Loading...
HomeMy WebLinkAboutPROJECT INFORMATIO0Npage I 1 OLIVER TECHNOLOGIES, INC. revision 6107 FLORIDA INSTALLATION INSTRUCTIONS FOR THE RECEIVED MODEL 1101 "V" SERI S ALL STEEL FOUNDATION SYSTEM MODEL 1101"V" (STEPS 1.15) LONGITUDINAL ONLY. FOLLOW STEPS 1-9 A U G 16 2018 FOR ADDING LATERAL ARM: Follow Steps 10 5 � i FOR CONCRETE APPLICATIONS: Follow Steps 1 -M Lucie County, Permitting EN INEERS STAMP -ENGINEERS STAMP 1. SPECK CIRCUMSTANCES: If the following conditions occur - STOP! Contact Oliver Technologies at 1-800-284-7437 : a) Piei,eight exceeds 48" b) Length of home exceeds 76' c) Roof eaves exceed 16" d) Sidewall height exceed 96" e) LorA i ion is within 1500 feet of coast SCANNED it INSTALLATION OF GROUND PAN BY 2. Remov, weeds and debris in an approximate two foot square to expose firm soil for each ground pan (C) . St. LU01(a (000fify 3. Place g' ound pan (C) directly below chassis I-beam . Press or drive pan firmly into soil until flush with or below soil. SPECI ' NOTE: The longitudinal "V" brace system serves as a pier under the home and should be loaded as any other pl r. It is recommended that after leveling piers, and one-third inch (1/3") before home is lowered completely on to piers; complete steps 4 through 9 below then remove jacks. INSTALLATION OF LONGITUDINAL "V" BRACE SYSTEM' NOTE: I YHEN INSTALLING THE LONGITUDINAL SYSTEM ONLY, A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED. SOIL TEST PROBE SO, PULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION. IF PROBE TEST READINGS ARE BETWEEN 175 & 275 A 5 FOOT ANCHOR MUST BE USED. IF PROBE TEST READINGS ARE BETWEEN 276 & 350 A 4 FOOT ANCHOR MAY BE USED. USE GROUND NCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY 5'4" . VERTICAL TIES ARE ALSO REQUIRED ON HOMES SUPPLIED WITH VERTICAL TIE CONNECTION POINTS (PER FLORIDA REG.) . 4. Select (' a correct square tube brace (E) length for set - up (pier) height at support location. (The 18" tube is always used all the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a 40 to 4I5 degree angle is maintained. PIEfI HEIGHT 1.25" ADJUSTABLE 1.50" ADJUSTABLE (Approx.,�5 degrees Max.) Tube Length /`p1 Tube Length I 1i34'` to, 25„ 22"jr18" 24i10/4" to 32 1/4" 32" 18" 1i33" to "4118"l 11�140" to 48" 54" 18" 5. Install'(?) of the 1.50" square tubes (E 118" tube) ) into the "U" bracket (J), insert carriage bolt and leave nut loose for final 6. Place I;beam connector (F) loosely on the bottom flange of the I-beam. 11 7. Slide t1hie selected 1.25',' tube (E) into a 1.50" tube (E) and attach to I-beam connectors (F) and fasten loosely with bolt and nut. 8. Repeal steps 6 through 7 to create the "V" pattern of the square tubes loosely in place. The angle is not to exceed 45 degree' 1 and not below 40 degrees. 9. After all, lbolts are tightened, secure 1.25" and 1.50" tubes using four(4) 1/4"-14 x 3/4" self -tapping screws in pre -drilled holes. INSTALLATION OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM - THE MO EL 1101 "V" (LONGITUDINAL & LATERAL PROTECTION) ELIMINATES THE NEED FOR MOST STABILIZER PLATES & FRAME TIES. NOTE: THE USE OF THIS SYSTEM REQUIRES VERTICAL TIES SPACED AT 5'4'. OUR FOOT (4') GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. 10. Install 4,000 11. NOTE: 12. Select or 72" 1 13. Install 14. Slide 1 raining vertical tie -down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerline I be sized according to soil torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of require a 5' anchor per Florida Code. `` //�� :h system is required to have a frame tie and stabilizer attached I teri s bili g I In is frame tie & plate needs to be located within 18" from of center ground pan. g ee correct square tube brace (H) length for set-up lateral transverse at support location. The lengths come in either 60" )ths. (With the 1.50" tube as the bottom tube, and the 1.25" tube as the inserted tube.) 1.50 transverse brace (H) to the ground pan connector (D) with bolt and nut. " transverse brace into the 1.50" brace and attach to adjacent I-beam connector ( I ) with bolt and nut. sn" tranmiar to arm fn 1 9r," frnnevarea arm ncinn fnnr it 1/A" - 1A v Q/A" calf-fonninn cr•ra,uc in nra-ririllael hnlac OLIVER TECHNOLOGIES, INC. Telephone: 931 7d6 4555 1-800-284-7437 Fax: 931 796 8811 12/02/2018 www.oliveriechnologies.com page 2 INSTALLS 1ON USING CONCRETE RUNNER / FOOTER revision 6/07 16. A con rete runner, looter or slab may be used in place of the steel ground pan. a) Th concrete shall be minimum 2500 psi mix b) A i pncrete runner may be either longitudinal or transverse, and must be a minimum of deep with a minimum width of 16 inches Ion itudinally or 18 inches transverse to allow proper distance between the concrete bolt and the edge of the concrete (see below). c) F 'ters must have minimum surface area of 441 sq. in. (i.e. 21" square), and must be a minimum of 8" deep. d) If full slab is used, the depth must be a 4" minimum at system bracket location, all other specifications must be per local jurisdiction. Sp; cial inspection of the system bracket installation is not required.. Footers must allow for at least 4" from the concrete bolt to the edge Of ie concrete. NOTE: Th bottom of all footings, pads, slabs and runners must be per local jurisdiction. LONGITU INAL: (Model 1101 LC "V") 17. When! sing Part # 1101-W CPCA �wgtset). imply install the bracket in runner/footer OR When installing in cured concrete use Part # 10 D CA Mn set). The. 1101 (dryset) CA bracket is attached to the concrete using (2) 5/8"x3" concrete wedge bolts (Simpson part # S1623,00H 5/8" X 3" or Powers equivalent). Place the CA bracket in desired location. Mark bolt hole locations, then using a 5/8" diameter mason bit, drill a hole to a minimum depth of 3". Make sure all dust and concrete is blown out of the holes. Place wedge bolts into drilled b holes, J en place 1101 (dry set) CA bracket onto wedge bolts and start wedge bolt nuts. Take a hammer and lightly drive the wedge bolts down hitting the nut (making sure not to hit the top of threads on bolt). The sleeve of concrete wedge bolt needs to be at or below the top of n , rete. Complete by tightening nuts. LATERALI Model 1101 TIC "V") 18. For we set (part # 1101-W-TACA) installation simply install the anchor bolt into runner/footer. For dry set installation (part # 1101-D-TACA) mark t Pit hole locations, then using a 5/8" diam. masonry bit, drill a hole to a minimum depth of 3". Make sure all dust and concrete is blown t of the hole. Place wedge bolts (Simpson part #S162300H 5/8" X 3" or Powers equivalent) into (D) concrete dry transverse conne ' or and into drilled hole. If needed, take a hammer and lightly drive the wedge bolts down by hitting the nut (making sure not to hit the topf threads on bolt), then remove the nut. The sleeve of concrete wedge bolt needs to be at or below the top of concrete. 19. When L ing part # 1101 CVW (wetset) or 1101 CVD (dryset), install per steps 17 & 18. Notes: 1. LENGTH OF HOUSE IS THE ACTUAL BOX SIZE 2. • = STABILIZER R.ATEAND FRAME nE LOCATION (needs ti be bcated Wthiri 18 inches of caibrofg arld pan ora mebe) a gD-- LOCATION OF LONGFENALBRACING ONLY 4.17-1 N=r- ONGffUDINALLOCAl10NS ;II ALL WIDTHS; AN SIG—=�i II •' LENGTHS UP TO 52' • i ALL WIDTHS; AND LENGTHS OVER 52' TO 80' • • ,7 • WITH 5/12'ROOF .PITCH, REQUIRE PER FLORIDA REGULATIONS , is for Home length's up to 52' ,and 8°systems.,for l om'es over 52' arld'up-80' Qihe stablllzer';a ale tie: requjred. at each lateral bracing system .•' II Flo ,' provetl 4 ground anchors a$ be used in all location' twhore home ' ufacturcrs specs fuaftoms or sidewall straps are in a of 4,000 lbs. These t bons require a W anchor. Florida Code. D Ground Pan transverse connectors Longitud dry concrete' bracket part # 11' 1 D-CPCA I Wet brae et part # 1101 W PCA not shown Me approl 4�' groundd ;hors may used in a0 allons except where home nufacturer<pecifications sklewall steps are in ass of 4.0 lbs. These ations requ e a W anchor. r Florida. Transverse arm I beam connector <H ` Transv;rse arm Top (1.25") bottom (1.5") E 1. eTu 5 ) Top by (1.25� Bottom (1.5") Ground Pan U bracket transverse connectors F :*%f brace I beam connectors J ground Pan .�-- V Bracket page 3 revision 6/07 C = GROUND PAN D = GROUND PAN CONNECTOR U BRACKETS TRANSVERSE E = TELESCOPING V BRACE TUBE ASSEMBLY W/ 1.5 BOT TOM TUBE AND 1.25 TUBE INSERT F = "W BRACE 1-BEAM CONNEC- TORS ASSEMBLY H = TELESCOPING TRANSVERSE ARM ASSEMBLY I = TRANSVERSE ARM I -BEAM CONNECTOR J= V PAN BRACKET Model # 1101 W" Alternate Hole for Narrower Beam Flange : � �z, �<��q Transverse arm I beam connector 1— �H Transverse arm — Top (1.25') , bottom (1.5" ) E V' BraceTub/ Top (1.257 Bottom (1.5") Concrete Footer/ Runner ii� 1 02/02/2018 Grade 5 -1/2" x 1" Carriage Bolt & Nut 1/2" F :'V" brace I beam connectors \Y/ J Concrete �r *W Bracket u Model # 1101 CV" OLIVER TECHNOLOGIES, INC. 1-800-284-7437 Model 1101 CVD Model 1101 CVW not shown C = CONCRETE FOOTER/RUNNER D = CONCRETE U BRACKET TRANSVERSE CONNECTOR (oonnects with grade 5 40 x 2 la"carriage bolt & nut) E = TELESCOPING V BRACE TUBE ASSEMBLY W/ 1.5 BOT TOM TUBE AND 1.25 TUBE INSERT F = `tF BRACE I -BEAM CONNECTOR ASSEMBLY (connects with grade 5 - 1/2" x 47 carriage bolt & nut) H = TELESCOPING TRANSVERSE ARM ASSEMBLY I = TRANSVERSE ARM I -BEAM CONNECTOR (connects with grade 5 4/2" x 21/2— carriage bolt & nut) J= CONCRETE "V' BRACKET (connects with grade 5 -1/2" x 4r carriage bolt & nut) Telephone: 931 796 4555 Fax: 931 796 8811 www.ofivertechnologies.com