Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTArea T ed a ra l 21 Phone: 954-784-2941 E-Fax: 954-784-7875 g i neeri ng admin@fed-eng.com www.fed-eng.com esting, Inca • Field Density Tests of Compacted Soils Method D-6938 Proposed Residence Lot 27, Creekside Date: September 12, 2019 8613 Cobblestone Drive, Fort Pierce, FL sc„AN Order #: 19DR622 ,ted: BuildingPad aBy Permit #: 1810-0655 Type: Light Brown Sand with Shell & Rock lIl1H°II�!(�'� Tech: JA Client: D.R. Morton, Inc. Addres 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist o �0 Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 N i , Corner of Building Pad 12" FL 9.5 113.0 117.0 10.0 96.6% Yes 2 Canter of Building Pad 12" FL 9.3 112.4 117.0 10.0 96.1 % Yes 3 Sli� Corner of Building Pad 12" FL 7.7 117.2 117.0 10.0 100.2% Yes 4 5 6 7 8 III 9 10 11 12 See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity. Legend r Elevation: PR = Pr (roll 1,2,3 = 1st, 2nd, 3rd Lift SL = SD aline FL = Final Lift SG BC=E TOP = As a mL material c The resul proposed suitability work. rade BG = Below Grade Digitally signed by Keith LeBlanc DN: c=US, st=Florida,l=Pompano rd°jONN (Ee'.�4 ti Beach, o=Federal Engineering & 'Nesting, No.59394 Inc., oI Professional Engineer_#59394, cn=Keith LeBlanc, STATE OF email=keith`@fed-eng.com s'..`•°=•°PEa' � °•.S�ONAL e°• Date: 2019.09.13 13:32:52-04'00' 9course BOF = Bottom of Footing p of Pipe FG = Finished Grade protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. Jo not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the vcture without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this PAGE 1 of 2 Pursuani to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project An the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material , nly. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performa d by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of a i ded fill material. FET was not contracted to perform supervision of the building pad preparation, This testing of the addi:ld fill material does not include an analysis of the underlying soil materials to determine if they are capable of supportiii " g the proposed structure without settlement. This density compaction test does not warranty any underlying soil materialt or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the r , sed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verif� diunderlying soil conditions. Environtental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is require provide a proposal for ng an environmental analysis of the soil materials. The scope of services is for dete 1-nination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job proi ct specifications were not available at the time the work was performed. Determination ofthe pass/fail compaction results z e based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98 ofthe AASHTO 7-180 standard for paved areas such as roadways and parking lots. |fdifferent specifications are required, Federal Engineering &TeotinQ. Inc. ohe|i be notified. Our finc Ings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other dates. Any subsequent site disturbances due to water erosion. rain waters, construction activities,excavatno.nvergnown.vegetaton,tnoDioandotherdisturbenoeawi||void\hiotastandtheehnmuotbmre-oompaohedmnd re4eatelprior toconstruction. As a m tual protection to clients, the public and ourselves, all reports are submitted are the oon5donde| property of clients and orization for . publication nfstatements, conclusions or extracts from or regarding our reports is reserved m penogN�//oenapproval. It has b�en a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2