Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PERMIT RENEWAL REQUEST
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT BUILDING AND CODE REGULATIONS DIVISION 2300 VIRGINIA AVE FORT PIERCE, FL 34982�;<U� (772)462-1553 Fax (772)462-1578 AUG 2 3 2019 PERMIT RENEWAL REQUEST ST. Lucie County, Permitting PERMIT NUMBER: lC�s 11)' O ©� ADDRESS: ` 5OV4� —'R\tj h7J "alb I, 64 M60r—t4 � , am requesting that the above permit be renewed. I understand that I must schedule and pass all required inspections for the permit to be finaled. Further, I understand that this is a ONE TIME RENEWAL and the permit shall expire should I not receive a passing inspection during any six month period during the renewal period. Justification OWNER/BLDR OR CONTRACTOR SIGNATURE DATE e.� c 45 MOG�P— l✓!91qb Print Name STATE OF FL COUNTY OF I q ACKNOWLEDGED BEFORE ME THIS DAY OF V 20 1 BY 1 VC �- nQ WHO IS PERSONALLY KNOWN TO ME -�-6R- ,,,„ = =oirp; MARYT. LORD WCOMMI88101 FF985058 4 11 EXPIRES:AV924 2020 a` B0riMTM10UrKkWW11� M M --------------- FOR OFFICE USE ONLY: Number of Open Inspections: Total Inspections: (Divide open by total to get % of open inspections) Percentage: Original permit fee: x % open = $ Renewal fee Example: [15 divided by 23=.65(%)] $175(permit fee) x .65=$113.75 (renewal fee) Revised 7/21/2014