Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTi Planning & Development Services SCANNED Building & Code Regulation Division 9 BY 2300 Virginia Ave `St kpft 9(gym Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT IT # : 1808-0526 JOB ADDRESS: 5140 Dunn Rd R: A&G Concrete Pools CONTROL CONTRACTOR: Hannan Environmental Services,Inc. CONTROL LICENSE #: IB99418 the undersigned, hereby certify that we have pretreated the above described construction for erranean termites in accordance with the standards of the National Pest Control Association. feet if area treated: 78 Lft of solution: •12% of Treatment: 10/12/18 1st Treatment Re -Treat 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: Termidor He Total gallons used: 24 Gallons Time of Treatment: 10:46 am Slab 1st Treatment Re -Treat 10/12/18 Pools 1st Treatment Re -Treat P ri for Final Inspection 10/15/18 Sign re o nat,o Date '..r-w/dn e.• There must be a completed form for each required treatment or re -treatment and this form must be on the job to be picked up by the Inspector at time of each Inspection or the scheduled Inspection will fail and areInspection charged. F13G104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobske posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the per is issued to and another copy for the building permit Ales The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establlsh a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. 7/24/2014