Loading...
HomeMy WebLinkAboutBUILDING PAD PREPARATION VERIFICATIONC S A. M. ENGINEERING AND TESTING, INC. 590N.W. MERCANTILE PLACE PORT ST. LUCIE, FLORIDA 34986 LOCAL OFFICE: (772) 924-3575 FAX: (772) 924-3580 BUILDING PAD PREPARATION VERIFICATION Allied New Technologies �� �� Report Date: August 18, 2008 3901 NW 115 Avenue �� ,01 Project No: PSL1940I Miami, Florida 33178 Report No: 5 Secondary Building Pad Permit No: Allied Fort Pierce Plant 9545 Rangeline Road, Port St. Lucie Ft. Pierce, St. Lucie County, Florida 1. Engineering and Testing, Inc. periodically verified the preparation of the Secondary Building pad at above referenced project including the clearing and grubbing, preparation of the existing subgrade soils placement of fill material. Additionally, field density tests were performed on each layer of fill placed in building pad area. Based on our observations and test results, it is our professional opinion that the fill erial placed in the referenced pad was compacted to 95 percent of the Modified Proctor maximum dry sity and the building pad was prepared in general accordance with the specifications for the project. Si I grade soils beneath bottom of footings were tested and inspected. Undercutting and replacement of subgrade soils with rock fill (No. 57 Stone) for footing subgrade preparation was performed. Our test results an I field observations indicate that it was performed in general accordance with the project specifications. It is ) ur professional opinion that subgrade soils in the bottom of the footings were prepared with and meet the specifications for the project. Fi�,ld inspections and/or density tests results have been submitted separately. M. Engineering and Testing, Inc. has appreciated the opportunity to assist you with this phase of Ir project. If you have any questions regarding this report or need any further information, please call submitted, A. [M. ENGINEERING AND TESTING, INC. 1,1,/( � I g/w W. Moler, P.E. " Geotechnical Engineer Registration No. 60675 WM DataUllied New Technologies, Inc. - Allied Fort Pierce Plant - PSL194011nspectionsU - Secondary Buiding Pad Preparation Letter - raust 18 2008.doc