (Total = 274 ). All Screws Are #12-14 T/3
CHORDS 1-19:2, (i-2:11, 3 4:15, 9-11:20, 11-9:20, 19-1:2
WEBS 1-18:3.-17:11, 2-18:11, 3-16:12, 3-17:3, 4-16:4, 5-14:5, 5-15:3, 5-16:3, 6-14:3, 7-12:10, 7-13:3, 7-14:12, 8-12:3, 9-12:15
2-6-0 5-6-0 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 1-7-4 , 2-0-12 ,
2-6-0 8-0-0 12-0-0 16-0-0 20-0-0 24-0-0 28-0-0 29-7-4 31-8-0
*i
i
i
4.50 12
325USJD097x10
IN
19 18 17 16 15 14 13
2-0-OOT6T0 5-6-0 4-0-0 4-0-0 4-0-0 4-0-0 4-0-0 1-7-4 ,
2-0-02-6-0 8-0-0 12-0-0 16-0-0 20-0-0 24-0-0 28-0-0 29-7-4
SCREW QTY
WEBS 12-7:10,
2-8:3, 12-9:15, 13-7:3, 14-5:5, 14-6:3, 14-7:12, 15-5:3, 16-3:12, 16-4:4, 16-5:3, 17-2:11, 17-3:4, 18-1:3, 18-2:12 Truss weight= 200 Ibs
I
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/defl
ALUE. (#12-14 T/3)
TCLL 20.0
Code
TC 0.92
Vert(LL) 0.49 15 >663
lb 046 4501b
15-
TCDL 15.0
FBC/AISI
BC 0.97
Vert(TL) 0.37 15 >8 4
073 6561b
BOLL 0.0
WB 0.93
Horz(TL) -0.13 n
)?57
BCDL 10.0
(Matrix)
Min LengW LL de 240 J
#
SECTION CHORD 35 U D 057 50 *Except*
W1 362 USWD 035 50, W17 60 USWD 035 50
CHORD 35 Udb 057 50
S 362 USWD 035 50 *Except*
W3 362 USWD 046 50, W4 60 USWD 073 50, W14 362 USWD TO
W16 60 USWD 035 50
QUsizerlmaterial)11/0-7-4/CMU, 18/1-0-0/CMU
Max DQ-n 11=4161(load case 1), 18=4139(load case 1)
Max Up'ift 11=-5114(load case 2), 18=-5161(load case 2)
Sheafffe-d or 2-0-0 on center purlin spacing 1-3, 3-10
4-0-0 on center bracing 19-11
:ES (lb) Max. Compression Force
CHORD 1-19=�316, 1-2=-584, 2-3=-5621, 3-4=-7020, 4-5=-7020, 5-6=-6833, 6-20=-6833, 7-20=-6833, 7-8=-1365, 8-9=-1365, 9-10=0, 9-11=-4062
CHORD 18-19 0, 17-18=-216; 16-17=-5532, 15-16=-8266, 14-15=-8266, 13-14=-5196, 12-13=-5196, 11-12=-5
S 1-18= 2-18=-3888, 2-17=-5464, 3-17=-455, 3-16=-2853, 4-16=-608, 5-16=-736, 5-15=-545, 5-14=-981, 6-14=-533, 7-14=-2853, 7-13=-606, 7-12=-4526, 8-12=-704,
9-12=, 709
1) This truss has bee
2) This truss designe
Building, I = 1.00 ,
Vertical and Right
3) Horizontal load ap
design of which st
4) For truss to truss c
for other type load
5) Provide adequate
6) Load case(s) 1, 2,
this truss.
7) Attach 35USGP x
8) Top chord load apj
LOAD CASE(S) Star
1) Live:
Uniform Loads (plf
Vert: 1-2=-
Vert: 17=4
1 C&C:
m Loads (plf,
Vert: 1-2=-
18-19=-24.
Normal: 1-'
9-10=377.t
designed for unbalanced loading conditions.
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 334.26 sq. ft., 0.6 DL applied. The Left End
nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
ed to this truss resulting from the standard wind load, equal to 722 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
nnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required
). Design of connection(s) is delegated to the building designer.
ainage to prevent water ponding.
4 has been modified. Building designer must review loads to verify that they are correct for the intended use of
at location of tie-in trusses - See detail US2US-3B.1
at 0-0-0 oc via valley trusses above.
I Except:
0.0, 2-3=-140.0, 3-4=-140.0, 4-5=-140.0, 5-6=-140.0, 6-20=-140.0, 7-20=-140.0, 7-8=-140.0, 8-9=-140.0,
18-19=-40.0, 17-18=-40.0, 16-17=-40.0, 15-16=-40.0, 14-15=-40.0, 13-14=40.0, 12-13=-40.0, 11-12=-40.0
(lb)
r 16=-389 15=-389 14=-389 13=-389 12=-389
i.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 6-20=-36.0, 7-20=-36.0, 7-8=-36.0, 8-9=-36.0, 9-10=-36.0,
17-18=-24.0, 16-17=-24.0, 15-16=-24.0,14-15=-24.0, 13-14=-24.0, 12-13=-24.0, 11-12=-24.0
237.1, 2-3=237.1, 3-4=219.9, 4-5=219.9, 5-6=185.5, 6-20=185.5, 7-20=219.9, 7-8=219.9, 8-9=219.9,
18-19=347.0
on page 2
0710017
ROOF TRUSS 11 11 1 K8G
s SeD 25 2007
2008
LOAD CASE(S) S
Concentrated b
Vert: 17
3) Wind 2 C&C:
Uniform Loads
Vert: 1
15-16=-
•� Normal:
Concentrated b
Vert: 17
4)1)ead:
Uniform Loads
Vert: I,
15-16=-.
Concentrated Lc
Vert: 17
and Except:
(lb)
16=653 15=653 14=653 13=653 12=653
;.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 6-20=-36.0, 7-20=-36.0, 7-8=-36.0, 8-9=-36.0, 9-10=-36.0, 18-19=-24.0, 17-18=-24.0, 16-17=-24.0,
14-15=-24.0, 13-14=-24.0, 12-13=-24.0, 11-12=-24.0
-82.5, 2-3=-82.5, 3-4=-65.3, 4-5=-65.3, 5-6=-65.3, 6-20=-65.3, 7-20=-65.3, 7-8=-65.3, 8-9=-65.3, 9-10=210.4, 18-19=322.9
(lb)
16=653 15=653 14=653 13=653 12=653
i.0, 2-3=-60.0, 3-4=-60.0, 4-5=-60.0, 5-6=-60.0, 6-20=-60.0, 7-20=-60.0, 7-8=-60.0, 8-9=-60.0, 9-10=-60.0, 18-19=-40.0, 17-18=-40.0, 16-17=-40.0,
14-15=-40.0, 13-14=-40.0, 12-13=40.0, 11-12=40.0
(lb)
? 16=-216 15=-216 14=-216 13=-216 12=-216
S
•':iF t .
0710017 11I 1 I ROOF TRUSS 11 11 I LG
7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 16:28:00 2008 Page 1
IREW CITY (Total I= 338 ). All Screws Are #12-14 T/3
11ORDS 1-18:2, 4 3:17, 4-5:17, 6-5:17, 6-7:17, 9-10:2, 10-9:2, 18-1:2
BS 1-17:4, 16:13, 2-17:13, 3-15:9, 3-16:12, 4-14:5, 4-15:7, 5-14:2, 6-13:7, 6-14:5. 7-12:12, 7-13:9, 8-11:13, 8-12:13, 9-11:4
3-0-0 3-4-8 3-4-8 4-3-0 4-3-0 3-4-8 3-4-8 3-0-0
3-0-0 6-4-8 9-9-0 14-0-0 18-3-0 21-7-8 25-0-0 28-0-0
N
oO
4
I' 5.00 F12 325US JD073x10 325USJD073x10
7 0
N.
0
18 17 16 15 14 13 12 1 10
(9?) C$�
2-0, 2-0�r 3-4-8 r 3-4-8 4-3-0 4-3-0 3-4-8 3-4-8 1-0-9 2-0-0 ,
2-0-0 3-0-0 6-4-8 9-9-0 14-0-0 18-3-0 21-7-8 25-0-0 26-0-0 28-0-0
SCREW CITY
WEBS 11-8:13, 11-9:4, 12-7:12, 12-8:13, 13-6:10, 13-7:9, 14-4:5, 14-5:2, 14-6:5, 15-3:9, 15-4:10, 16-2:13, 16-3:12, 17-1:4, 17-2 Truss weight = 190 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) floc) CREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.78 Vert(LL) 0. 4-1 >9 135 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.88 Vert(TL) >99 057 5401b 073 6561b
BCLL 0.0 WB 0.99 (TL) - .05 1 097 6621b
BCDL 10.0 (Matrix) rn-LengthTiLL defl 2 #
STEEL SECTION ING
TOPCHORD 35 USD 046 50 `Except' HORD Sheathed or 2-0-0 on center purlin spacing 1-4, 4-6, 6-9
W1 3 USWD 035 50, W17 362 USWD 035 50\\,TRAC
CHORD 4-0-0 on center bracing 18-10
BOT CHORD 35 Uq'�" D 073 50
WEBS 362 USWD 035 50 `Except'
W3 3t7 USWD 057 50, W4 362 USWD 046 50, W14 362 USWD 046 50
W15 362 USWD 057 50
REACTIONS (jt1sizeLaterial)17/2-0-0/CMU, 11/2-0-0/CMU
Max Down 17=3839(load case 1), 11=3839(load easel)
Max Ul'lift 17=-6560(load case 2), 11=-6560(load case 2)
FOR, (lb) Max. U mpression Force
TOP CHORD 1-18=[502, 1-2=-872, 2-3=-3480, 3-4=-4430, 4-5=-4595, 5-6=-4595, 6-7=-4430, 7-8=-3480, 8-9=-872, 9-10=-502
BOT CHORD 17-18 -0. 16-17=-196, 15-16=-4265, 14-15=-5915, 13-14=-5915, 12-13=-4265, 11-12=-181, 10-11=-0
WEBS 1-17==`�198, 2-17=-3517, 2-16=-5742, 3-16=-1613, 3-15=-2221, 4-15=-1718, 4-14=-1143, 5-14=-454, 6-14=-1143, 6-13=-1718, 7-13=-2221, 7-12=-1613, 8-12=-5742,
8-11=�3517, 9-11=-183
1) This truss has be(
2) This truss designE
Building, I = 1.00
Vertical and Right
3) For truss to truss
4) Provide adequate
5) Load case(s) 1, 2,
use of this truss.
6) Attach 35USGP
7) Special connectioi
8) iop chord load aF
LOAD CASE(S)
1) Live:
Uniform Loads (pl
Vert: 1-2=
16-17=-4C
Concentrated Loa
i Vert:15=-
2) Wind 1 C&C:
Yniform Loads (pl
Vert: 1-2=
15-16=-24
Normal: 1-
14-15=46d
Concentrated Loa
Vert:15=2
designed for unbalanced loading conditions.
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 258.53 sq. ft., 0.6 DL applied. The Left End
nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
nnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type Ioad(s).
ainage to prevent water ponding.
, 4, 5, 6 has been modified. Building designer must review loads to verify that they are correct for the intended
2" at location of tie-in trusses - See detail US2US-313.1
required at joints 13, 15,
ed at 0-0-0 oc via valley trusses above.
40.0, 2-3=-140.0, 3-4=-140.0, 4-5=-70.0, 5-6=-70.0, 6-7=-140.0, 7-8=-140.0, 8-9=-140.0, 17-18=-40.0,
1, 15-16=-40.0, 14-15=-194.4, 13-14=-194.4, 12-13=-40.0, 11-12=-40.0, 10-11=-40.0
.0, 2-3=-36.0, 3-4=-36.0, 4-5=-26.0, 5-6=-26.0, 6-7=-36.0, 7-8=-36.0, 8-9=-36.0, 17-18=-24.0, 16-17=-24.0,
14-15=-62.4, 13-14=-62.4, 12-13=-24.0, 11-12=-24.0, 10-11=-24.0
237.1, 2-3=237.1, 3-4=237.1, 4-5=-20.0, 5-6=-20.0, 6-7=237.1, 7-8=237.1, 8-9=237.1, 17-18=347.0.
13-14=464.8, 10-11=347.0
(lb)
713=2357
:ontinued on page 2
0017
ROOF TRUSS 11 11 1 LG
LOAD CASE(S)
3) Wind 2 C&C:
Uniform Loads I
Vert: V
12-13=-
1 Normal:
Concentrated b
Vert: 15
4) Dead:
Uniform Loads
Vert: 1
12-13=-
Concentrated Lc
Vert: 15
5) 1st unbalanced
Uniform Loads
Vert: 1
12-13
Vert: 15
6) 2nd unbalanced
Uniform Loads (
Vert: 1-'
12-13=-,
Vert: 1
36.0, 2-3=-36.0, 3-4=-36.0, 4-5=-6.0, 5-6=-6.0, 6-7=-36.0, 7-8=-36.0, 8-9=-36.0, 17-18=-24.0, 16-17=-24.0, 15-16=-24.0, 14-15=-100.9, 13-14=-100.9,
0, 11-12=-24.0, 10-11=-24.0
2=-82.5, 2-3=-82.5, 3-4=-82.5, 4-5=-83.4, 5-6=-83.4, 6-7=-82.5, 7-8=-82.5, 8-9=-82.5, 17-18=408.8, 14-15=35.2, 13-14=35.2, 10-11=408.8
1.0, 2-3=-60.0, 3-4=-60.0, 4-5=-30.0, 5-6=-30.0, 6-7=-60.0, 7-8=-60.0, 8-9=-60.0, 17-18=-40.0, 16-17=-40.0, 15-16=-40.0, 14-15=-116.9, 13-14=-116.9,
11-12=-40.0, 10-11=-40.0
(lb)
3 13=-548
40.0, 2-3=-140.0, 3-4=-140.0, 4-5=10.0, 5-6=10.0, 6-7=-60.0, 7-8=-60.0, 8-9=-60.0, 17-18=-40.0, 16-17=-40.0, 15-16=-40.0, 14-15=-194.4, 13-14=-194.4,
11-12=40.0, 10-11=-40.0
(lb)
l7 13=-987
50.0, 2-3=-60.0, 3-4=-60.0, 4-5=-70.0, 5-6=-70.0, 6-7=-140.0, 7-8=-140.0, 8-9=-140.0, 17-18=-40.0, 16-17=-40.0, 15-16=40.0, 14-15=-194.4, 13-14=-194.4,
0, 11-12=-40.0, 10-11=40.0
Job
7
COMMON 11 11 I LG1
7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 16:39:29 2008
REW QTY (Total ` 309). All Screws Are #12-14 T/3
IORDS 1-17:2, 5'".:18, 5-6:21, 9-10:2, 10-9:2, 17-1:2
?BS 1-16:4, 2. 15:18, 2-16:17, 3-14:2. 3-15:3. 4-14:4, 5-13:3. 5-14:19, 6-13:4. 7-12:8. 7-13:5, 8-11:17, 8-12:17, 9-11:4
3-0-0 3-6-8 4-0-0 3-5-8 3-5-8 4-0-0 3-6-8 3-0-0
3-0-0 6-6-8 10-6-8 14-0-0 17-5-8 21-5-8 25-0-0 28-0-0
5.00 12 525US&073x10
5
4 3 6
4 4
3T 9 7
3 � 0 5 8
2 \6 Will, = 2 8
4 W
2 ? 6 0
4 2B13 4, 5' 8 8 4
6 71�
17 16 15 14
F,M :I, EP 'P t.AIM 1 bUGLP
13 12
11 1n
Me LA4LIu-r
2-0-0 1-0-9 3-6-8
4-0-0
6-11-0 4-0-0 3-6-8
2-0-0 1-0-q ,
2-0-0 3-0-0 6-6-8
10-6-8
17-5-8 21-5-8 25-0-0
26-0-0 28-0-0
SCREW CITY
WEBS 11-8:10,
1-9:4, 12-7:8, 12-8:8, 13-5:3, 13-6:4,
13-7:5, 14-3:2, 14-4:13, 14-5:11, 15-2:15, 15-3:13, 16-1:4, 16-2:19
Truss weight = 163 Ibs
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
EW VALUE. (#12-14 T/3)
TCLL 20.0
Code
TC 0.93
Vert(LL) 0.25 14
2561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.89
Vert(TL) 0.2 14 999
0
5401b 073 6561b
BCLL 0.0
WB 0.88
Horz(TL) 0 n/a
0
6621b
BCDL 10.0
(Matrix)
'n r gth / deft = 2
#
SECTION 11
CHORD 35 US 046 50 'Except' JO T\44PNG
ORD Sheathed or2-0-0oncenterpurlin spacing 1-5, 5-9
W1 3d2 USWD 035 50, T2 35 USD 035 50, W16 362 USORD 4-0-0 on center bracing 17-10
CHORD 35 US057 50 362CSJ 18ga 33 5-14 Attach to back of member full length
is 362 U FWD 035 50 `Except- w/6-#12-14 sds at each end and 12" oc along length
W3 60'iUSWD 046 50, W4 60 USWD 057 50, W8 362 USWD 046 50
W13 362 USWD 057 50, W14 362 USWD 073 50
OTIONS Ottsize/Ilaterial)16/2-0-0/UKN, 11/2-0-0/UKN
Max DAn 16=4059(load case 1), 11=3022(load case 1)
Max Upljft 16=-8268(load case 2), 11=-5072(load case 2)
'ES (lb) Max. Compression Force
CHORD 1-17=-�04, 1-2=-935, 2-3=-3852, 3-4=-3966, 4-5=-3942, 5-6=-3125, 6-7=-3141, 7-8=-2665, 8-9=-1010, 9-10=-496
CHORD 16-17=L0, 15-16=-235, 14-15=-6354, 13-14=-3693, 12-13=-2772, 11-12=-256, 10-11=-0
S 1-16=38, 2-16=-3776, 2-15=-8056, 3-15=-611, 3-14=-235, 4-14=-512, 5-14=-4835, 5-13=-65, 6-13=-534, 7-13=-1207, 7-12=-1105, 8-12=-4197, 8-11=-2759,
9-11 =-59
1) This truss has beef designed for unbalanced loading conditions.
2) This truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 258.53 sq. ft., 0.6 DL applied. The Left End
Vertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) For truss to truss connection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s).
4) Load case(s) 1, 2, 4, 5, 6 has been modified. Building designer must review loads to verify that they are correct for the intended use of this truss.
5) Attach 35USGP x 2" at location of tie-in trusses - See detail US2US-3B.1
6) Special connections required at joints 15, 14,
7) Tip chord load apli ied at 0-0-0 oc via valley trusses above.
LOAD CASE(S)
1) Live:
Uniform Loads (pl
Vert: 1-2=- 1140.0, 2-3=-140.0, 3-4=-140.0, 4-5=-140.0, 5-6=-140.0, 6-7=-140.0, 7-8=-140.0, 8-9=-140.0, 16-17=-40.0,
15-16=-40. 14-15=40.0, 13-14=-40.0, 12-13=40.0, 11-12=40.0, 10-11=40.0
Concentrated Loa $ (lb)
Vert:15=-1039 14=-1056
2) Wind 1 C&C:
Uiform Loads (plf)i
Vert: 1-2=16.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 6-7=-36.0, 7-8=-36.0, 8-9=-36.0, 16-17=-24.0, 15-16=-24.0,
14-15=-24. 13-14=-24.0, 12-13=-24.0, 11-12=-24.0, 10-11=-24.0
Normal: 1-c=237.1, 2-3=237.1, 3-4=237.1, 4-5=237.1, 5-6=237.1, 6-7=237.1, 7-8=237.1, 8-9=237.1, 16-17=347.0,
10-11=347 0
- Concentrated Loa s (lb)
Vert: 15=3 1 3 14=3256
3) Wind 2 C&C: t,
on page 2
St.Lucie Oaks Commercial Center
0710017
7.16-32 s
Truss Type tatty Ply I russ
COMMON 1 1 LG1
Page 2
LOAD CASE(S)
Uniform Loads (pIt)
Vert: 1-2=-36.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 6-7=-36.0, 7-8=-36.0, 8-9=-36.0, 16-17=-24.0, 15-16=-24.0, 14-15=-24.0, 13-14=-24.0, 12-13=-24.0,
11-12=-2�0, 10-11=-24.0
Normal: 1 2=-82.5, 2-3=-82.5, 3-4=-82.5, 4-5=-82.5, 5-6=-82.5, 6-7=-82.5, 7-8=-82.5, 8-9=-82.5, 16-17=408.8, 10-11=408.8
Concentrated Loads (lb)
Vert: 15=. 22 14=-836
4•) Dead: I
Uniform Loads (pl
Vert: 1-2=-60.0, 2-3=-60.0, 3-4=-60.0, 4-5=-60.0, 5-6=-60.0, 6-7=-60.0, 7-8=-60.0, 8-9=-60.0, 16-17=-40.0, 15-16=-40.0, 14-15=-40.0, 13-14=-40.0, 12-13=-40.0,
11-12=4¢ 0. 10-11=-40.0
Concentrated Loads (lb)
Vert: 15= 577 14=-587
5) 1st unbalanced Li Ia:
Uniform Loads (plD
Vert: 1-2 '140.0, 2-3=-140.0, 374=-140.0, 4-5=-140.0, 5-6=-60.0, 6-7=-60.0, 7-8=-60.0, 8-9=-60.0, 16-17=-40.0, 15-16=-40.0, 14-15=-40.0, 13-14=-40.0, 12-13=-40.0,
11-12=-4�0, 10-11=-40.0
Concentrated Loads (lb)
Vert: 15— 1039 14=-1056
6) 2nd unbalanced !} ve:
Uniform Loads (plf)
Vert: 1-2+60.0, 2-3=-60.0, 3-4=-60.0, 4-5=-60.0, 5-6=-140.0, 6-7=-140.0, 7-8=-140.0, 8-9=-140.0, 16-17=-40.0, 15-16=-40.0, 14-15=-40.0, 13-14=-40.0, 12-13= 40.0,
11-12=-40 0, 10-11=-40.0
Concentrated Logl s (lb)
Vert: 15=i103914=-1056
x=
�r
ki . rs
5
0710017
ROOF TRUSS 11 11 1LG2
s
28 10:30:09
CITY (Total 125). All Screws Are #12-14 T/3
i 1-11:2, 3-2:7, 3-4:7, 5-7:7, 7-5:7, 11-1:2
1-10:5, 2-�:10, 2-10:12, 3-8:2, 3-9:3, 4-8:4, 5-8:9
CITY
3-0-0 3-5-0 4-3-10 _,_ 3-3-6
3-0-0 6-5-0 10-8-10 14-0-0
5.00 12 325US69073x8
11 10 9 12 8 7
G4K
2-0-0 1-0-0 , 3-5-0 4-3-10 3-2-8 0-9T14
2-0-0 3-0-0 6-5-0 10-8-10 13-11-2 14-0-0
?ZK
WEBS
8-3:2, 8 ,14, 8-5:9, 9-2:10, 9-3:3, 10-1:5, 10-2:15
Truss weight = 80 Ibs
LOADING (pso
SPACING 4-0-0
CSI
DEFL
(in) (loc I/d
CR VALUE. (#12-14 T/3)
TCLL 20.0
Code
TC 0.80
Vert(LL)
0.07 T
035 2 Ib 046 4501b
TCDL 15.0
FBC/AISI
BC 0.65
Vert(TL
0.06 8-9 >9
057 5401b 073 6561b
BCLL 0.0
WB 0.48
orz(
0.01 7 n'.�,
097 6621b
BCDL 10.0
(Matrix)
in L gt:
LL d 0
#
STEEL SECTION
TOP CHORD 35 USD
035 50 *Except*
VIRTFIHORD
RD Sheathed or 2-0=0 on center purlin spacing 1-3, 3-6
W1 36�
USWD 035 50, W9 362 USWD 035 50
4-0-0 on center bracing 11-7
BOT CHORD 35 USD 035 50
WEBS 362 Uyy§�WD 035 50 *Except*
W3 601USWD 035 50
'TIONS at/size/t,aterial)710-4-0/USKW, 10/2-0-0/CMU
Max Don 7=1039(load case 1), 10=1683(load case 1)
ll
Max Up!`ft 7=-1790(load case 2), 10=-3704(load case 2)
:ES (lb) Max. Compression Force
CHORD 1-11=-�80, 1-2=-1079, 2-3=-921, 3-4=-820, 4-5=-820, 5-6=0, 5-7=-990
CHORD 10-11 i 1, 9-10=-278, 9-12=-1713, 8-12=-1713, 7-8=-1
S 1-10=481, 2-10=-1478, 2-9=-2362, 3-9=-632, 3-8=0, 4-8=-637, 5-8=-2288
1) Th• is truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
B ilding, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 65.33 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
2) Horizontal load apliiied to this truss resulting from the standard wind load, equal to 685 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
3) For truss to truss nnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
isI delegated to the I uilding designer.
4) Provide adequate r, rainage to prevent water ponding.
5) 35USKW attachedlto truss at Joint 7 with 8 410 sds. Refer to Aegis detail US2US-1.
6) Load case(s) 1, 2, i, 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of
this truss.
7) Aitach 35USGP x 12' at location of tie-in trusses -See detail US2US-3B.1
8) A$ach 35USGPX om 11 to 7 - See details US2US-5.1
9) U,SGP-X capacity xceeded special connections required at 12, 9,
10) Top chord load a lied at 0-0-0 oc via valley trusses above.
LOAD CASE(S)
1) Live:
Uniform Loads (pl
Vert: 1-2=- 40.0, 2-3=-140.0, 3 4=-140.0, 4-5=-140.0, 5-6=-140.0, 10-11=-40.0, 9-10= 40.0, 9-12= 40.0, 8-12= 40.0,
7-8=-40.0
Concentrated Loa s (lb)
Vert: 9=-99 8=-70 12=-70
2) Wind 1 C&C: 11
Uniform Loads (pl
Vert: 1-2=-$6.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 10-11=-24.0, 9-10=-24.0, 9-12=-24.0, 8-12=-24.0,
7-8=-24.0II
Normal: 1-2=252.9, 2-3=252.9, 3-4=242.1, 4-5=242.1, 10-11=347.0
Concentrated Loads' (lb)
Vert: 9=63h 8=666 12=666
I
:ontinued on page 2 1
7
Truss Type �Qty Ply Truss
ROOF TRUSS 1 1 LG2
s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:30:09 2008
LOAD CASE(S)
3) Wind 2 C&C:
Uniform Loads (plf)
j Vert: 1-2 —'
Normal: 1-2
Concentrated Load
Vert: 9=631
4) Dead:
Uniform Loads (plf)
Vert: 1-2=-E
-Concentrated Load
Vert: 9=-55
I
2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 10-11=-24.0, 9-10=-24.0, 9-12=-24.0, 8-12=-24.0, 7-8=-24.0
.8, 2-3=-88.8, 3-4=-68.5, 4-5=-68.5, 10-11=322.0
66 12=666
2-3=-60.0, 34=-60.0, 4-5=-60.0, 5-6=-60.0, 10-11=-40.0, 9-10=40.0, 9-12=-40.0, 8-12=40.0, 7-8=-40.0
9 12=-39
0710017
Truss Type Qty Ply Truss
ROOF TRUSS 1 1 L3
s oep zo zuur aegis rvieca, rreuung,
SCREW QTY (Total, 72). All Screws Are #12-14 T/3
CHORDS 1-10:2, 4 3:3, 4-5:2, 5-7:2, 7-5:5, 10-1:2
WEBS 1-9:5, 2- 4, 3-8:3, 3-9:6. 4-7:4, 4-8:3
3-0-0
3-0-0
6
L6
3-8-8 3-8-8 3-7-0
6-8-8 10-5-0 14-0-0
325US96O73x8
1 al
o o
2
- ^per�\
1 2
10 C3K
2-0-0 1-0-09 ,
7-5-0
8 7
3-6-2 0-QT14
2-0-0 3-0-0
10-5-0
13-11-2 14-0-0
SCREW CITY
WEBS 7-4:4, 8-
:3, 8-4:3, 9-1:5, 9-2:10, 9-3:6
Truss weight = 63 Ibs
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc f1
SC W VALUE. (#12-14 T/3)
TCL' L 20.0
Code
TC 0.75
Vert(LL) 0.0
99
035 61b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.43
Vert 0.0
8-9 9
057 5401b 073 656lb
BOLL 0.0
WB 0.24
Ho TL -0.0
7
097 6621b
BCDL 10.0
(Matrix)
Min ' O- / LL
a -
#
STEEL SECTIONI
N
WOP
TOP CHORD 35 us"D 035 50 *Except*
CHORD
Sheathed or 2-0-0 on center purlin spacing 1-4, 4-6
W1 30, USWD 035 50, W8 362 USWD 035 50
BOT CHORD
4-0-0 on center bracing 10-7
BOT CHORD 35 USD 035 50
WEBS 362 U�WD 035 50
Max
Max
I Max.
1-11
9-1(
aterial)7/0-4-0/USKW, 9/2-0-0/CMU
n 7=934(load case 1), 9=1550(load case 1)
t 7=-1056(load case 2), 9=-2517(load case 2)
npression Force
36, 1-2=-1211, 2-3=-798, 3-4=-609, 4-5=0, 5-6=0, 5-7=-268
8-9=-961, 7-8=-505
), 2-9=-530, 3-9=-1097, 3-8=-565, 4-8=-183, 4-7=-882
1) This truss has been designed for unbalanced loading conditions.
2) This truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , ,�z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 65.33 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) orizontal load applied to this truss resulting from the standard wind load, equal to 1107 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
esigo of which s all be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
4) ,rovide adequate rainage to prevent water ponding.
5) 35USKW attache to truss at Joint 7 with 5 410 sds. Refer to Aegis detail US2US-1.
6) Top chord load aplied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Sta dard
�" II
0710017
ROOF TRUSS 11 11 I M
6-32 s Sep 25 2007
QTY (Total 102). All Screws Are #12-14 T/3
i 1-12:2, 4- :5, 4-5:5, 7-8:2, 8-7:2, 12-1:2
1-11:3. 2- 1:4, 3-10:3, 3-11:6, 4-10:6, 5-9:6, 5-10:3, 6-9:4, 7-9:2
2-6-0 4-1-0 4-1-0 4-2-2 4-2-2 2-3-12
2-6-0 6-7-0 10-8-0 14-10-2 19-0-4 21-4-0
325U-Qb073x8
4
19
o>
ti
I�
0
2i-U-U T1 6-z-U , U-4-4 UliTu &U-IZ
2-0-0 2-6-0 10-8-0 19-0-4 19-3-4 21-4-0
SCREW QTY
WEBS 9-5:6, 9- •9, 9-7.2. 10-3:3, 10-4:6, 10-5:3, 11-1:3, 11-2:9, 11-3:6 Truss weight = 105 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) 120c I/- SC W VALUE. (#12-14T/3)
TCLL 20.0 Code TC 0.76 Vert(LL) 0.04 9 035 61b 046 4501b
TCDL 15.0 FBC/AISI BC 0.39 Ve-0.08 9-10 > 9 057 5401b 073 656lb
BCLL 0.0 WB 0.51 Ho0.0 9 097 6621b
BCDL 10.0 (Matrix) It / LL - #
STEEL SECTION
TOP, CHORD 35 US 046 50 'Except' JUICOHMORD Sheathed or 2-0-0 on center purlin spacing 1-4, 4-7
W1 36P USWD 035 50, W11 362 USWD 035 50 BOT CHORD 4-0-0 on center bracing 12-8
BOT CHORD 35 USD 035 50
WEBS 362 U�WD 035 50
REACTIONS Qt/size/material)11/1-0-0/CMU, 9/0-6-0/LGF
i Max Down 11=1914(load case 1), 9=1871(load case 1)
Max Upik 11=-2260(load case 2), 9=-2151(load case 2)
FORCES (lb) Max. CBmpression Force
TOP CHORD 1-12=�30, 1-2=-613, 2-3=-941, 3-4=-1917, 4-5=-1914, 5-6=-941, 6-7=-546, 7-8=-409
BOT CHORD 11-12 -0, 10-11=-207, 9-10=-259, 8-9=0
WEBS 1-11=i 5, 2-11=-998, 3-11=-1423, 3-10=-731, 4-10=-753, 5-10=-779, 5-9=-1380, 6-9=-995, 7-9=-9
NOTIES
1) This truss has be designed for unbalanced loading conditions.
2) T is truss designe with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance' = 7.90 ft. using a top chord tributary area of 149.57 sq. ft., 0.6 DL applied. The Left End
Vertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) Tbp chord load ap 'lied at 0-0-0 oc via valley trusses above.
LOP D CASE(S) StarI; and
I
i
i
I
duu
0710017
ROOF TRUSS 12 11 I MG
25
CITY (Tota0 191 ). All Screws Are #12-14 T/3
i 1-14:2, 3�2:10, 3-4:12, 5-4:12, 5-6:11, 7-8:2, 8-7:2, 14-1:2
1-13:2, 2 12:9, 2-13:13, 3-11:4, 3-12:3, 4-11:4, 5-10:3, 5-11:4, 6-9:13, 6-10:8, 7-9:2
L9
0
ui
2-6-0 4-0-8 4-1-8 4-1-8 4-3-8 2-3-0
2-6-0 6-6-8 10-8-0 14-9-8 19-1-0 21-4-0
325USVP73x10 325USAD073x10
3 To
ao
0
2-0-0 9-6-p 4-0-8 4-1-8 4-1-8 4-3-8 013r0 2-0-0
2-0-0 2-6-0 6-6-8 10-8-0 14-9-8 19-1-0 19-4-0 21-4-0
SCREW CITY
WEBS 9-6:15, 9!�:2, 10-5:5, 10-6:8, 11-3:4, 11-4:4, 11-5:4, 12-2:9, 12-3:5, 13-1:2, 13-2:15
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) lLde
TCLL 20.0
Code
TC 0.93
Vert(LL) 0.10 11 99
TCDL 15.0
FBC/AISI
BC 0.42
Vert(TL) 0.0 999
BCLL 0.0
WB 0.46
Ho -0. 9 /a
BCDL 10.0
(Matrix)
M ngth / L efl = 26JD
STEEL SECTION
TOP CHORD 35 t
W1
BOT CHORD 35 (
WEBS 362
1 W3
Max
Max.
1 1-14
13-1
1-13
1) This truss has bee
2) Tpis truss designE
Building, I = 1.00 ,
Vertical and Right
3) FPor truss to truss
is delegated to the
4) Provide adequate
5) Load case(s) 1, 2,
6) Attach 35USGP >
7) Top chord load ap
1
LOAD CASE(S) Stai
1) L''Ye:
Uniform Loads (pll
Vert:1-2=.
i 10-11=-40
Concentrated Loai
Vert: 12=!
2) Wind 1 C&C:
Uniform Loads (plt
Vert: 1-2=-
9-10=-24
1 Normal:l-
Concentrated Loan
Vert: 12=1
3) Wind 2 C&C:
Uniform Loads (pif
Vert: 1-2=-
, 9-10=-24
Normal: 1-
;ontinued on page 2
Truss
t = EW VALUE. (#12-14 T/3)
0381256lb 046 4501b
05YlE40lb 073 6561b
097 6621b
035 50 *Except* VWrORD Sheathed or 2-0-0 on center purlin spacing 1-3, 3-5, 5-7
USWD 035 50, W13 362 USWD 035 50 ORD 4-0-0 on center bracing 14-8
03550
VD 035 50 *Except*
SWD 035 50, W11 60 USWD 035 50
iterial)13/1-0-0/CMU, 9/0-6-0/LGF
I 13=2579(load case 1), 9=2502(load case 1)
13=-3829(load case 2), 9=-3639(load case 2)
ipression Force
�4, 1-2=-479, 2-3=-1908, 3-4=-1941, 4-5=-1941, 5-6=-2000, 6-7=-379, 7-8=-328
i, 12-13=-97, 11-12=-1411, 10-11=-1509, 9-10=-31, 8-9=-0
i, 2-13=-2375, 2-12=-2118, 3-12=-555, 3-11=-1030, 4-11=-707, 5-11=-880, 5-10=-601, 6-10=-2028, 6-9=-2303, 7-9=-31
designed for unbalanced loading conditions.
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33:8 ft., Exposure Category C, Enclosed
:z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 149.57 sq. ft., 0.6 DL applied. The Left End
nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
nnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
ainage to prevent water ponding.
4 has been modified. Building designer must review loads to verify that they are correct for the intended use of this truss
2" at location of tie-in trusses - See detail US2US-3B.1
ad at 0-0-0 oc via valley trusses above.
and Except:
10.0, 2-3=-140.0, 3-4=-140.0, 4-5=-140.0, 5-6=-140.0, 6-7=-140.0, 13-14=40.0, 12-13=-40.0, 11-12=40.0,
9-10=40.0, 8-9=40.0
(lb)
i 11=-223 10=-536
.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 6-7=-36.0, 13-14=-24.0, 12-13=-24.0, 11-12=-24.0, 10-11=-24.0
8-9=-24.0
202.7. 2-3=202.7, 3-4=219.9, 4-5=219.9, 5-6=202.7, 6-7=202.7, 13-14=312.6, 8-9=312.6
(lb)
3 11=588 1 0=1 173
.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 6-7=-36.0, 13-14=-24.0, 12-13=-24.0, 11-12=-24.0, 10-11=-24.0
8-9=-24.0
•168.3, 2-3=-168.3, 3-4=-65.3, 4-5=-65.3, 5-6=-168.3, 6-7=-168.3, 13-14=374.5, 8-9=374.5
0710017
Oaks
s
ROOF TRUSS 12 11 I MG
Vert: 12=1
4) Dead:
Uniform Loads (pll
Vert: 1-2=-
Concentrated Loaq
Vert: 12=-:
Except:
1=588 1 0= 1173
), 2-3=-60.0, 3-4=-60.0, 4-5=-60.0, 5-6=-60.0, 6-7=-60.0, 13-14=-40.0, 12-13=-40.0, 11-12=-40.0, 10-11=-40.0, 9-10=-40.0, 8-9=40.0
b)
11=-124 10=-298
m,�' .fir
F X
0017 11 1 1 ROOF TRUSS 11 11 1 N
s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:30:13 2008 Page 1
CITY (To ' I = 95 ). All Screws Are #12-14 T/3
S 1-10:2, 4-3:5, 4-5:5, 6-7:2, 7-6:8, 10-1:2
1-9:2, -9:4, 3-8:3, 3-9:6, 4-8:6, 5-7:8, 5-8:4
2-4-0 4-2-0 4-2-0 , 4-1-13 4-5-7
2-4-0 6-6-0 10-8-0 14-9-13 19-3-4
325US96073x6
4
4
j
�
2
N
2
Jag
O
2 2
9 6
3
8 8
Qo
a0I
i
O 2
�0 i c 3K
s
7 LZK
2-0-0 Or410 8-4-0
8-7-4
2-0-0 2-4-0 10-8-0
19-3-4
SCREW
QTY
WEBS
7-5:8, 8:
:3. 8-4:6, 8-5:4, 9-1:2, 9-2:9, 9-3:6
AVuss weight = 96 Ibs
LOADING
(psf)
SPACING 4-0-0
CSI
DEFL
(in) (loct
R LIE. (#12-14 T/3)
TC((-L
20.0
Code
TC 0.86
Vert(LL)
0.05 7-
561b 6 4501b
TCCL
15.0
FBC/AISI
BC 0.47
Vert(TL)
7-
5401b 3 6561b
BULLL
0.0
WB 0.82
Ho z L)
.03
09
6621b
BCDL 10.0
1
(Matrix)
gth
%i
fl =
#
STEEL SECTION
B N
TOP CHORD 35 U
D 046 50 'Except'
T
RD Sheathed or 2-0-0 on center purlin spacing 1-4, 4-6
W1 3'2
USWD 035 50, W9 362 USWD 035 50
BOT CHORD 4-0-0 on center bracing 10-7
BOT CHORD 35 U
D 035 50
WEBS 362 1jSWD
035 50
REACTIONS at/sizeaterial)7/0-6-0/LGF, 910-8-0/CON
Max D wn 7=1953(load case 3), 9=1929(load case 1)
Max U ilift 7=-1152(load case 2), 9=-2237(load case 2)
FORCES (lb) Max. (, mpression Force
TOP CHORD 1-10 ��408, 1-2=-548, 2-3=-936, 3-4=-1905, 4-5=-1918, 5-6=-252, 6-7=-470
BOT CHORD 9-10=b, 8-9=-614, 7-8=-733
WEBS 1-9=- 6, 2-9=-996, 3-9=-1477, 3-8=-782, 4'8=-885, 5-8=-740, 5-7=-1903
NOTES
1) This truss has beelr designed for unbalanced loading conditions.
2) This truss design 0. with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 121.86 sq. ft., 0.6 DL applied. The Left End
Vertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) orizontal load applied to this truss resulting from the standard wind load, equal to 297 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which s'311 be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
4) lop chord load al lied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Stadard
0710017
Truss Type Qty Ply Trus
ROOF TRUSS 2 1 N1G
7.16-32 s
Mon Apr 28 1
QTY (Tot ' I = 160). All Screws Are #12-14 T/3
S 1-12:2, -2:9, 3-4:11, 5-4:11, 5-6:10, 6-7:10, 7-6:10, 12-1:2
1-11:2, -10:7. 2-11:12, 3-9:4, 3-10:2, 4-9:4, 5-8:3, 5-9:4, 6-8:7
2-4-0 4-2-8 4-1-8 4-1-8 4-5-12
2-4-0 6-6-8 10-8-0 14-9-8 19-3-4
19
0
LO
325USER073x8 325UW073x8
�F' P
2-0-0 2-4-0 6-6-8 vOW0-1}0VA WN" 'Wz0v 19-3-4
SCREW CITY
WEBS 8-5:4, 8 :7. 9-3:4, 9-4:4, 9-5:4, 10-2:7, 10-3:4, 11-1:2, 11-2:14 Truss weight = 95 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.95 Vert(LL) 0.09 9 >999 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.41 Vert(TL) 0.07 9 >999 057 5401b 073 6561b
BCLL 0.0 WB 0.39 Horz(TL) -0.02 7 n/a 097 6621b
BCDL 10.0 (Matrix) Min Length / LL defl = 240 #
i
STEEL SECTION BRACING
TOO CHORD 35 U D 035 50 'Except' TOP CHORD Sheathed or 2-0-0 on center purlin spacing 1-3, 3-5. 5-6
W1 3 2 USWD 035 50, W11 60 USWD 035 50 BOT CHORD 4-0-0 on center bracing 12-7
BOT CHORD 35 U D 035 50
WEBS 362 L §WD 035 50 `Except`
W3 6 . USWD 035 50
:TIONS Qt/sizeaterial)7/0-6-0/LGF, 11/0-8-0/CMU
Max D 3wn 7=1887(load case 1), 11=2332(load case 1)
Max U Rift 7=-2342(load case 2), 11=-3428(load case 2)
:ES (lb) Max. bmpression Force
CHORD 1-12 344, 1-2=-415, 2-3=-1764, 3-4=-1817, 4-5=-1817, 5-6=-1768, 6-7=-1817
CHORD 11-1 0, 10-11=-58, 9-10=-1548, 8-9=-1636, 7-8=-1
S 1-11459, 2-11=-2138, 2-10=-1806, 3-10=-348, 3-9=-1047, 4-9=-707, 5-9=-913, 5-8=-584, 6-8=-1793
1) This truss has be In designed for unbalanced loading conditions.
2) his trusesigne 0 with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 „Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 120.60 sq. ft., 0.6 DL applied. The Left End
Vertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) Horizontal load ape lied to this truss resulting from the standard wind load, equal to 311 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which s II be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
4) For truss to truss ' nnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
is delegated to thE building designer.
5) Provide adequate drainage to prevent water ponding.
6) .oad case(s) 1, 2„ 3, 4 has been modified. Building designer must review loads to verify that they are correct for the intended use of
this truss. i
7) A tach 35USGP .12" at location of tie-in trusses - See detail US2US-3B.1
8) I5p chord load ap' lied at 0-0-0 oc via valley trusses above.
LOAD CASE(S) Sta dard Except:
1) Live:
Uniform Loads (pl
Vert: 1-2= 140.0, 2-3=-140.013-4=-140.0, 4-5=-140.0, 5-6=-140.0, 11-12=-40.0, 10-11=-40.0, 9-10=-40.0, 8-9=-40.0,
1 7-8=-40.0
Concentrated Loa s (lb)
Vert: 10=- 81 9=-260 8=-281
'2) Wind 1 C&C:
Uniform Loads (pl
Vert: 1-2= 36.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 11-12=-24.0, 10-11=-24.0, 9-10=-24.0, 8-9=-24.0,
7-8=-24.0 'I
Normal: 1=202.7, 2-3=202.7, 3-4=219.9, 4-5=219.9, 5-6=202.7, 11-12=312.6
Concentrated Loa s (lb)
Vert: 10=8 D3 9=647 8=803
3) Wind 2 C&C:
:ontinued on page 2
0710017
ROOF TRUSS 12 11 I N1G
LOAD CASE(S) S
Uniform Loads I
Vert: 1
Normal:
Concentrated b
Vert: 10
4) Dead:
Uniform Loads
Vert: 1
Concentrated Li
Vert: 10
and Except
i.0, 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 11-12=-24.0, 10-11=-24.0, 9-10=-24.0, 8-9=-24.0, 7-8=-24.0
-168.3, 2-3=-168.3, 34=-65.3, 4-5=-65.3, 5-6=-168.3, 11-12=374.5
(lb)
9=647 8=803
30.0, 2-3=-60.0, 34=-60.0, 4-5=-60.0, 5-6=-60.0, 11-12=-40.0, 10-11=40.0, 9-10=40.0, 8-9=-40.0, 7-8=-40.0
s (lb)
56 9=-144 8=-156
.k
�_yti 1
J
Job St.Lucie Oaks Commercial Center I cuss I ype a tty myI russ
0710017 ROOF TRUSS 8 1 PBA
The Monarch Compal' y 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:30:16 2008 Page 1
SCREW QTY (Total 49 ). All Screws Are #12-14 T/3
CHORDS 2-3:2, 514:2, 5-6:2, 8-7:2
WEBS 3-14:3, 1 13:5, 5-12:2, 6-11:5, 7-10:3
3-8-0 4-0-0 4-0-0 4-0-0 4-0-0 3-8-0
3-8-0 7-8-0 11-8-0 15-8-0 19-8-0 23-4-0
i
4.50 12 325USJD073x8
ri
4
5USJD073x1214 13 12 11
275USHDO57 USE 3# M lfEL Scq)WS Al EACH
4412-14 T/3 _MUM'TO VALLEJ CO W OFX.'i t A4 .
QTY
5 2-14:2, 8710:2
3-8-0
4-0-0
3-8-0 7-8-0 11-8-0 15-8-0
2-5:3, 13-4:5, 14-3:3
D]
1 925USJD073x12
6" 275USHDO57
w/4412-14 T/3
19-8-0 23-4-0
Truss
= 68 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCR W LUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.71 Vert(LL) n/a n/a 3 46 4501b
TCDL 15.0 FBC/AISI BC 0.09 Vert(TL) n/a n/a 5 1 73 6561b
BOLL 0.0 WB 0.13 Horz(TL) 0.00 n/a 621b
BCDL 10.0 (Matrix) Min Length / LL deft = 99911081.
#
1
STEEL SECTION BRACING
U TOP CHORD 35 D 035 50 TOP CH W SheatUdor2-:1'0`8RTnterpurlin spacing 1-5, 5-9
BOT CHORD 35 USb 035 50 BO CH -0-0 racing 2-8
WEBS 362 UIISWD 035 50
REACTIONS at/size/I aterial)1/23-4-0/UKN, 9/23-4-0/UKN, 2/23-4-0/UKN, 8/23-4-0/ !U 13/23-4-0/UKN, 14/23-4-0/UKN, 11/23-4-0/UKN, 10/23-4-0/UKN
Max Down 1=58(load case 1), 9=58(load case 1), 2=226(load case s 8=2 I case 1), 12=549(load case 1), 13=817(load case 1), 14=585(load case 5),
11=817(load case 1), 10=585(load case 6)
Max Uplift ift 1=-35(load case 2), 9=-35(load case 2), 2=-77(load case 2 , 8=-77(load case 2), 12=-264(load case 2), 13=-988(load case 2), 14=-670(load case 2),
11=-988(load case 2), 10=-670(load case 2)
Max 118rizontal 1=6(load case 5), 9=-6(load case 6), 2=53(load case 1), 8=-53(load case 1), 14=3(load case 1), 10=-3(load case 1)
i
FOR, (lb) Max. mpression Force
TOP CHORD 1-2=-,h, 2-3=-363, 3-4=-153, 4-5=-188, 5-6=-188, 6-7=-153, 7-8=-363, 8-9=-21
BOT CHORD 2-14=16, 13-14=0, 12-13=0, 11-12=0, 10-11=0, 8-10=-6
WEBS 5-12=T391, 4-13=-651, 3-14=-448, 6-11=-651, 7-10=-448
truss has be
truss design
ling, I = 1.00
)city Pressure
zontal load a
gn of which
truss to be t
ical webs she
chord load a
CASE(S) St,
designed for unbalanced loading conditions.
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt =1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 169.56 sq. ft., 0.6 DL applied. Design
h = 42.94 psf.
ed to this truss resulting from the standard wind load, equal to 429 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
1 as valley truss only.
ne up with truss top chords supporting this valley truss (within 3.0" center to center).
ed at 0-0-0 oc via valley trusses above.
)I10017
Truss Type Qty I Ply Truss
ROOF TRUSS 1 1 PBA1
Tlhe Monarch C
SCREW QTY
CHORDS 2-3
WEBS 3-1
I
i
. I.
7.16-32 s Sep 25 2007
:al = 52 ). All Screws Are #12-14 T/3
t-3:2, 4-5:2, 6-5:2, 6-7:2, 8-7:2
4-13:3, 5-12:4, 6-11:3. 7-10:4
3-8-0 4-0-0 4-0-0 4-0-0 4-0-0 3-8-0
3-8-0 7-8-0 11-8-0 15-8-0 19-8-0 23-4-0
1
4.50F12
325USJD073x10
325USJD073x10
325USJD073x1214 13 12 11 1 925USJD073x12
6" 275USHDO57 Use 3 4 11- t- ic ncegw5 A EACL-) 6" 275USHDO57
w/4-#12-14 T/3 -TIZUSS -M IfArLL" CONWS"I Ot'. W/4412-14 T/3
i
3-8-0 4-0-0 4-0-0 4-0-0 4-0-0 3-8-0
SCREW QTY
3-8-0 7-8-0 11-8-0 15-8-0 19-8-0 23-4-0
j
CHORDS 2-14:2, -10:2
E
WEBS 10-7:4,
;�j 1-6:3, 12-5:4, 13-4:3, 14-3:4 a, Truss weight = 67 Ibs
I
LOADING (psf)
I SPACING 4-0-0
CSI
DEFL (in) (loc) I/defl
ALUE. (#12-14 T/3)
. C140lb
TCLL 20.0
Code
TC 0.64
Vert(LL) n/a n/
3046 4501b
TCDL 15.0
FBC/AISI
BC 0.09
Vert(TL) n/a
05073 6561b
BCLL 0.0
WB 0.12
Horz(TL) 0.00 nY
097 6621b
BCDL 10.0
(Matrix)
Min Length ! LL de - 999
#
STEEL SECTION
RA G vfto
TOP CHORD 35 U D 035 50 P C Sheathed or 2-0-0 on center purlin spacing 1-4, 4-6, 6-9
BOT CHORD 35 U D 035 50 + T C 4-0-0 on center bracing 2-8
WEBS 362 SWD 035 50
Max
Max
Max
:ES (lb) Max.
CHORD 1-2=
CHORD 2-V
1) This truss has be
2) his truss design
uilding, I = 1.00
3) Horizontal load aF
design of which sl
4) Provide adequate
5) This truss to be u;
6) Vertical webs sha
7) Tap chord load aF
LOAD CASE(S) Sta
naterial)1/23-4-0/UKN, 9/23-4-0/UKN, 2/23-4-0/UKN, 8/23-4- ' KN, /23-4-0/UKN, 13/23-4-0/UKN, 14/23-4-0/UKN, 11/23-4-0/UKN, 10/23-4-0/UKN
wn 1=89(load case 1), 9=89(load case 1), 2=134(load cas 1), 8=134(load case 1), 12=856(load case 1), 13=588(load case 5), 14=723(load case 1),
11=588(load case 6), 10=723(load case 1)
lift 1=-86(lcad case 2), 9=-86(load case 2), 12=-822(load case 2), 13=-470(load case 2), 14=-898(load case 2), 11=470(load case 2), 10=-898(load case
2)
rizontal 1=-5(load case 1), 9=5(load case 1), 2=49(load case 1), 8=-49(load case 1), 14=3(load case 1), 10=-3(load case 1)
)mpression Force
1, 2-3=-299, 3-4=-166, 4-5=-97, 5-6=-97, 6-7=-166, 7-8=-299, 8-9=-21
5, 13-14=0, 12-13=0, 11-12=0, 10-11=0, 8-10=-6
599, 4-13=-423, 3-14=-586, 6-11=-423, 7-10=-586
i designed for unbalanced loading conditions.
i with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 169.56 sq. ft., 0.6 DL applied. Design
qh = 42.94 psf.
died to this truss resulting from the standard wind load, equal to 322 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
all be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
Irainage to prevent water ponding.
:d as valley truss only.
line up with truss top chords supporting this valley truss (within 3.0" center to center).
,lied at 0-0-0 oc via valley trusses above.
Job St.Lucie Oaks Commercial Center Truss Type Qty Ply Truss
0710017 ROOF TRUSS 1 1 PBA2
I
The Monarch Como nv 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:30:19 2008 Page 1
QTY (Tot , = 46). All Screws Are 012-14 T/3
i 2-1:2, 3 2:2, 3-4:2, 7-6:2, 7-8:2, 8-7:2
3-14:2, 13:4, 5-12:3, 6-11:4, 7-10:2
3-8-0 4-0-0 4-0-0 4-0-0 4-0-0 3-8-0
3-8-0 7-8-0 11-8-0 15-8-0 19-8-0 23-4-0
�I
4.50 12
I
SCREW QTY
CHORDS 2-14:2, 1
WEBS 10-7:2, '
325USJD073x10
325USJD073x10
25USJD073x1214 13 12 11 1 925USJD073x12
" 275USHDO57 USE 3 # 11-Ter- cseQrws 4Q 6" 275USHDO57
r/4-#12-14 T/3 w/4-#12-14 T/3
EAre N 112JUSS -iD VALL" cOt4NZC-- M.
3-8-0 4-0-0 4-0-0 4-0-0 4-0-0 3-8-0
3-8-0 7-8-0 11-8-0 15-8-0 19-8-0 23-4-0
10:2
1-6:4, 12-5:3, 13-4:4, 14-3:2
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
SCREW VALUE. (#12-14 T/3)
TCLL 20.0
Code
TC 0.47
Vert(LL) n/a n
035 2561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.09
Vert(TL) n/a
057 5401b 073 6561b
BOLL 0.0
WB 0.10
Horz(TL) 0.00 emillowiO976621b
BCDL 10.0
(Matrix)
Min Length /.LL qfl 999
STEEL SECTION
TOP CHORD 351
BOT CHORD 35 l
WEBS 362
REACTIONS Qt/siz
Max
Max Uplift
Max f-
FORCES (lb) Max. (
TOP CHORD 1-2=-
BOT CHORD 2-14:
WEBS 5-12=
NOTES
1) This truss has be.
2) This truss design(
Building, I = 1.00
Velocity Pressure
3) Horizontal load aF
design of which sl
4) Provide adequate
5) This truss to be u:
6) Vertical webs she
7) Tiop chord load aF
LOAD CASE(S) Sta
03550 OP CHO D S athed or 2-0-0 on center purlin spacing 1-3, 3-7, 7-9
03550 T CHO 0-0 on center bracing 2-8
VD 035 50
1/23 4-0/UKN, 9/23-4-0/UKN, 2/23-4-0/U N30 2/23-4-0/UKN, 13/23-4-0/UKN, 14/23-4-0/UKN, 11123 4-0/UKN, 10/23-4-0/UKN
1=41(load case 2), 9=41(load case 2)2=3 (los€r1), 8=338(load case 1), 12=678(load case 5), 13=805(load case 1), 14=467(load case 5),
11=805(load case 1), 10=467(load case 6)
1=-11(load case 3), 9=-11(load case 3), 2=-384(load case 2), 8=-384(load case 2), 12=-590(load case 2), 13=-741(load case 2), 14=-387(load case 2)
, 11=-741(load case 2), 10=-387(load case 2)
1=24(load case 5), 9=-24(load case 6), 2=-14(load case 5), 8=14(load case 6), 14=3(load case 4), 10=-3(load case 1)
1pression Force
2-3=-75, 3-4=-18, 4-5=-19, 5-6=-19, 6-7=-18, 7-8=-75, 8-9=-21
13-14=0, 12-13=0, 11-12=0, 10-11=0, 8-10=-6
1, 4-13=-639,3-14=-330, 6-11=-639, 7-10=-330
designed for unbalanced loading conditions.
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 169.56 sq. ft., 0.6 DL applied. Design
h = 42.94 psf.
ad to this truss resulting from the standard wind load, equal to 211 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
ainage to prevent water ponding.
J as valley truss only.
ne up with truss top chords supporting this valley truss (within 3.0" center to center).
ad at 0-0-0 oc via valley trusses above.
Jog j St,Lucie Oaks Commercial Center Truss Type Qty Ply Truss
0710017 COMMON 7 1 PBB
THP Mnnarnh r:nm inv 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Tue Apr 29 13:51:55 2008 Page 1
CITY (Tot l = 175). All Screws Are #12-14 T/3
3 2-11:2, 4-3:15, 4-5:9, 6-7:3, 7-6:3, 11-2:2
2-10:8, -9:12, 3-10:7, 4-9:11, 5-8:7, 5-9:11, 6-8:7
1-4-11 3-11-0
-1-4-11 3-11-0
4.50 12
0
M
2-5-0 2-5-0 3-11-0
6-4-0 8-9-0 12-8-0
325US41Y073x8
'i�i rey4 beck -� -n"s
3-11-0 0-,A-0 2-4-0
3-11-0 4-0-0 6-4-0
T C44AWNEL
CITY
5
2 11 7 7 IO
ao
0
3
0 Zhu 14 9q. STI AP iW Yr{a f�tG6�R�ACt -la SZ �
$ #4 12-wt sc28Ns
0724 2-1-12 3-11-0
6-6-4 8-9-0 (Z-ie-:&Cn-wS MmNt:1. z io siur
6-7 4
WEBS
8-5:7, 8'
:7, 9-3:12, 94:26, 9-5:11, 10-2:8, 10-3:7 Truss weignt = sti ins
LOADING (psf)
SPACING 4-0-0
CSI
DEFL (in) (loc) I/deft
W VALUE. (#12-14 T13)
TCLL 20.0
Code
TC 0.96
Vert(LL) 0.19 7-8 > -
03 561b 046 4501b
TCDL 15.0
FBC/AISI
BC 0.71
Vert(TL) 0.17 > 7
057 01 073 6561b
BCLL 0.0
WB 0.36
Horz(TL) 0.00 /a
097 6621b
BCDL 10.0
(Matrix)
Min Le th / LL ufl = 240
#
STEEL SECTION
B N
TO,P CHORD 35 U
D 035 50 *Except* TO ORD Shea ad or 2-0-0 on center purlin spacing 1-4, 4-6
W1
2 USWD 035 50, T2 35 USD 046 50, W9 362 USWD 0 50 OT : D 4-0-0 on center bracing 11-7
BOT CHORD 35 U
1�1
035 50
WEBS 362
WD 035 50 *Except*
W5 60
USWD 035 50
RE NCTIONS at/size�
aterial)11/0-2-0/UKN, 10/0-2-0/UKN, 9/0-2-0/UKN
Max Dbwn
11=417(load case 5), 10=1800(load case 3), 9=2304(load case 1)
Max U
Aft 11=-190(load case 2), 10=-409(load case 6), 9= (load case 2)
r 24M
FORCES (Ib) Max.
impression Force
TOP CHORD 2-11
1355, 1-2-0, 2-3=-1540, 3-4=-3706, 4-5=-3685, 5-6=-1763, 6-7=-592
BOT CHORD 10-1]L-190,
9-10=-512, 8-9=-552, 7-8=-1
WEBS 2-104�
15, 3-10=-1804, 3-9=-961, 4-9=-1083, 5-9=-872, 5-8=-1572, 6-8=-556
2)
3)
4)
truss has be designed for unbalanced loading conditions.
truss design'J with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
ling, I = 1.00 Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 63.99 sq. ft., 0.6 DL applied. The Left End
ical and Right, End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
zontal load a ` lied to this truss resulting from the standard wind load, equal to 190 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
gn of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections
chord load a4lied at 0-0-0 oc via valley trusses above.
CASE(S) StaDdard
1
0710017
The Monarch Comr
SCREW QTY (Tot
CHORDS 2-15:2,
WEBS 2-14:8.
CITY
LOADING (psf)
TCLL 20.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
STEEL SECTION
TOP CHORD 351
I W1
BOT CHORD 351
WEBS 362
1 W7
Max'.
Maxi
i Max.
2-15
14-1
COMMON 11 11 j PBB1
s
�l = 207). All Screws Are #12-14 T/3
3-2:7, 3-4:6, 7-6:6, 7-8:4, 8-9:2, 9-8:2, 15-2:2
3-13:9, 3-14:3. 4-13:2, 5-11:8, 5-12:19, 5-13:15, 6-11:2, 7-10:4. 7-11:11, 8-10:4
1-4-11 2-4-0 1-7-0 2-7-4 2-2-12 1-7-0 2-4-0
-1-4-11 2-4-0 3-11-0 6-6-4 8-9-0 10-4-0 12-8-0
4.50 12
325USJD073x8
011 4
325USJD073x8
6 02
3 9 5 15 96M 8 111,2 11 4 V 4 3 T9
0 0 00 o o 0 1
O
2 2
1 14 /13 11 10 9
* 11 Tc IC , eea4 S " f> W It" S �#' 12 -Mrs
1P1"4 P,-AeC -muss -to 29 149Q sTR1+-
I $bra• 4La-r C1,ar,n�) ltsw 611p TO P"4 &A41L ' MP5
2-4-0 1-7-0 0-,1-0 2-6-4 0-,1-0 2-1-12 1-7-0 2-4-0
2-4-0 3-11-0 4-0-0 6-6-4 6-7-4 8-9-0 10-4-0 12-8-0
11-6:2. 11-7:11. 12-5:22. 13-3:9. 13-4:5. 13-5:15. 14-2:8. 14-3:3 ® Truss weight= 69 Ibs
SPACING 4-0-0 CSI DEFL (in) (loc) I/deft ;R VALUE. (#12-14 T/3)
Code TC 0.97 Vert(LL) 0.32 9 >448 5 25 046 4501b
FBC/AISI BC 0.88 Vert(TL) 0.29 9 >49 057 540 b 073 6561b
WB 0.62 Horz(TL) 0.02 ! 97 6621b
- (Matrix) Min Length / LL defl ,240 #
) 035 50 'Except' T • P C Sheath-e- or 2-0-0 on center purlin spacing 1-3, 3-7, 7-8
2 USWD 035 50, T2 35 LSD 057 50, W13 362 USWD 035 CH D 4-0-0 on center bracing 15-9
) 057 50
;WD 035 50 `Except*
USWD 035 50, W8 362 USWD 057 50
iaterial)15/0-2-0/UKN, 13/0-2-0/1.10, 1210-2-0/UKN
vn 15=346(load case 5), 13=1277(load case 3), 12=2017(load case 6)
ift 15=-50(load case 6), 12= '.(load case 2)
mpression Force
107, 1-2=0, 2-3=-1617, 3-4=-3218, 4-5=-3218, 5-6=-2920, 6-7=-2920, 7-8=-983, 8-9=-363
•192, 13-14=-467, 12-13=-2238, 11-12=-2238, 10-11=-332, 9-10=-1
i76, 3-14=-566, 3-13=-898, 4-13=427, 5-13=-3754, 5-12=-1720, 5-11=-4221, 6-11=-351, 7-11=-886, 7-10=-922, 8-10=-339
1) This truss has begn designed for unbalanced loading conditions.
2) This truss designed with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Huilding, I = 1.00 I' Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 63.99 sq. ft., 0.6 DL applied. The Left End
1/ertical and Righ IEnd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) Horizontal load al plied to this truss resulting from the standard'wind load, equal to 190 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which s all be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
4) Provide adequate drainage to prevent water ponding.
5) Top chord load applied at 0-0-0 oc via valley trusses above.
l LOAD CASE(S) Standard
�- II
0710017
ROOF TRUSS 111 11 1 PBD
s
2008
SCREW CITY (Total= 18 ). All Screws Are #12-14 T/3
CHORDS 2-1:3, 3- :2. 3-4:2, 4-3:3
WEBS 3-6:2
3-9-12
3-9-12
8.00 12
I
N
i
2
3
1 2
325USJD073x8
6" 275USHDO57
w/4-#12-14 T/3
3-9-12
3-9-12
SCREW CITY
CHORDS 2-6:2, 4 :2
WEBS 6-3:2 1
LOADING (psf)
TCLL 20.0
TCDL 15.0
BOLL 0.0
BCDL 10.0
STEEL SECTION
TOP CHORD 35 1
BOT CHORD 35 1
WEBS 362
i
REACTIONS QUsiz
Max
Max
Max
FORCES (lb) Max.
TOP CHORD 1-2=
BOT CHORD 2-6=
has bE
design
= 1.00
ressurE
load a
which E
tobeL
abs shE
load a
AD CASE(S) Sta
3-9-12
7-7-8
325UT9073x6 (3) 1LbwS O 14
3' hw� 6-0'r'ne \ SGIZ>raW16Y�
-10-nWss sS tei.Ow W rr4
C
2 (3� it 12 sM AT E AGH
-T )JSS �1 GC- 4 �C.
1 �k5'Cti7NEn -[b 0AT W 1TA
(3) s5:* 12@ 3
4 LOCA'710NS
z 3 5
0 00 z 1
._ T �+
325USJD073x8
6" 275USHDO57
w/4412-14 T/3
7-7-8
0
SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SI
Code TC 0.38 Vert(LL) n/a - n/a
FBC/AISI BC 0.05 Vert(TL) n/a
WB 0.04 Horz(TL) 0.00 a Of
(Matrix) Min Length / LL de - 9 ,
BR&GJNG
1 035 50 CHORD hea , or 2-0-0 on center purlin spacing 1-3, 3-5
103550 B ORD - n center bracing 2-4
3WD 035 50
natedal)1/7-7-8/UKN, 5/7-7-8/UKN, 2/7-7-8/UKN, 4/7-7- - - N
wn 1=149(load case 2), 5=149(load case 2), 2=714( d ca 3 , 4=714(load case 3), 6=389(load case 3)
lift 1=-130(load case 3), 5=-130(load case 3), 2=-579 ad case 2), 4=-579(load case 2), 6=-182(load case 2)
rizontal 1=66(load case 1), 5=-66(load case 1), 2=-23(load case 5), 4=23(load case 6)
)mpression Force
3, 2-3=-197, 3-4=-197, 4-5=-28
4-6=-6
)9
i designed for unbalanced loading conditions.
I with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Cz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 28.72 sq. ft., 0.6 DL applied. Design
Ih = 42.94 psf.
lied to this truss resulting from the standard wind load, equal to 301 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
ill be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
;d as valley truss only.
line up with truss top chords supporting this valley truss (within 3.0" center to center).
lied at 0-0-0 cc via valley trusses above.
Truss weight = 21 Ibs
IEW VALUE. (#12-14 T/3)
2561b 046 4501b
5401b 073 6561b
6-32 s
Truss Type Qty Ply Truss
ROOF TRUSS 1 1 PBK
Apr 28 1
QTY (Tot l =18 ). All Screws Are #12-14 T13
5 2-1:2, 2:2, 3-4:2, 4-5:2, 5-4:2
3 �'
I �
SCREW QTY
CHORDS 2-6:2
WEBS 6-3:3
(psf)
20.0
15.0
0.0
10.0
STEEL SECTION
TOP CHORD W2
BOT CHORD 351
WEBS 362
Max
Max
Max
:ES (lb) Max.
CHORD 1-2=
CHORD 2-6=
3-8-0
7-4-0
4.50 F12
325USJD073x8 4
303
" 3 O
12
W1 W2
I
325USJD073x12
6 5iGQS� 275USHDO57 C%j� IZ rtE C 6 V-VE 4 i{ $11
w/4-#12-14 T/3
3-8-0
3-8-0 7-4-0
SPACING 4-0-0
Code
FBC/AISI
CSI
TC 0.58
BC 0.07
WB 0.08
(Matrix)
DEFL (in) (loc) I/deft
Vert(LL) n/a - n/a
Vert(TL) n/a - n/a
Horz(TL) 0.00 n/a
Min Length / LL deft = 999 A00404S,
BRACING
D 035 50 'Except"
USWD 035 50
TOP CHORD Sh ttled or 2 o me;2
BOT D 4-0 ce ter raei g 2-5
D 035 50
5WD 035 50
,naterial)1/7-4-0/UKN, 5/7-4-0/UKN,
2/7-4-0/UKN, 6/7-4-0/U
iwn 1=47(load case 2), 5=303(load
case 1), 2=330(load
a 1), - load case 1)
lift 1=-13(load case 3), 5=-404(load
case 2), 2=459(load
se 2), 6=-595(load case 2)
rizontal 1=24(load case 1), 2=-27(load
case 1), 6=4(load case
)
Impression Force
1, 2-3=-133, 3-4=-12, 4-5=-246
, 5-6=-1
61
= 20 Ibs
SCREW VALUE. (#12-14 T/3)
035 250 046 4501b
057154(5 073 656lb
spacing 1-3, 3-4
; truss design d with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
ding, I = 1.00 'I Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 28.73 sq. ft., 0.6 DL applied. The Right End
ical is not exg sed to Wind. Design Velocity Pressure, qh = 42.94 psf.
zontal load all, lied to this truss resulting from the standard wind load, equal to 326 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
gn of which s all be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
iide adequatedrainage to prevent water ponding.
truss to be u Jed as valley truss only.
ical webs sha I line up with truss top chords supporting this valley truss (within 3.0" center to center).
chord load applied at 0-0-0 oc via valley trusses above.
CASE(S) Stalidard
071
Truss Type Qty Ply Truss
ROOF TRUSS 1 1 PBK1
s Sep 25 2007
w
QTY (Total = 114). All Screws Are #12-14 T/3
3 2-3:2, 4-5:2,5-4:2
3-6:3 II 1
2-7-10 5-34
325USJD073x12 V) 44(Z mr--5LRE7 5 4 9" O.C.
6" 275USHDO57
w" 2-14 T/3 2-7-10
2-7-10 5-3-4
SCREW QTY
CHORDS 2-6:2 Truss weight = 14 Ibs
WEBS 6-3:3
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/defl REW VALUE. (#12-14 T/3)
TCLL' 20.0 Code TC 0.36 Vert(LL) n/a n/a 5 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.04 Vert(TL) n/a 7 5401b 073 6561b
BCLL 0.0 WB 0.09 Horz(TL) 0.00 6621b
BCDL 10.0 (Matrix) Min Length / LL de = 9 #
nLa
STEEL SECTION B ING
TOP CHORD 35 US 035 50 *Except' IHOR, Shea d or -0-0 on center purlin spacing 1-4
W2 36�j� �USVJD 035 50 T ORD n center bracing 2-5
BOT CHORD 35 USd 035 50
WEBS 362 USII�D 035 50
REACTIONS attsize/rrlpterial)1/5-3-4/UKN, 5/5-3-4/UKN, 2/5-3-4/UKN, 6/5-3 UKN
Max Dovvv�VVVJn 1=74(load case 1), 5=187(load case 3), 2=86(lo case 2), 6=464(load case 3)
Max Up f 1=-89(load case 2), 5=-292(load case 2), 2=-7(load case 3), 6=-720(load case 2)
Max Howl ontal 2=-7(load case 4), 6=6(load case 1)
FORCES (lb) Max. Compression Force
TOP CHORD 1-2=-2iI� 2-3=-447, 3-4=-151, 4-5=-163
BOTICHORD 2-6=-6.1'5-6=-1
1) TF'is truss designe
Building, I = 1.00 ,
Vertical is not exp
2) Horizontal o load ap
d6sign of which st
3) This truss to be u:
4) Top chord load ap
LOAD CASE(S) Sta
rith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
= 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 18.63 sq. ft., 0.6 DL applied. The Right End
d to Wind. Design Velocity Pressure, qh = 42.94 psf.
d to this truss resulting from the standard wind load, equal to 451 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
as valley truss only.
d at 0-0-0 oc via valley trusses above.
0710017
ROOF TRUSS I 1 12 I PBK2
s Sep 25
, LLC Mon
SCREW QTY (Tot
CHORDS 2-3:2, 4
WEBS 3-6:2
QTY
i 2-6:2
6-3:2
LOADING (psf)
TOLL 20.0
TCDL 15.0
BOLL 0.0
BCDL 10.0
STEEL SECTION
TOP CHORD 35 l
W2
BOT CHORD 35 t
WEBS 362
REACTIONS QUsi2
Max
Max
Max
FORCES (lb) Max.
TOP CHORD 1-2=
BOif CHORD 2-6=
to be
design
= 1.00
not exl
load a
which s
to be L
load a
(S) Sb
= 12 ). All Screws Are #12-14 T/3
,:2. 5-4:2
2-7-10 2-7-10
2-7-10 5-3-4
325USJD073x12 C3) *� 17- -t . Scrims,
6" 275USHDO57 48" 0 C .
vd*AM 2-14 T/3 2-7-10
2-7-10 5-3-4
SPACING 4-0-0
CSI
DEFL (in) (loc)
I/deft
Code
TC 0.18
Vert(LL) n/a
n/a
FBC/AISI
BC 0.02
Vert(TL) n/a
n/a
WB 0.05
Horz(TL) 0.00
n/a�
(Matrix)
Min Length / LL deft =
BRACIN
035 50 *Except*
TOP D She hed o
USWD 035 50
T C 4-0-0
a to
03550
WD 035 50
aterial)1/5-3-4/UKN, 5/5-3-4/UKN, 2/5-3-4/UKN, 6/5-3-4/UKN
in1=74(load case 1), 5=187(load case 3), 2=86(load case
), 6=464(load case 3)
ft 1=-89(load case 2), 5=-292(load case 2), 2=-7(load case 3), 6=-720(load case 2)
zontal 2=-7(load case 4), 6=6(load case 1)
repression Force
, 2-3=-447, 3-4=-151, 4-5=-163
5-6=-1
Truss weight = 29 Ibs
kLUE. (#12-14 T/3)
046 4501b
073 6561b
-0 on center purlin spacing 1-4
bracing 2-5
nected together with #10-16 screws as follows: Top chords connected with 1 row at 12 inches on center. Bottom chords connected with 1 row at 12 inches
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 18.63 sq. ft., 0.6 DL applied. The Right End
ed to Wind. Design Velocity Pressure, qh = 42.94 psf.
ad to this truss resulting from the standard wind load, equal to 451 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
I be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
i as valley truss only.
led at 0-0-0 oc via valley trusses above.
Job I St.Lucie Oaks Commercial Center Truss Type City Ply Truss
)710017 ROOF TRUSS 1 1 R3
The M i narch Company 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Mon Apr 28 10:30:24 2008 Page 1
SCREW CITY (Total = 76 ). All Screws Are #12-14 T/3
CHORDS 1-11:2, 4-31 4-5:25-7:2, 7-5:5, 11-1:2
WEBS 1-10:5, 2-9: j 2-1D, 3-8:4, 3-9:2, 4-7:4, 4-8:3
3-0-0 4-4-8 4-4-8 2-3-0
3-0-0 7-4-8 11-9-0 14-0-0
325US96073x8
4 2 2
z
5.00 12 2 3 4
4
N ! 2
co \\A 6
`n �\
2
4 \\
7 4
5) 10 2 `c4 3 4
U
11 10 G 3K 9 8 7
2-0-0 1-0-0 4-4-8 4-4-8 2-2-2 O-QT14
2-0-0 3-0-0 7-4-8 11-9-0 If
1-2 14-0-0
SCREW QTY
WEBS 7-4:4, 8-3: , 8-4:3, 9-2:4, 9-3:2, 10-1:5, 10-2:10 Truss weight = 68 Ibs
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc t defl SC W VALUE. (#12-14 T/3)
TCLL. 20.0 Code TC 0.78 Vert(LL) 0.0 999 035 2561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.36 Vert(TL 0.0 10-11 057 5401b 073 6561b
BCLL 0.0 WB 0.23 Ho 0.7 n 097 6621b
BCDL 10.0 (Matrix) in n t / LL tl #
STEEL SECTION \VBRA'TOP'CHORD 35 USD 035 50 *Except* � s ORD Sheathed or 2-0-0 on center purlin spacing 1-4, 4-6
W1 364C USWD 035 50, W9 362 USWD 035 50 f CHORD 4-0-0 on center bracing 11-7
BOTjCHORD 35 US4i 035 50
WEBS 362 US D 035 50
REACTIONS QUsize/r¶' terial)7/0-4-0/USKW, 10/2-0-0/CMU
Max DoWn 7=952(load case 3), 10=1550(load case 1)
Max Uplift 7=-1132(load case 2), 10=-2455(load case 2)
FORCES (lb) Max. Cdl pression Force
TOPICHORD 1-11=-97, 1-2=-1120, 2-3=-862, 3-4=-446, 4-5=0, 5-6=0, 5-7=-175
BOT CHORD 10-11_0, 9-10=-264, 8-9=-995, 7-8=-362
WEBS 1-10=- 68, 2-10=-1319, 2-9=-955, 3-9=-191, 3-8=-859, 4-8=-428, 4-7=-869
NOT' S
1) This truss has beJ, designed for unbalanced loading conditions.
2) This truss designed' with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , f Cz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 65.33 sq. ft., 0.6 DL applied. The Left End
Vertical and Right End Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) Horizontal load ap�lied to this truss resulting from the standard wind load, equal to 1247 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
design of which shpll be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
4) Provide adequate �rainage to prevent water ponding.
5) 35USKW attachedi,to truss at Joint 7 with 5 410 sds. Refer to Aegis detail US2US-1.
6) Top chord load appllied at 0-0-0 oc via valley trusses above.
LOADCASE(S) StalCard
"i !I
0017
16-32 s
ROOF TRUSS 11 11 1 RG
Tue Aar 29
SCREW QTY (Total = 422 ). All Screws Are #12-14 T/3
CHORDS 1-2:4, 4-3:29, 4-5:31, 6-5:31, 6-7:29, 9-8:4
WEBS 2-15:2 , 2-16:23, 3-14:9, 3-15:11, 4-13:5, 4-14:7. 5-13:2. 6-12:7, 6-13:5. 7-11:11, 7-12:9. 8-10:23, 8-11:23
3-0-0 3-4-8 3-4-8 4-3-0 4-3-0 3-4-8 3-4-8 3-0-0
3-0-0 64-8 9-9-0 14-0-0 18-3-0 21-7-8 25-0-0 28-0-0
5.00 12 525US JD073x10 525USJD073x1O
USJD073x6 16 15 14 13 12 11
'C8K
O
I�
0
10 7OOUSJD073x6
C8K
2-0-0 1-0- 3-4-8 3-4-8 4-3-0 4-3-0 3-4-8 3-4-8
2-0-0 3-0-0 6-4-8 9-9-0 14-0-0 18-3-0 21-7-8 25 28-0-0
SCREW QTY
CHORDS 1-16:6, 9-10:6
WEBS 10-8:1 11-7:11, 11-8:13, 12-6:10, 12-7:9, 13-4:5, 13-5:2, 13-6:5, 14-3:9, 14-4:10, 15-2:13, 15-3:11, 16 3 Truss weight = 187 Ibs
LOADING (psf) SPACING 4-0-0 CSI jQE i ) (10 I/d SCREW VALUE. (#12-14 T/3)
TILL 20.0 Code TC 0.84 ( L) 12-13 035 256lb 046 4501b
TQDL 15.0 FBC/AISI BC 0.89 ) 13-14 >999 057 5401b 073 6561b
B4LL 0.0 WB 0.96 H 10 n/a 097 6621b
BCDL 10.0 (Matrix) Mi gf / LL deft = 240 #
STEEL SECTION BRACING
TOP CHORD 55 USD 035 50 TOP CHORD Sheathed or 2-0-0 on center purlin spacing 1-4, 4-6, 6-9
BOT CHORD 35 USD 073 50 BOT CHORD 4-0-0 on center bracing 1-9
WEBS 362 USWD 035 50 `Except'
W1 662 USWD 057 50, W2 362 USWD 046 50, W12 362 USWD 046 50
W13I362 USWD 057 50
REACTIONS (jt/siz /material)16/2-0-0/CMU, 10/2-0-0/CMU
Max 1, own 16=3850(load case 1), 10=3850(load case 1)
Max Lplift 16=-6593(load case 2), 10=-6593(load case 2)
FORCES (Ib) Max. ompression Force
TQ P CHORD 1-2= 89, 2-3=-3541, 34=4471, 4-5=-4654, 5-6=4654, 6-7=-4471, 7-8=-3541, 8-9=-889
BOT CHORD 1-16T-154, 15-16=-139, 14-15=-4400, 13-14=-6125, 12-13=-6125, 11-12=-4400, 10-11=-139, 9-10=-154
WEBS 2-16T-3542, 2-15=-5690, 3-15=-1535, 3-14=-2296, 4-14=-1692, 4-13=-1110, 5-13=-425, 6-13=-1110, 6-12=-1692, 7-12=-2296, 7-11=-1535, 8-11=-5690, 8-10=-3542
1) This truss has begin designed for unbalanced loading conditions.
2) This truss design d with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification 11, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 r Kz = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 259.69 sq. ft., 0.6 DL applied. Design
Velocity Pressure, qh = 42.94 psf.
3) For truss to truas`connection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s).
4) Provide adequat drainage to prevent water ponding.
5) Load case(s) 1, 2 3, 4, 5, 6 has been modified. Building designer must review loads to verify that they are correct for the intended use of this truss.
6) Attach 35USGP 12" at location of tie-in trusses - See detail U32US-3B.1
7) Special connections required at joints 14, 12,
8) Top chord load applied at 0-0-0 cc via valley trusses above.
LOAD CASE(S)
1) ,Live:
Uniform Loads (p f)
Vert: 1-2 -140.0, 2-3=-140.0, 3-4=-140.0, 4-5=-70.0, 5-6=-70.0, 6-7=-140.0, 7-8=-140.0, 8-9=-140.0, 1-16=-40.0,
15-16= 4��0, 14-15=-40.0, 13-14=-194.4, 12-13=-194.4, 11-12=-40.0, 10-11=-40.0, 9-10=40.0
Concentrated Loads (lb)
Vert: 14= i 187 12=-987
2) Wind 1 C&C:
Uniform Loads (p�
Vert: 1-2- 36.0, 2-3=-36.0, 3-4=-36.0, 4-5=-26.0, 5-6=-26.0, 6-7=-36.0, 7-8=-36.0, 8-9=-36.0, 1-16=-24.0, 15-16=-24.0,
14-15=-2 10, 13-14=-62.4, 12-13=-62.4, 11-12=-24.0, 10-11=-24.0, 9-10=-24.0
Normal: 1 2=237.1, 2-3=237.1, 3-4=237.1, 4-5=-20.0, 5-6=-20.0, 6-7=237.1, 7-8=237.1, 8-9=237.1, 1-16=347.0,
13-14=461.8, 12-13=464.8, 9-10=347.0
Concentrated Loans (lb)
Vert: 14=2357 12=2357
3) Wind 2 C&C:
;ontinued on page 2
0017
Truss Type �Qty Ply Truss
ROOF TRUSS 1 1 RG
The Monarch Com "any 7.16-32 s Sep 25 2007 Aegis Metal Framing, LLC Tue Apr 29 14:18:07 2008 Page 2
LOAD CASE(S)
Uniform Loads (,� If)
Vert: 1-2=-36.0, 2-3=-36.0, 3-4=-36.0, 4-5=-6.0, 5-6=-6.0, 6-7=-36.0, 7-8=-36.0, 8-9=-36.0, 1-16=-24.0, 15-16=-24.0, 14-15=-24.0, 13-14=-100.9, 12-13=-100.9,
11-12=-24.0, 10-11=-24.0, 9-10=-24.0
Normal: I1-2=-82.5, 2-3=-82.5, 3-4=-82.5, 4-5=-83.4, 5-6=-83.4, 6-7=-82.5, 7-8=-82.5, 8-9=-82.5, 1-16=408.8, 13-14=35.2, 12-13=35.2,_ 9-10=408.8
Concentrated Loads (lb)
Vert: 14ib.
1-349 12=-349
4) Dead:
Uniform Loads If)
Vert: 1--60.0, 2-3=-60.0, 3A=-60.0, 4-5=-30.0, 5-6=-30.0, 6-7=-60.0, 7-8=-60.0, B-9=-60.0, 1-16= 40.0, 15-16= 40.0, 14-15= 40.0, 13-14=-116.9, 12-13=-116.9,
11-12=-0, 10-11=-40.0, 9-10=40.0
Concentrated Loads (lb)
Vert:141-54812=-548
5)11stunbalanced give:
Uniform Loads (plf)
Vert: 1- 1-140.0, 2-3=-140.0, 3-4=-140.0, 4-5=-70.0, 5-6=-70.0, 6-7=-60.0, 7-8=-60.0, 8-9=-60.0, 1-16=-40.0, 15-16=-40.0, 14-15=-40.0, 13-14=-194.4, 12-13=-194.4,
11-12=- b.0, 10-11=-40.0, 9-10=-40.0
Concentrated L ads (lb)
Vert: 14 L98712=-987
6) 2nd unbalanced Dive:
Uniform Loads (plf)
Vert: 14 L60.0, 2-3=-60.0, 3-4=-60.0, 4-5=-70.0, 5-6=-70.0, 6-7=-140.0, 7-8=-140.0, 8-9=-140.0, 1-16=-40.0, 15-16=-40.0, 14-15=40.0, 13-14=-194.4, 12-13=-194.4,
11-12=-% .0, 10-11=40.0, 9-10=-40.0
Concentrated Lc ds (lb)
Vert: 14: 987 12=-987
i
I
AF
0.?
I
� �I
Job
COMMON 11 11 I RG1
SCREW QTY (Total = 222). All Screws Are #12-14 T/3
CHORDS 1-17:2,It-4:11, 5-6:9, 9-10:2, 10-9:2, 17-1:2
WEBS 1-16:4,-15:12, 2-16:19, 3-14:4, 3-15:2, 4-14:3, 5-13:3, 5-14:6, 6-13:3, 7-12:6, 7-13:2, 8-11:14, 8-12:8, 9-11:4
3-0-0 4-10-8 4-0-0 2-1-8 2-1-8 4-0-0 4-10-8 3-0-0
3-0-0 7-10-8 11-10-8 14-0-0 16-1-8 20-1-8 25-0-0 28-0-0
5.00 12 325U1:i64073x8
5
6
I'
00
0
17 16
15 14 13 12
11
C6K
C 6 NC,
2-0-0 1-0-q 4-10-8
4-0-0
4-3-0 4-0-0
4-10-8 1-0-9 2-0-0
2-0-0 3-0-0 7-10-8
11-10-8
16-1-8 20-1-8
25-0-0 26-0-0 28-0-0
SCREW QTY
WEBS
11-8:17,
11-9:4, 12-7:6, 12-8:8, 13-5:3, 13-6:3,
13-7:2, 14-3:4, 14-4:5,
14-5:6,
15-2:12, 15-3:8, 16-1:4, 16-2:22
Truss weight = 161 Ibs
LOADING (psf)
SPACING 4-0-0
CS]
DEFL (in) (loc) I/deft
W VALUE. (#12-14 T/3)
TCLL
20.0
Code
TC 0.87
Vert(LL) 0.17 14-15 > ,
03 561b 046 4501b
TCDL
15.0
FBC/AISI
BC 0.74
Vert(TL) 0.15 9
057 Olb 073 6561b
BCLL
0.0
WB 0.98
Horz(TL) -0.031 /
?=*.,
097 6621b
BCDL
10.0
(Matrix)
Min Le�g#h / LL 2
tt
STEEL SECTION
TOP CHORD 35 U
W1)
BOT CHORD 35 U
WEBS 362
W3(
W13
B
) 046 50 'Except' TO ORD Sheathed or 2-0-0 on center purlin spacing 1-5, 5-9
USWD 035 50, W16 362 USWD 035 50 OT D 4-0-0 on center bracing 17-10
) 046 50
;WD 035 50 `Except'
USWD 035 50, W4 362 USWD 073 50, W8 362 USWD 0 50
32 USWD 046 50, W14 60 USWD 035 50
of/sizef aterial)16/2-0-0/CMU, 1 1/2-0-0/CMU
Max D 16=3206(load case 1), 11=2795(load case 1)
Max Uplift 16=-5538(load case 2), 11=-4302(load case 2)
Max.
1-17
116-1
1-16
9-11
1) This truss has bee
2) This truss designe
Building, I = 1.00 ,
\%rtical and Right
3) For truss to truss c
is' delegated to the
4) Lvad case(s) 1, 2 1
truss.
5) Attach 35USGP x
6) Top chord load apl
LOAD CASE(S) Star
1) Live:
Uniform Loads (plf,
Vert:1-2='
15-16=-40.'
Concentrated Load
Vert: 15=-5
2) Wind 1 C&C:
Uniform Loads (plf)
Vert: 1-2=-:
14-15=-24.i
Normal: 1
10-11=347.
Concentrated Load
Vert: 15=1 f
mpression Force
06, 1-2=-950, 2-3=-3233, 3-4=-2938, 4-5=-2869, 5-6=-2615, 6-7=-2679, 7-8=-2644, 8-9=-958, 9-10=-509
0, 15-16=-209, 14-15=-3907, 13-14=-2288, 12-13=-2281, 11-12=-192, 10-11=-0
12, 2-16=-2939, 2-15=-5134, 3-15=467, 3-14=-377, 4-14=410, 5-14=-2588, 5-13=-504, 6-13=409, 7-13=-376, 7-12=-694, 8-12=-3427, 8-11=-2528,
94
designed for unbalanced loading conditions.
with ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
i = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 258.53 sq. ft., 0.6 DL applied. The Left End
nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
nnection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
uildinc designer_
been modified. Building designer must review loads to verify that they are correct for the intended use of this
2" at location of tie-in trusses - See detail US2US-3B.1
ed at 0-0-0 oc via valley trusses above.
and Except:
0.0, 2-3=-140.0, 3-4=-140.0, 4-5=-140.0, 5-6=-140.0, 6-7=-140.0, 7-8=-140.0, 8-9=-140.0, 16-17=40.0,
14-15=40.0, 13-14=40.0, 12-13=40.0, 11-12=-40.0, 10-11=40.0
(lb)
? 14=-423
.0. 2-3=-36.0, 3-4=-36.0, 4-5=-36.0, 5-6=-36.0, 6-7=-36.0, 7-8=-36.0, 8-9=-36.0, 16-17=-24.0, 15-16=-24.0,
13-14=-24.0, 12-13=-24.0, 11-12=-24.0, 10-11=-24.0
237.1, 2-3=237.1, 3-4=237.1, 4-5=237.1, 5-6=237.1,'6-7=237.1, 7-8=237.1, 8-9=237.1, 16-17=347.0,
4=1132
Job
7
61
Truss
ROOF TRUSS 11 11 1 RG2
QTY (Total T� 115 ). All Screws Are #12-14 T/3
i 1-11:2, 3-2:4, 3-4:4, 5-7:7, 7-5:8, 11-1:2
1-10:4, 2-�,:9, 2-10:7, 3-8:5, 3-9:5, 4-8:2, 5-8:8
3-0-0
=nnf4�
4-9-0
7-9-0
325USf073x8
4-0-0 , 2-3-0
11-9-0 14-0-0
2-0-0 1-0-0 4-9-0 4-0-0 2-2-2 0- 14
2-0-0 3-0-0 7-9-0 11-9-0 13-11-2 14-0-0
SCREW CITY
WEBS 8-3:5, 8 41?, 8-5:8, 9-2:9, 9-3:6, 10-1:4, 10-2:14 Truss weight = 79 Ibs
I
LOADING (psf) SPACING 4-0-0 CSI DEFL (in) (loc) I/deft SCREW VALUE. (#12-14 T/3)
TCLL 20.0 Code TC 0.85 Vert(LL) 0.11 8-9 >999 035 561b 046 4501b
TCDL 15.0 FBC/AISI BC 0.97 Vert(TL) 0.09 8-9 >999 7 401b 073 6561b
BCLL 0.0 WB 0.53 Horz(TL) -0.01 7 n/a 621b
BCDL 10.0 (Matrix) Min Length / LL defl = 240 #
STEEL SECTION I BRACING
TOP CHORD 35 US 046 50 *Except* TOPC� ORD heathed r center purlin spacing 1-3, 3-6
'10
` W1 36�USWD 035 50, T2 35 USD 035 50, W9 362 USWD 035 50 B C�IORD -0 o r'ente racing 11-7
BOT CHORD 35 US 035 50
WEBS 362 USA D 035 50 *Except*
W3 36h USWD 057 50
REACTIONS Qt/size/rp1atenal)7/0-4-0/USKW, 10/2-0-0/CMU
Max Doikn 7=1332(load case 1), 10=1925(load case 1)
Max Up`jft 7=-1847(load case 2), .10=-3501(load case 2)
FORCES (lb) Max. C II IlQfnpression Force
TOP CHORD 1-11=-d113, 1-2=-1014, 2-3=-1373, 3-4=-679, 4-5=-679, 5-6=0, 5-7=-1257
BO- CHORD 10-11ij-0, 9-10=-193, 8-9=-1815, 7-8=-2
WEBS 1-10=- 96, 2-10=-1716, 2-9=-2147, 3-9=-1058, 3-8=-600, 4-8=-366, 5-8=-2055
NOTES
1) This truss has bee 'designed for unbalanced loading conditions.
2) This truss designedi, lwith ASCE 7-02 wind load as referenced by FBC . V = 140 mph, C&C Method, Building Classification II, h = 33.8 ft., Exposure Category C, Enclosed
Building, I = 1.00 , k z = 1.01 , Kd = 0.85 , Kzt = 1.00 , InteriorRoof Zone, "a" distance = 7.90 ft. using a top chord tributary area of 65.33 sq. ft., 0.6 DL applied. The Left End
Vertical and Right nd Vertical are not exposed to Wind. Design Velocity Pressure, qh = 42.94 psf.
3) Horizontal load appied to this truss resulting from the standard wind load, equal to 802 Ibs, has been considered to be resisted by the diaphragm and/or other elements, the
d'sign of which shall be the responsibility of the Engineer of Record. Wind loads applied to the supporting wall should be considered when designing truss to wall connections.
4) For truss to truss connection(s) of concentrated load(s) shown refer to Aegis Detail Series US2US. Special connection(s) required for other type load(s). Design of connection(s)
isj delegated to the building designer.
5) P.�.ovide adequate rrainage to prevent water ponding.
6) 35USKW attached to truss at Joint 7 with 8 410 sds. Refer to Aegis detail US2US-1.
7) Load case(s) 1, 2, 4, 5, 6 has been modified. Building designer must review loads to verify that they are correct for the intended
use of this truss.
8) Attach 35USGP x I2" at location of tie-in trusses - See detail US2US-3B.1
9) Top chord load ap led at 0-0-0 oc via valley trusses above.
LOAD CASE(S)
1) Live:
Uniform Loads (pl
Vert: 1-2=- 40.0, 2-3=-140.0, 3-4=-70.0, 4-5=-70.0, 5-6=-70.0, 10-1 1=-40.0,9-10=-40.0, 8-9=-149.4, 7-8=-149.4
Concentrated Loa (lb)
Vert: 9=-5 2
2) Wind 1 C&C:
Uniform Loads (plo,
Vert: 1-2=- 6.0, 2-3=-36.0, 3-4=-26.0, 4-5=-26.0, 5-6=-26.0, 10-11=-24.0, 9-10=-24,0, 8-9=-49.9, 7-8=-49.9
Normal: 1- 252.9, 2-3=252.9, 3-4=2.2, 4-5=2.2, 5-6=-239.9, 10-11=347.0, 8-9=344.9, 7-8=344.9
Concentrated Loads (lb)
Vert: 9=1311,
3) Wind 2 C&C:
on page 2
Job
0710017
St.Lucie Oaks Commercial Center
7.16-32 s
Truss Type �Qty Ply Truss
ROOF TRUSS 1 1 RG2
2008
LOADICASE(S)
Uniform Loads (plf)
Vert: 1-2=-31
Normal: 1-2=
Concentrated Loads
Vert: 9=-195
4) Dead:
Uniform Loads (plf)
Vert: 1-2=-61
Concentrated Loads
Vert: 9=-307
5.) lst'unbalanced Live,
Uniform Loads (plf)
Vert: 1-2=-1
Concentrated Loads
Vert: 9=-552
6) 2n unbalanced Live
Uniform Loads (plf)
Vert: 1-2=-6(
Concentrated Loads
Vert: 9=-552
I
i
, 2-3=-36.0, 3-4=-6.0, 4-5=-6.0, 5-6=-6.0, 10-11=-24.0, 9-10=-24.0, 8-9=-75.9, 7-8=-75.9
B.8, 2-3=-88.8, 3-4=-86.6, 4-5=-86.6, 5-6=-18.1, 10-11=322.0, 8-9=26.1, 7-8=26.1
2-3=-60.0, 3-4=-30.0, 4-5=-30.0, 5-6=-30.0, 10-11=-40.0, 9-10=-40.0, 8-9=-91.9, 7-8=-91.9
2-3=-140.0, 3-4=10.0, 4-5=10.0, 5-6=10.0, 10-11=-40.0, 9-10=-40.0, 8-9=-149.4, 7-8=-149.4
2-3=-60.0, 3-4=-70.0, 4-5=-70.0, 5-6=-70.0, 10-11=40.0, 9-10=-40.0, 8-9=-149.4, 7-8=-149.4
m
N �i Nil III`
MAMMUM CAPAWY Q11000 L.DS UPLWTD
FASTENER
CONCRETE
H
EDGE
DO T.
EMBED D
$12 SDS
UPUPLIFTM
IENGT
(pal)
(In.)
(In.)
TEKSCRE
S
(29i DIS. X 2 ��
4000
1.5
1-3/4w
4
10004
TAPCONS
VA F=(dU8
(OR
r +fY
err
(4) #12 SDS
— 423HD14 +-+?
S'r
(2) Il 4N q�tW�Minn0r�
( 423HD94
(1) 42 3HDD I4
(4060 PSI Concrete)
C0NClR1ET R NOTES
1.E
CONCRETE MTO� 2) /4° X� TOAPC®NS AND 4) 612 TEK SCREWS CLIP O 00 PSI)
RUSS.
2. THIS CONNECTION IS FOR LIGHT GAUGE STEED TRUSS TO CONCRETE
AT EACH LOCATION WHERE CONNECTION C1 FL 0 CALLED OUT ON THE INDIVIDUAL
TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOR DOSE WHERE CONDITIONS COST AND UPLIFTS ARE 1000 LBS OR LESS.
S. MINIMUM TEFL SCREW SPACING AND EDGE DISTANCE a 6/8'
4. MINIMUM CONCRETE THICKNESS � 1.3 X EMBEDMEFIT DEPTH OR Bw NnM HCHEV[ER IS GREATER.
5. WARN0NC,: WEB OR HEEL STIFFENER BUST BE ATTACHED TO THE BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 4 - $12 SDS MAY BE USED FOR
ALL 8=DFLI FT CAPACITIES SHOWN.
S. THIS INFORMATION IS FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT IS THE
RESPONSIBILITY OF THE ENGINEER OF RECORD TO DCESMN THE BEARING
TO RESIST UPLIFT AND GRAVITY LOADS.
TE OF FLOIkIDA PROFESSIONAL ENGINEER
IF. LED ERER P.E.
F LO A P.]E.#41917
16500 VAIN c�®c�H B LVD.
� CHEF, FL. 33470
) #12 SDS
123HD14
IPW Fasterve
W equal)
PSI Concrete)
i ��♦�`I mim-1
TF-1M(®NA71 CH COMPANY
COLD FORMED METAL TRUSS FABRICATION AND INBlAiLATION
4001 SE COMMERCE AVENUE STUART, FLORIDA 34997
772-283-4001 / FAX 772-28.3-3999
QUOTESQTHEMONARCHCOMFANY.COM
Sheet
1Fff®DeCt# STD D ETAM 1 I
DRAWN BY: J.GAFFNEY ( I Y
Iw=1-1 I "
16500
MAXIMUM (CAPACITY (2000 LBS UPLIFT)
FASTENER
�ONCR TEE
STRENGTH
SEDGE
DIST.
EMBED#12
SD8
UPLIFT
I�dh (pal)
(h.)
QI�.�
TEKSCREWS
CLIP TOTRU
(4v� ®a u 2'
4000
1.5
77
20009
TAPCONS
Offs EQUAL
912 SDS
II W BUI DER 1/4' DIS. R 2'
TAPCONS (OR EQUAL)
r 1.5, Min.
(4000 PSI Cenaete)
CONCRETE NOTES
1. CONCRETEE WITH Q4 1/ CONNECTION APGONS AN Q7I),992 TE SCREWS CUP TO 5�RUSS oo PSI)
2. THIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS T® CONCRETE
AT EACH LOCATION WHERE CONNECTION C2K IS CALLED OUT ON THE INDIVIDUAL
TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOUR USE WHERE CONDITIONS EMST AND UPLIFTS ARE 2000 LBS OR LESS.
3. MINIPdJO<9M TELL SCREW SPACING AND EDGE DISTANCE _ 5/8"
4. MINIMUM CONCRETE THICKNESS = 1.3 X EMBEDMENT DEPTH OR 3" WHICHEVER IS GREATER.
5. WARNING: WES OR HEEL STIFFENER MUST BE ATTACHED TO THE BOTTOM CHORD
AS GREOQ,DIGRED FOR THE TRUSS UPLIFT REACTION 7 - 012 SDS MAY BE USED FOR
ALL UFLIfr;T CAPACITIES SHOWN.
S. THIS INFORMATION IS FOR THE PURPOSE POSCE OIL ANCHOR DESIGN ONLY. IT M THE
RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN THE BEARING
TO RESIST UPLOFT AND GRAVITY LOADS.
M2 SDS
SHD14
N BUILDER 1/V DIS. X 2'
PCONS (OR EQUAL)
1.5' Min
-SI Concrete)
A PROFF451ONAL ENGINM
LEDTMER P.E.
)A ]P,E.#41917
kCHER, IFL. 33470
422-3215
THF, MONARCH Co
/J COLD FORMED METAL TRUSS FABRICATION AND INSTALLATION
4001 SE COMMERCE AVENUE STUART, FLORIDA 34997
772-283-4001 / FAX 772-283-3999
QUOTPS@aI EMONARCHCOMPANY.COM
Sheet
p>r®Dect# STD DETAIL
3 DRAWN BY: J.GAFFNEY C2K
m
CLIP BOTH
STATE OF
I
T= nNiR. rT TP IRA C14 STDIR,
o MAXIMUM
CAPACITY (3000 LDS UPLIFT) 1500 Lbs EACH CLIP
FASTENER
CONCRETE TE
STRENGTH
EDGE
DIS T.
EMBED
#12 SDS
UPUFrP cup
TOTAL UPLIFT
Mi h (pQ
(In.)
(6n.)
TE)C SCREWS
CUP T® TRUSS
(31/ Die.X2'
14000
1.5
9-3/4°9
5
95000
3000#
TAPCONS
OR EQUAL
#12 SOS
(3) ITW BUILDEX 114' DIa. X 2'
TAPCONS (OR EQUAL)
71.5° mn.
(4m PSI Conac°t0)
— (5) 012 SDS
— 426ND14
(3) ITW BUILDEX 114' Dla. X 2'
TAPCONS (OR EQUAL)
71.5' Mom
0—ta)
CONCRETI AN&I
1. 3m�i� � f IAa; UPLIFT CI�INNECTIUN US?IUI�, ,A I �f� �"� CLIP FtiSTENED TC� fiIIN-10'�'l�i �.SI
C NC;REN H (3) 1 a' X ,,. P Of �Pf1�,5` ars iSI Sr.hH�`,5 EA(,H :;Lii'° RUSti
t
I HIS CCi�NNH�; I InN IS �(i)I � LIGH I (CAI I;� E � I f=EL I I tUS� I ��� i.C�)NCI �t I E
AT EAR H L���GATIC�IN WHERE �.�1�JNE�:TI���i�1 �; 3K I'; CALLEC�I C�II IT ��N THE INCIV IC�'UAL
TRI�'S� ENG'�IEERIf1G .SHEETS ���� TRUSS G���fJNEG-CJR LAYC)UT THIS
Cwf`�(\IEC,TICf�N IS FCIR IJSE WHERE ;�C��f�1CIITI�INS EXItiT ANC �IPLiFTS ARE .�4'���� LES C�lR LEtiS
l fllfll\11Jf,1 TEI'; �;�.REiV `;�'ACIf IAf IC' EC���E �'I_;TANI�E = 5 i"
-1 �'ilNlf IUD CLfICR�T� TI IICK�I�SS - 1 ?. �fill?Sfi1f�1SNT ��PTI I OOR ;" N/I IICI I�V��R IS GRi AT�R
�; ',`JARNINC; VIES ��R HEEL STIFFENER f/lll`T LE ATTACHELTC) THE BC�iTTCiIf (H(�)RC�
AS RE«1lJIRE@ F��R THE TRl ISS l IPLIFT REACTIC�IN 5 �1� .SDS f�IAY 5E USEC` F�)R
AI I UPI !�T CAPACI � I��'..I 1�7WN
THIS INF(�RI IATICIN IS FCi�R THE PIJRF'C1S_E t�F ANCH(�)R DESIGN �7fJL 1. IT IS THE
I'tEtil"f�iNSILILI I Y" C�F 1 Hf= SfJGIf`J�EI� nF I,�C�i>lil� ICl� L�E51�.N I HE �;EAIiINC;
TC�i I';T UPLIFT p.11 :GRAVITY
7. LED ER ER P.E.
DA P.IE.#41917
AC H F, E, FL. 33470
-422-3215
iuA
Wl
'ICff-][]E MONARCH C®I%'At@TY
COLD FORMED METAL TRUSS FABRICATION AND INSTALLATION
4001 SE COMMERCE AVENUE STUART, FLORMA 34997
772-2834001 / FAX 772-263-3999
QUOTESQa THEZ 10NARCHCOMFANY.COM
FrojeCt# .STD DE"..T°AM sneenl %
DRAWN BY. J.GAFFNEY J K
^J
CLIP BOTH
MAXIMUM
CAPACITY (4000 LES UPLIFT) 2000 Lbs EACH CLIP
FA87ENER
CONCRETE
STRENGTH
EDGE
DIST.
EMBED
092 SD8
UPUF"mcLIP
TOTAL UPLIFT
Mh (p31)
(in.)
(u�.➢
TEK SCREWS
CLIP TO TRUSS
(4v4 ®e. X a EX
4000
1.5
1-3/4w
7
20009
40®0
TAPCONS
OR EQUAL
012 SOS
(4) ITW BUILDEX 114' Dla X 2'
TAPCONS (OR EQUAL)
71.6' Min.
(4lm PSI Canvate)
r au
41R
l:
ar
428HD'14
- (T)#12SDS
— 42SHD14
(4) ITW BUILDEX 114- DI& X 2'
TAPCONS (OR EQUAL)
-d' 1.6' Min.
PSI Canaale)
CONCREC���'��tl oo��'� �OO TES
1=�,�(i,n a filA). UPLIFT CC�f�INECTIUN U`If�J�, ��. r���l:;•HC�-•l,'l.� CLIP FA'�TE�IEC�� T�i� NIIfJ ��n,�� P`;I
2. 7HIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS TO CONCRETE
AT EACH LOCATION WHERE CONNECTION C4K IS CALLED OUT ON THE INDIVIDUAL
TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOR USE WHERE CONDITIONS EXIST LAND UPLIFTS ARE 4000 LBS OR LESS,.
3. MINIMUM TEK SCREW SPACING AND EDGE DISTANCE = 5/0"
4. MINIMUM CONCRETE THICKNESS = 1.3 X EMBEDMENT DEPTH OR 3' WHICHEVER IS GREATER.
5. WARNING: WEB OR HEEL STIFFENER MUST BE ATTACHED TO THE LB07TOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 7 - fi 2 SDS MAY BE USED FOR
ALL UFLIFT CAPACITIES SHOWN.
(l I HIy III-nI3M-,I III (�f'J IS Ft�)li I H� I"Ulil"C�)ti� OOI- AN%HnP L��HSli:fv ONLY. I I IS IHt
PE'.;P�I IEILITI" CIF THE E J��INEERTHE EEA 11f 110
IILI RESi`;T UPLIFT ANCs,I ��hA�/ITV L6I1AAAAM
)WE OF FLORA PROFEZIONAL ENGINM
FL.® A ]P.]E.#41917
16500 -V kN cGO G)F <l[ ]BLVD.
II OXAFU, CACII-][]E]E, ]FL. 33470
3 Il-422-3215
i WWROVI
�
THR MONARCH COMPANY
COLD FORMED METAL TRUSS FABRICATION AND INSTALLATION
4001 SE COMMERCE AVENUE STUART, FLORIDA 34997
772283-4001 / FAX 772-283-3999
QUOTESQTM MONARCHCOMPANY.COM
' rProject# .STD DErAZ Sheet
h / 01 DRAWN BY: J.GAFFNEY
Il C4K
WC5
CLIP
T TS F. ( NIR (TIP R A cC'1H( WIN
MGXWM CAPAUTY (5000 LBS UPLIFT) 2500 L bs EACH CLIP
FASTENER
STRENGTH
STRENGTH
Min. (paI)
EDGE
DI8T.
(in.)
EMBED#12
(in.)
SDS
TIEKSCREYVS
CLIP TO TRUSS
UPUFTPER CUP
TOTAL UPLIFT
(1)1/2"D XW RED r
LARGE DIAMETER TA.PM18
®R EQUAL)
4000
3
4-1/2'
9
2500#
012 SDS
(1) ITW RED HEAD IDT-1250
ANCHOR (OR EQUAL)
73-92° Mln.
(4000 PSI Conaete)
w•
aiv �
w•
42SH014
CLIP BOTH SIDES
(9) 012 SDS
428HD14
ITW RED HEAD LDT-1250
ANCHOR (OR EQUAL)
� M' Mln.
Conaele)
JOW& uv- rA
CONCRETE 1HA'D
N o LeS�1. E000 0 MAX UPLIFT CONNECTION U MNEG S HD426 CLIP FASTENED T® (MIN 4000 PSCONCRETE WITH (1) 1/3e X Be ITW GRE®LELDT-1250 AND (0) 012 TEUS SCREWS EACH CLIP TO TRUSS.
a. THIS CONNECTION IS FOR U,UGHT GAUGE STEED TRUSS TO CONCRETE
AT EACH LOCATION WHERE CONNECTION CSK IS CALLED OUT ON THE INDIVIDUAL
i TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOR USE WHERE CONDITIONS EXIST AND UPLIFTS ARE 5000 LBS OR LESS.
3. MINIMUM TEK SCREW SPACING AND (EDGE DISTANCE _ 5/8'
4. MINIMUM CONCRETE THICKNESS m 1.3 X EMBEDMENT DEPTH OR 3° WHO CHEVEIR IS GREATER.
5. WARNING: WEB OR HEEL STIFFENER MUST BE ATTACHED TO THE BOTTOM CHORD
AS REQUIRED RED FOR THE TRUSS UPLIFT (REACTION 0 e 612 SDS MAY BE USED FOR
ALL UDFLIFT CAPACITIES SHOWN.
0. THIS INFORMATION US FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT US THE
RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN THE BEARING
TO DESIST UPLIFT AND GGRAVrrY LOADS.
STATE OFFLO A PROFESSIONAL ENGINM
]E�AlL��d T ARD ERER P.E.
)FLOR DA IP.IE.#4b917
11
1L® AC)H[lE1E, FL. 33470
561-422-3215
I 1 W'30
l6
�
THE MONARCH C]H[ a✓®M�ANY
COID FORMED METAL TRUSS FABRICATION AND INSTALLATION
4001 SE COMMERCE AVENUE STUART, FLORMA 34997
772.2834001 / FAX 772-283-3999
QUOTPS@TMMONARCHCOMPANY.COM
p$OjCCt#.S111U'!ts'E1LLBM Sheet DRAWN BY: J.GAFFNEY
SIDES
I TSIR ONE CUP EACH SIDLE
MAAMUM
CAPACIN (6000 LBS UPLIT) 3C®® Labs EACH CL9P
FA87ENE R
CONCRETE
STRENGTH
tltl1 h (pd)
CADGE
DMT.
(h)
EMBED
QO�e➢
#12 SDS
TEK SCREWS
CLIP TO TRUS
tIPUFrPERCUP
TOTAL UPLIFT
(1) FIW RED HFAD
LMIE'OETER TAPCOHS
OR EQU
(
ITW RED HEAD LDT-5850
ANCHOR (OR EQUAL)
7312' Min.
(4000 PSI Concrete)
1. 1.19 ,
41? S
YC
426HD14
CLIP
(8) #12 SDS
-426HD14
I MIN RED HEAD LDT-1260
ANCHOR (OR EQUAL)
AN
;III Min.
PSI Concrete)
got k-we%*91,
CONCRETE NOTES
1. 6000 0 MAX UPLIFT CONNECTION USING 2) AEGIS HD426 CLIP FASTENED 5TO QMIN 4000 PSI
CONCRETE WITH (1) 5/8' X 5e I� REHD LDT-5350 AND (10) *� 2 TEK SCLRE. 8 EACH CLI� TO TRUSS.
2. THIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS TO CONCRETE
AT EACH LOCATION WHERE CONNECTION CSK IS CALLED OUT ON THE INDWOUA,
TRUSS ENGINEERING SHEETS OR TRUSS CONNECTO6R.LAlYOUT. THIS
CONNECTION IS FOR USE WHERE CONDITIONS EXIST AND UPLIFTS ARE 6000 LBS OR LESS.
3. MINIMUM TEK SCREW SPACING AND LEDGE DISTANCE a 5/8'
4. MINIMUM CONCRETE THICKNESS =1.3 X EMBEDMENT DEPTH OR Z' WHICHEVEGR IS GREATER.
5. WARNING: WEB OR HEEL STIFFENER MUST DE ATTACHED TO TIME BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 10 - #12 SDS MAY BE USED FOR
ALL D, FLAT CAPACITIES SHOWN.
G. THIS INFORMATION IS FOR 'i HE PURPOSE OF ANCHOR DESIGN ONLY. IT IS THE
RESPONSIBILITY OF THE LENON ELER OF RECORD TO DESIGN THE ®LEADING
TO RESIST UPLIFT AND GGRAVIfY LOADS.
ERER P.E.
FLO Dlk P.E,#41917
16500 [AN GOGH BLVD.
°II'ACH E]E, FL. 33470
¢1-422-3215
N-9��♦A',
THF- lb][®1 AR(ClH[ (C01"ANY
COLD FORMED METAL TRUSS FABRICATION AND INSTALLATION
4001 SE COMMERCE AVENUE STUART, FLORIDA 34997
i 772.283-{W 1 / FAX 772-283-3999
QUOTHSQTFD�tONARCHCOMPANY.COM
Street
rProj=# STD DETAM
DRAWN BY: J.GAFFNEY C6K
/� i �
Ifs
i'�NTC�)IloDLT�'�IL
I MIR ONE (CUP EACH SIDE
MAXIMUM CAPACITY (8000 L[0S UPLIFT) 4000 Lbe EACH CLOP
FASTENER V�
CONCRETE
STRENGTH
ff�h (psi)
EDGE
DIST.
(In.)
COMBED
Qo�°)
012 SDS
TEKSCREWS
cup ToTRus
UPU"PERCUP
roTALUPUPr
(1)4"RED "® Xs3� 3/4
LARMDIA'NEIERTAPCONS
®R EQUAL
4000
3-1/2'
94
40000
SDS
(1) ITW RED HEAD LDT-M62
ANCHOR (OR EQUAL)
731/2° PAIn.
(m PSI C. =ele)
1.1 as
42(6HD144
(14)1712 SDS
426HD14
ITW RED HEAD LOT-W2
ANCHOR (OR EQUAL)
�-TIT Min
CONCRETE Q32W.CiLIP WO
`
9.EE{RED(4)92 ESRPM)
CONCRETE UPLIFT CONNECTION 6 6' ITW D HEAD LDT-311TKCE S EACCLIP TO TRUSS.
2. THIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS TO CONCRETE
AT EACH LOCATION WHERE CONNECTION C8K IS CALLED OUT ON THE INDIVIDUAL
TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOR USE WHERE CONDITIONS LEAST AND UPLIFTS ARE 8000 LRS OR LESS.
3. MINIMUM STfEK SCREW SPACING AND EDGE DISTANCE = 5/0"
4. MINIMUM CONCRETE THICKNESS =1.3 X EMBEDMENT DEPTH OR 3" WHICHEVER IS GREATER.
[ER.
5. WARNING: WEB OR HEEL STIFFENER MUST BE ATTACHED ED TO THE BOTTOM CHORD
AS REQUIRED FOR THE TRUSS 03PLJFT REACTION 14 a @12 SDS MAY DP USED FOR
ALL UFLIF T CAPACITIES SHOWN.
S. THIS INFORMATION IS FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT IS THE
RESPONSIBILITY OF THE (ENGINEER OF RECORD TO DESIGN THE BEARING
TO RESIST UPLIFT AND GRAVITY LOADS.
STATE OF FLO A PROFESSIONAL ENGINEER
lF'. LED ERER P.E.
FLO A ]P.IE.#4b917
I1 500 i ®Q�)E3[ IE�IL�.
]L® °]['ACH EIE, FL. 33470
5,¢Il-422-3215
][]FIDE lbff®NAll.8C)E-3[ COMPANY
COLD FORMED METAL TRUSS FABRICATION AND INSTAIIATION
II 4001 SE COMMERCE AVENUE STUART, FLORMA 34997
772.2834001 / FAX 772-283-3999
QUOTESQTH E34ONARCHCOMPANY.COM
Sheet
I lPffoyect# STD DETAIL
- D / �� DRAWN BY: J.GAFFNEY C8K
1000# STEEL ANCHOR DETAIL
MAXIMUM CAPACITY (1000 LBS UPL7 T)
FASTENER
STEED
EDGE
DMT.
;M2 SDS
o
�JJpLI��f��
TYPE
QOP1.�
TEKSCREWS
CLIP TO TRUSS
(2) H LTO X-Ul9
0.167'° Dis. X 3/4'
A° S ITM A, 36
112m
4
10009
UNIVERSAL KNURLED
SHANKFASTENERS
(4) #12 SDS
423HD
(2) HIS X-U19 PAF
Edge DIsL =1/2"
c �n
34'
1-Irz a
Qi 42 3NDDi4
STEEL AN ATES
1. 1000 # MAX UPLIFT CONNECTION UMNG AEGIS H0423 (CLIP FASTENED TO ASS STEEL
19 TH (2) 0.157- X 3/4' X-U10 PAP AND (4) 911 TEK SCREWS CLOP TO TRUSS.
2. THIS CONNECTION 0S FOR LIGHT GAUGE STEEL TRUSS TO STEEL BEAM, ANGLE OR PLATE
AT EACH LOCATION WHERE CONNECTION S1 K 0S CALLED OUT ON THE INDIVIDUAL
TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION 9S FOR USE WHERE C®ND ONS EXIST AND UPLIFTS ARE 1000 LBS OR LESS.
S. MINIMUM iTEK SCREW SPACING AND EDGE DISTANCE _ 5/8"
4. STEEL THICKNESS =1/4w T® 1/2'
S. WARNING: WEE OR HEEL STIFFENER MIDST BE ATTACHED TO THE BOTTOM CHORD
AS REQUIRED RED FOR THE TRUSS UPLIFT REACTION 4 - 012 SDS MAY BE USED ED FOR
.ALL UPLIFT CAPACITIES SHOWN.
S. THIS INFORMATION B FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT M THE
(RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN THE BEARING
TO RESIST UPLIFT AND GRAVITY LADS.
IF. ]Tall—DRRE]R P.R.
FLORIDA P.]E.#41917
D 7CACH E]E, FL. 33470
1-422-3215
i3 a .1, 61
#12 SDS
3HD
i Hild Xd119 PAF
Edge DIsL =1/2'
THE MONARCH (COMPANY
COLD FORMED METAL TRUSS FABRLCATION AND INSTALLATION
4001 SE COMMERCE AVENUE STUART. FWRIDA 34997
772-283-4001 / FAX 772-283-3999
QUOTESQa TELEMONARCHCOMPANY.COM
Sheet
project# SID DETAIL
DRAWN BY: J.GAFFNEY ClK
III
STATE OF FLC
KARL
FLOIR
16500 d
ILOXP b
5
i
•
KAMM M CAPACITY (2000
LEE UPLVFT)
FASTENER
STEEL
EDGE
OBT.
012 SDS
Mf���f� IP
TYPE
(in.)
TEKSCREWS
CLT70TRUSS
(3) HILTI X-1199
0.157m DIa. X 3/4"
ASTM A 36
1 /21,
7
20300
UNWEtSALKNURLED
SHANK FASTENERS
(7)412SDS 4.,
- 426HD14
• (3) Hi]U X-1.119PAF
+-vr
Y
Min. Edge Dist =11T Q 1 D 426III D0 4
}1
` THIS �Ci)N�JEi;TI�N IS FC?R LIGHT GAUGE STEEL rf';i ISM TC` tiTEEL E'EaM AfJC;LE nR FL4TE
AT EAR N LCi)v1TiCiN \NH ERE Cu)NNE�,TI�)N Soh Iti � ALLEC� ���llT C�N THE INDIVIDUAL
TF?US'; Ef'JCINEERINt; ',HEFT; ��R TRI I`��� �.���NfJE,,Tl7R LAY��I1T THI
�NNECTI,11 IR USE WHEC ITNS EXIUT ANC UPLIFTS ARE =,�� 6� LE�� ���� LESS
3. MINIMUM TEK SCREW SPACING, AND LEDGE DISTANCE = 5/8e
4. STEEL THICKNESS =1/4" TO 1/0'
S. WARNING: WEB OR HEEL STIFFENER MUST BE ATTACHED CHED TO THE [BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION Y - 012 SDS MAY BE USED FOR
ALL UFLOFT CAPAUTI ES SHOWN.
S. THIS INFORMATION IS FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT IS THE
(RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN THE BEARING
TO RESIST UPLIFT AND GRAVITY LOADS.
]LeIED ERER P.E.
)A ]P.IE.#419]17
q cGO GH BLVD.
kC H[IEIE. FL. 33470
(7) 012 SDS
- 426HD14
(3) Will X-EDNO PAF
Edg• Not. =1/2°
COLD FORMED METAL TRUSS FABRICATION AND INSTALLATION
4001 SE COMMERCE AVENUE STUART, FLORIDA 34997
772-2834001 / FAX 772-283-3999
QUOTES@THEMONARCHCOMPANY.COM
Sheet
(Project# SM DETAM
DRAWN BY: J.GAFFNEY C2K
1
MAXIMUM CAPACITY (3000
LBS UPLIFT)
FASTENER
STEEL
EDGE
DOT.
#12 SDS
MPL�FT
TYPE
Q061.➢
TEKSCREWS
CUP TO TRUSS
(4) Caul X-U99
0.157' Dia. X 3/4'
ASTM A 365
t 1200
®
®®
UNNERSAL KNURL®
SHANK FASTENERS
i
o (10) 012 SDS
o ® (10) #12 SDS R �0 420HD14
0 0 428HD14 'M o • • (4) Hilti X-U19 PAF
e o• (4) HiW X-U19 PAF
,r
y,• Min. Edge Dist. =1/3°
Min. Edge ®let. =1/2°
I,
(1) 426HDI4
W)TEKSCREWS
STEEL1 34�ri0 MAXI IPI IF ONNEC Tl ' +�G � L IP FASTENED TO AS ��TEEMTH 4,0 -," a > Ul9PAF NS CLIP TO TRUSS.
2. THIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS TO STEEL BEAM ANGLE CAR PLATE
AT EACH LOCATION WHERE CONNECTION S.SK IS CALLED OUT ON THE INDIVIDUAL
TRUSS ENGINEERING G SHEETS; OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOR USE WHERE CONDITIONS EXIST AND UPLIFTS ARE 3000 LBS OR LESS
3. MINIMUM TEK SCREW SPAOONG AND (EDGE DISTANCE o 5/0•
4. STEEL THICKNESS =1/4w TO 1/2'
6. WARNING: WES OR HEEL STOG FENCER MUST BE ATTACHED TO THE BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 10 - 412 SDS MAY BE USED POGO
ALL UFL0Fr CAPACITIES SHOWN.
6. THIS INFORMATION 0 FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT 0 THE
RESPONSIBILITY Y OF THE ENGINEER ECER OF RECORD TO DESIGN THE BEARING
TO RESIST UPLIFT AND GRAVITY LOADS.
SPATE OF R91 RA PROFESSIONAL FNGDM,
F.R[-RIDERBRER P.E.F LOI '?A P.lE.#41917
16500�GOGHBLVD.
L® 'CHEE, FL. 33470
422-3215
'ui
i wh♦5`I its
°) HIE MONARCH H[ COMPANY
COLD FORMBD MBTALTRUSS FABRICATION AND INSTALLATION
4001 SE COMMERCEAVENUE STUART, FLORIDA 34997
772-293-l / FAX 772-283-3999
QUOTPS@T MMONAACHCOMPANY.COM
l rojeet# STD DETAIL weal
DRAWN BY. J.GAFFNEY C
USE ONE CLIP EACH SMOTE
MMIMUM CAPACITY (4000 LBS UPLIFT) 2000 LBS EACH CLIP.
FASTENER PERCLIIP
STEEL
EDGE
TEcSgl s
UPLIFT PER CUP
TYPE
DIST.
(In.)
CLIP TO TRUSS
TOTAL
TOTAL
TOTAL
(3) HOLTI X=U19
/�w
®® 09
0.1 57" Diaz. X 3/4"
ASTM A 36
UNIVERSAL KNURLED
SHANK FASTENERS
X-u19
14
4000
CLIP 90TH &DES
y (7) 0
12 9
426HD
(3) HIM
Min. E
ST L
1. 40000 MAX UPLIFT
WITH (3) 0.157° X 3/4
2. THIS CONNECTION 0 FOR LIGHT GAUGE STEED TRUSS TO STEEL BEAD, ANGLE OR PLATE
AT EACH LOCATION WHERE CONNECTION 84K IS CALLED OUT ON THE INDIVIDUAL
TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOR USE WHERE CONDITIONS (EXIST AND UPLIFTS ARE 4000 LBS OR LESS.
S. MINIMUM TEK SCREW SPACING AND (EDGE DISTANCE a 5/8'
4. STEEL THICKNESS o 1/4" TO 1/2"
5. WARNING: WES OR HEEL STIFFENER MUST BE A17ACHED TO THE BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 7 - 012 SDS MAY BE USED FOR
ALL UFUFT CAPACITIES SHOWN.
S. THIS INFORMATION IS FOR THE PURPOSE OF ANCHOR DESMN ONLY. IT IS THE
RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN THE BEARING
TO RESIST UPLIFT AND GRAVITY LOADS.
(7) 012 SOS
426HD14
3) HIM X-EDNI PAIF
Mn. Edge DIsL =1/2'
STATE OF FF�, §I0NAL PAIGINE�
F. IL]EDIRRIE � F.E.
�FLO A]P.IE.#41917
100 TAT GOGIH[ BLVD.
IOXA1 4TACHR E, FL. 33470
161-422-3215
ffi�•�`I�
THE MONARCH CONEPANY
COLD FORMED =ALffiRCETRUSS FAHSTUART,FLO MA-MlAT[ON
� 4003 SE COMMERCB AVENUE BTUAR, FIARIDA 34997
772-283-"t / FAX 772.283.3999
QUOTFS9 THEMONARCHCOMFANY.COM
Sheet
Project# STD DETAIL
DRAWN BY: J.GAFFNEY C4K
I
STATE OF
16500
®OTH SODES
wommilTo
USE ONE CLIP EACH SIDE
MAMMUM CAPACITY (6000 LBS MPUFT) 2500 LBS EACH CLIP.
FASTENER PER CLIP
STEEL
APE
EDGE
MST.
TEKSCREEWBS
CLIP TO TRUSS
UPLIFfPER CUP
TOTAL
TOTAL
TOTAL
(4) IHUI X-Ulg
/�W
��® 00
0.157°' Dial. X 3/4'
G���I�9 ��
UNIVERSAL KNURLED
SHANK FASTENERS
(9) N92 SDS
- 42$HD14
- (4) HIM X-U19 PAF
Min. Edge Dist. =1/2'
say
(22) 426HDD I4
r. -
ST
5u��� � , Ax I IPI IFT cONNFCTI.,����Ir�� ��-1I�1Ina�r cI IP FAtiTFNFn T�.� A,r.. ��TFFI
wI I H a Ia 1,�x :4 x-u� r>nF �NIR� � r � I FN SCRw��s FACH cI III I O I PUSS
� THIS CONNECTIC�)N IS FOR LIGHT GAUGE STEEL TRUSS TO STEEL SEAM. ANC LE OR PLATE
AT EACH LOCATION WHERE CONNECTION S:>d IS CALLEa T N THE INC�IVIC`UAL
TRUSS FfIL�Ii.IFFRIHrT�;I IFFTS OR TRU�S CONfIFCTOR AOUOYOUT TI III
CONNCCTION IS FOR USC WI ICRC COfJC��ITIONS CXIST ANC�I UPLIFTS ARC ���GJ� LGS OR LOSS
3 f�11NIf��UM TEh SCREW SRACI JG AfJC� EC10E DISTANCE - 5 2"
5. WARNING- WEB OR HEEL'�TIFFENER fv UST EE •TTACHEC� TO THE EOOTTOf�� GHORC��
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 9 012 SCS MAY GC USED FOR
ALL UFLIFT OPACITIES SHOWN.
G. THIS INFORMATION IS FOR THE PURPOSE OF ANCHOR DESIGN ONLY IT IS THE
RESPONSIBILITY OF THE ENGINEER I R OF RECORD TO DESIGN THE II BEARING
TO RESIST UPLIFT AND GRAVITY LOADS.
A®A PROFESSIONAL ENGFVBER
F. LEDERER P.R.
IAA P.lE.#41917
AT GOG H[ BLVD.
L ACHEIE, ]FL. 33470
51-422-3215
/3b-00
(9) #12 SDS
42SHD14
;4) HiltI X-EDNI PAF
Aim. Edge Dist. =1/2'
THE MC)NA➢ C H[ C®MIPAYRTY
COLD FORMED METAL. TRUSS FABRICATION AND INSTALLATION
4001 SE COMMERCE AVENUE STUART, FLORIDA 34997
772-283-4001 / FAX 772-283-3999
QUoTBs@THEiviONARCHCOMPANY.COM
Sheet
Project# STD DETAIL
DRAWN BY: J.GAFFNEY C5K
A
?�II(1�(11,• TRL��� TC�) TRLT�� C;C�)\ � �-:(;TIC�)'� ICI �T,'�I1.
MAX/ MUM CAPAWY (2000
LES UPU rill')
FASTENER
012 SOS
STEEL
TYPE
MIN.EDGE
SPACING oT
TEc sraEws012808
CLIP TO GIRDER
U PU FT
TEKSCREWS
CLIP TO TRUSS
7
WN 20 Ga.
slaw
7
20008
Place 2' leg of USKW to
allow screw installation.
Crientate as shown
or reversed. "
IC
� f
®®
7/V 98Tia-ln Truss
e 13ottaen Chord
Faatan Conn Ilp to
USGPw/y=#1 ®S
35 USKW Connector Clip Place bottom edge of USKW
Fasten to truss BETWEEN Nash with band In USC
End Veftel and Bottoms Chord
w/7 #92 SOS
TRUSS TO TRUSS GONNEC TI]ON DD ETAL
1. 2000 0 MAX UPLIF (REACTION CONNECTION USING (t AEGIS USKW CLIP FASTENED TO
(MIN.) 20 Ga. TRUSS WITH (7) 012 TEK SCREWS CLIP T� BOTH TRUSS AND GIRDER.
2. THIS DETAIL IS FOR LIGHT GAUGE STEEL TRUSS TO TRUSS CONNECTIONS
AT EACH LOCATION WHERE T2K IS CALLED OUT ON THE INDIVIDUAL TRUSS ENGINEERING
SHEETS OR TRUSS CONNECTOR LAYOUT. THIS CONNECTION IS FOR USE WHERE
CONDITIONS EXIST AND UPLIFTS/REACTIONS ARE 2000 LBSS OR LESS.
3. MINIMUM TEK SCREW SPACING AND EDGE DISTANCE - 5/8'
4. STEEL THICKNESS = 20 Ga.
STATE OF FL® A PAOFE55IONALENGINM
]E ARL11 . LIRDIER1ER P.E.
FLORIDA P.lE.#41917
,
16500 i(GIG H[ ]BLVD.
LOXAHI I TACHEE, FL. 33470
5 Il-422-3215
I�
i ► WE ♦�MI.-
CoTHF— MONARCH COMP NY
ID FOAMIID METALTAUSS FABRICATION AND ErN ATION
4001 SE COMMERCE AVENUE STUART, PIARIDA 34997
772-233-4001 / FAX 772-283.3999
QUOTES@THEMONARCHCOMFANY.COM
Sheet
rproject# STD D ETAM
DRAWN BY: J.GAFFNEY I KI
�(I►(1111)� TR��� Tt�� TIZ�-�� (lt��\'\I�,(�TIt��\ �1,T,'�I .
MAXEMUM CAPACETY (5000
UBS UPLEFTfI )
FASTENER
912SDS
STEEL
MIN. EDGE
SP�ACHGDS4�
912 SDS
TEOCSCRIlNS
UPLEFT
TEKSCREWS
TYPE
CLOP70GIRDER
CLIP O TRUSS
9
MEN 20 Ga.
5/&°
16
20009
14 Ga. 6' X 6' CLIP 6' LONG
Fy = 50 Foal
arlenteted as shown
orreversed.
275 USHD 057 (Full depth of BC)
spaced Ur O.C. Fasten to
GIMorTwssw/6-#12SDS. —
Girder Truss
Bottom Chord
700 USZ 073
Fasten to 275 USHD
w/ 6 - 012 SDS.
't
OP.
Q51
SPA0
2�SJS�O
Uu wI lo- aia aui�
Connector Cllp (Details @ Left)
Fasten to truss and vertical
or Bottom Chord w/ 16 012 BOB
as required forTie-In Truss reaction and
min 20 Ga. Bottom Chord thiolmoss.
TRUSS TO TRUSS CONNECTM DETAL
1. 50000 MAX UPLIFT/REACTION CONNECTION USING 14 Ga. S" x 6' CLOP S' LONG FASTENED TO
(PAIN.) 20 Ga. TRUSS NTH (16) #12 TEK SCREWS CLOP TO BOTH TRUSS AND GIRDER.
2. THIS DETAIL IS FOR LIGHT C1iAUGE STEEL TRUSS TO TRUSS CONNECTOONS
AT EACH LOCATION WHERE T5K IS CALLED OUT ON THE INDIVIDUAL TRUSS ENGINEERING
SHEETS OR TRUSS CONNECTOR LAYOUT. THIS CONNECTION IS FOR USE WHERE
CONDITIONS EXOST AND UPLIFTS/REACTIONS ARE 5D00 LOS OR LESS.
3. DA RIMUM TEIK SCREW SPACING AND EDGE DISTANCE = 5/II"
4. STEEL THICKNESS = 20 Ga.
L EED ERER P.E.
ll LO A P.F,.#41917
16500 V GOGH B LVD.
]LOB CI RF,, FL. 33470
56Il; 22-3215
00-1
THE MONARCH COhMANY
COLD FORMED MBTALIRUSS FABRICATION AND INSTALLATION
4001 SE COMMERCE AVENUE STUART, FLORMA 34M
772-2934001 / FAX 772-293-3999
QUOTESQTHRHONARCHCOMFANY.COM
Project# SM AlEJLIriM SheeI ,�
DRAWN BY.- J.GAFFNEY I Tt 5 � \
MAXIMUM CAPACITY (11000
LBS UPLIFT)
012 SDI
STEEL
SPACING
/EDGE DIS T.
#�� SDs
UPLIFT
4EC SCREWS
CLIP TO WALL
TYPE
(In.)
TEK SCREWS
CLIP TO TRUSS
4
20 Ga. MIN.
5/am
4
1000f
La
Y4•
( 4) 412 SDS Q1 D 42 3HDI4
423HD 94
.7; � 2 sus
(4) SDS 012 SCREWS �
p (4),SDS S 012 SCREWS
L�0 HT GAUGE NOTES
1. 1000 # MAX UPLIFT CONNECTION USING (I)AEGIS HD423 CLIP FASTENED TO (RAIN)
20 Ga. WALL WITH (4) #12 TES SCREWS AN 3 (4) 012 TEK SCREWS TO TRUSS.
2. THIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS TO LIGHT Ga. WALL, TRUSS OR
OTHER FRAMING MEMBER AT EACH LOCATION WHERE CONNECTION LlK IS CALLED OUT
ON THE INDIVIDUAL TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTIONS IS FOR USE WHERE CONDITIONS EMST AND UPLIFTS ARE 1000 LBS OR LESS.
3. MINIMUM TEE SCREW SPACING AND (EDGE DISTANCE = 5/6"
4. STEEL THICKNESS = 20 Ga.
5. WARNING: WEB OR HEEL STIFFENER MUST BE ATTACHED TO THE BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 4 - #92 SDS MAY BE USED FOR
ALL UPLIFT CAPACITIES SHOWN.
6. THIS INFORMATION IS FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT IS THE
RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN THE BEARING /
TO (RESIST UPLIFT AND GRAVITY LOADS.
SPATE O� FLORIDA PROFESSIONAL ENGINEER
KAjk L F. L EED ER ER P.E.
®IIBIIDA ]P.]E.#41917
165 0 VAN GOGH BLVD.
LOX TAC&EE, FL. 33470
1 561-422-3215
\C Q 'f}MIACH-399 CAM9 OR
A 4 997
2-28/
J Project# 5M DEA'M Shed
DRAWN BY: J.GAFFNEY LIK
i � 0 0
il
STD: I, ,�NC;HC�)R
MAXIMUM CAPACITY (2000
LBS UPLIFT)
STEEL
�PACN3
/EDGE =T
�®M
UPLFT
TFX REW
�csCReuvs
CLIP TO WALL
���
(In.)
TEKSCRC:WS
TEK
CLOP TO TRUSS
7
20 Ga. MK
7
20000
426HO14
(7) 912 SDS %� IV
LCUGHT GAUGE ANCHOR u U NOTES
1 20 G W WITH (7) CONNECTION12 7SEWS AM (7) 092 TEK SCREWS TO TRUSS. (fl�o�9)
2. THIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS TO LIGHT Gs. WALL, TRUSS OR
OTHER FRAMING MEMBER AT EACH LOCATION WHERE CONNECTION L2K IS CALLED OUT
ON THE INDIVIDUAL TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOR USE WHERE CONDITIONS EMST AND UPLIFTS ARE 2000 LBS OR LOSS.
3. MINIMUM TELL SCREW SPACING AND EDGE DISTANCE ® 5/8'
4. STEEL THICKNESS a 20 Ga.
5. WARNING: WEB OR HEEL STIFFENER MUST BE ATTACHED TO THE BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 7 _ #12 SDS MAY BE USED FOR
ALL UfFLIRT CAPACITIES SHOWN.
S. THIS INFORMATION IS FOR THE PURPOSE OIL ANCHOR DESIGNS ONLY. IT IS THE
RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGNS THE BEARING
TO RESIST UPLIFT AND GRAVITY LOADS.
STATE OF FIAR®A PROFESSIONAL ENGBM
I . Tf
'I)�EDIERER PJE.
AEF7L® .#41917
1!CI GH BLVD.
L®C✓33, FL. 33470
422215 i
Ni
ptmject# SM DE7 AM Sh"t
DRAWN BY: J.GAFFNEY L2K
'11
MAoMUM CAPACITY (3000
LBS UPLIFT➢
M SDS
STEEL
SPACING
/EDGE DUST
# 12 SDS
UPLIFT
MSCI46WS
CLIP TO WALL
TYPE
(in.)
TE➢CSCPEWS
CLOP TO TRUSS
90
20 Ga. MIN.
51r
10
3000#
(10)092SDS
• °o 426HD14
i (10) #12 SDS,
(1) 42%
'vl
UGHT GA E ANCHOR NOTES
1.20 e� W���H (9)912 TET041 SCREWS P� 1AEGIS12 TEK CLIP FASTENED T® TRUSS. oozy
2. THIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS TO LIGHT Ga. WALL, TRUSS OR
OTHER FRAMING MEMBER AT EACH LOCATION WHERE CONNECTION L3K IS CALLED OUT
ON THE INDIVIDUAL TRUSS ENGNEEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECT30M IS FOR USE WHERE CONDITIONS EXIST AND UPLIFTS ARE 3000 LNBS OR LESS.
3. MINIMUM TIED SCREW SPACING AND EDGE DISTANCE = 5/3e
4. STEEL THICKNESS = 20 Ga.
5. WARNING. WEB OR HEEL STIFFENER MUST BE ATTACHED TO THE BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT (REACTION 7 -.212 SDS MAY BE USED FOR
ALL UPLIFT CAPACITIES SHOWN.
S. THIS INFORMATION IS FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT IS THE
RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN( THE BEARING
TO RESIST UPLIFT ARID GRAVITY LOADS.
seem
KAFJ I F. LED ER ER P.E.
147,0 ALIT A 7P.]E.#41917
16i500 ! NOG1H[ B LVD.
LO TACHE E, F[.. 33470
61-422-3215
,Lwl �1, 0 , bl
(10) 012 SDS
426HD14
10) #12 SDS
PIIOjea# SM ]META][](. sleet %
DRAWN BY. J.GAFFNEY L 35 K
ITMOM11. NCI-I�)R DIET I�
MAYJMUM CAPACITY 4000
LESS (2000 LOS UPLIFT PER CLIP)
SPACING
#92 SDS
STEEL
(EDGE DIST
SOSUPLIIFT
�xscREWs
CLOP TO WALL
TYPEscREWs
QBPO.D
TEK tlmc
CLIP TO TRUSS
7
20 Ga. MONI.
5/8.
7
40009
E A C�ITD]E
CUP EACH MOE
#12 808
420HDD I4
(7) 012 SDS
LK3HT GAUGE ANCHOR NOTES
1. 4000 0 MAX UPLIFT CONNECTION USING (a� AEGISF-0®4aB CLIP FASTENED T®
20 Ga. WALL W OTFI (7) #12 TfEK SCREWS AN (7)112 TEK SCREWS TO TRUSS { CoPU- ) CLIP).
2. THIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS TO LIGHT Ga. WALL, TRUSS OR
OTHER FRAMING MEMBER AT EACH LOCATION WHERE CONNECTION L4K IS CALLED OUT
ON THE INDIVIDUAL TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOR USE WHERE CONDITIONS EXIST AND UPLIFTS ARE 4000 L(BS OR LESS.
3. MINIMUM TEK SCREW SPACING AND EDGE DISTANCE = 5/0e
4. STEEL THICKNESS = 20 Ga.
S. WARNING: WEB OR HEEL STIFFENER MUST BE ATTACHED TO THE BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 7 - *92 SDS MAY BE USED FOR
ALL UFLIF r CAPACITIES SHOWN.
6. THIS INFORMATION IS FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT IS THE
RESPONSIMUTY OF THE ENGINEER OF RECORD TO DESIGN THE (BEARING
TO RESIST UPLIFT AND GRAVITY LOADS.
SPATE OFFMR®APROFESSIONAL ENGINEER
KARLI F. LEDERFR FJE.
FLO A 1P.lE.#41917
1650�0, GOGH B LVD.
L C�'A0;g17E]E, ]FL. 33470
' 61-422-3215
-TE-M MONARCH COMPANY
/)
COL] FORMED METAL TRUSS FABRICATION AND 7NSTAM-AION
40015E COMMERCE AVENUE STUART, FLORIDA 34997
772-2834WI / PA%772a83-3999
QUOIESQTf ErtONARCHCOMPANY.COM
project# SM DETAM
Sheet
�
L4K
DRAWN BY: J.GAFFNEY
Sj� 5000# STEEL ANCHOR DETAM
EACH SI
MAXIMUM CAPACITY,5000 (2500 LBS UPLIFT EACH CLIP)
SPACING012 80S STEEEL /C®GE ®IST 012 SOS LlJ1pLI�
TEK SCREWS YPEE YEKSCREWS
CUPTOWALL (in.) CILIPT®TRUSS
/--- (9)413 SDS
• is
i— (9)2''
#92 SDS
CUP
l)l07), �-,
UGHT GAUGE ANCHOR NOTES
1. 5000 f MAX UPLIFT CONNECTION USIMG QdAEGIS HD426 CLIP FASTENED TO (MIN
20 Ga. WALL WITH (10) 012 TEK SCREWS. (10) 612 TfEK SCREWS TO TRUSS.(EAIR CLIP)
2. THIS CONNECTION IS FOR LIGHT GAUGE STEEL TRUSS TO LIGHT Ga. WALL, TRUSS OR
OTHER FRAMING MEMBER AT EACH LOCATION WHERE CONNECTION LSK IS CALLED OUT
ON THE INDIVIDUAL TRUSS ENGINEERING SHEETS OR TRUSS CONNECTOR LAYOUT. THIS
CONNECTION IS FOR USE WHERE CONDITIONS EXIST AND UPLIFTS ARE 5000 LBS OR LESS.
3. MINIMUM TEIS SCREW SPACING AND EDGE DISTANCE = 518"
4. STEEL THICKNESS = 20 Ga.
5. WARNING: WEB OR HEEL STIFFENER MUST BE ATTACHED TO THE BOTTOM CHORD
AS REQUIRED FOR THE TRUSS UPLIFT REACTION 9 - 812 SDS MAY DE USED FOR
ALL UIFLIF T CAPACITIES SHOWN.
S. THIS INFORMATION IS FOR THE PURPOSE OF ANCHOR DESIGN ONLY. IT IS THE
RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN THE BEARING
TO RESIST UPLIFT AND GRAVITY LOADS.
STATE OF F bRIDAPROFESSIONALENGINEER
KA,Mt IF. LEDERER P.E.
FLO A ]P.IE.##41917H[ 165001 AN GOG B LVD.
]Lo 7CACH ElE, FL. 33470
6Il-422-3215
41,
;9) 012 SDS
426HD14
(9) M2 SDS
i ► AMAk
'IITFIE MONARCH COMPANY
COLD FORMED M6IALIRUSS FAMUCAnON AND INSTAUAnON
4001 SE COMMERCE AVENUE STUART. FLORIDA 34997
772-2834MI / FAX 772-283-3999
QUOTES W MEMONARCHCOMPANY.COM
& rojeet# STD D ETAM Sheet
DRAWN BY: J.GAFFNEY