Field Density Tests of Compacted Soils Method D-6938
Proposed Residence Lot 27, Creekside Date: September 12, 2019
8613 Cobblestone Drive, Fort Pierce, FL sc„AN Order #: 19DR622
,ted: BuildingPad aBy Permit #: 1810-0655
Type: Light Brown Sand with Shell & Rock lIl1H°II�!(�'� Tech: JA
Client: D.R. Morton, Inc.
Addres 1430 Culver Drive NE Compaction Req.: 95%
Palm Bay, FL 32907 Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
o
�0
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
N
i
, Corner of Building Pad
12"
FL
9.5
113.0
117.0
10.0
96.6%
Yes
2
Canter
of Building Pad
12"
FL
9.3
112.4
117.0
10.0
96.1 %
Yes
3
Sli�
Corner of Building Pad
12"
FL
7.7
117.2
117.0
10.0
100.2%
Yes
4
5
6
7
8
III
9
10
11
12
See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity.
Legend r Elevation:
PR = Pr (roll 1,2,3 = 1st, 2nd, 3rd Lift
SL = SD aline FL = Final Lift
SG
BC=E
TOP =
As a mL
material c
The resul
proposed
suitability
work.
rade BG = Below Grade
Digitally signed by Keith LeBlanc
DN: c=US, st=Florida,l=Pompano
rd°jONN (Ee'.�4
ti Beach, o=Federal Engineering &
'Nesting,
No.59394
Inc., oI Professional
Engineer_#59394, cn=Keith LeBlanc,
STATE OF
email=keith`@fed-eng.com
s'..`•°=•°PEa' �
°•.S�ONAL e°•
Date: 2019.09.13 13:32:52-04'00'
9course BOF = Bottom of Footing
p of Pipe FG = Finished Grade
protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of
A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure.
Jo not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the
vcture without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the
the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this
PAGE 1 of 2
Pursuani to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project An the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material , nly. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performa d by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top
12" of a i ded fill material. FET was not contracted to perform supervision of the building pad preparation, This testing of
the addi:ld fill material does not include an analysis of the underlying soil materials to determine if they are capable of
supportiii " g the proposed structure without settlement. This density compaction test does not warranty any underlying soil
materialt or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of
the r , sed structure, we recommend performing soil borings below all foundation areas of the proposed structure to
verif� diunderlying soil conditions.
Environtental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
require provide a proposal for ng an environmental analysis of the soil materials. The scope of services is
for dete 1-nination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job proi ct specifications were not available at the time the work was performed. Determination ofthe pass/fail compaction
results z e based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98 ofthe AASHTO 7-180 standard for paved areas such as roadways and parking lots. |fdifferent specifications are
required, Federal Engineering &TeotinQ. Inc. ohe|i be notified.
Our finc Ings are relative to the date and areas of our site work and should not be relied upon to represent conditions on
other dates. Any subsequent site disturbances due to water erosion. rain waters, construction activities,excavatno.nvergnown.vegetaton,tnoDioandotherdisturbenoeawi||void\hiotastandtheehnmuotbmre-oompaohedmnd
re4eatelprior toconstruction.
As a m tual protection to clients, the public and ourselves, all reports are submitted are the oon5donde| property of clients
and orization for . publication nfstatements, conclusions or extracts from or regarding our reports is reserved
m
penogN�//oenapproval.
It has b�en a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2