HomeMy WebLinkAboutBUILDING PERMITJob Lo
Permit
Job De
Code Compliance Division
2300 Virginia Avenue
Ft. Pierce, FL 34982
Phone: (772) 462-2172 Fax: (772) 462-6443
http://www.stiucieco.org/public—works/permifting.htm
I
01/14/2009
1: 9549 RANGELINE RD
Building Commercial
BUILDING PERMIT
53Y
Sid. L ude c
Page 1
Conf #: 694 Permit #: SLC- 0802-0119
City: PORT ST LUCIE
IEW CONSTRUCTION OF A WAREHOUSE- SECONDARY BUILDING, WITH CONCRETE CONTAINER PAD
S/D Lot: Block; Parcel: 4201-111-0001-000/7
i
I
Contractor JOSE R. VEGA VM CONSTRUCTION, INC (305) 220-6557
8370 WEST FLAGLER ST SUITE # 206 MIAMI, FL 33144
I
PropertOwner CHEM-TEX SUPPLY CORP (786) 348-7592
8350 NW 93RD ST MIAMI, FL 33166-2026
Setbac �s Left: Right: Front: Rear: Zoning: IH
Numbe of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 3,524.00
Minimum Floor Elevation: Flood Map: 275F Flood Zone: X Elev:
Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Gode
j including 1hose for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all
requireme Inn
of the 2004 Florida Building Code.
NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the
records o ,this County, and there may be additional permits required from other governmental entities such as water management districts, state
agencies, or federal agencies. s:553.79(10), F.S.
WARNIN I TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDIN 'I IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORN Y BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S.
I
I
Christopher Lestrange
I
Building Official Date
For Automated Inspections, Call (772) 462-1261
For Questions, Call (772) 462-2172
St. Luci , County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and
become null and void if work authorized by such Building Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is
not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance
of the BtIilding Permit.