Loading...
HomeMy WebLinkAboutPROJECT INFORMATIONPoolBond PB-2008 Water Bonding Fitting Follow these ImDortant S Step--_2 Fitting Orientation Q-9 PoolBozond (n A. PoolBond Casting Part Number PB-2008 with B. Split Bolt Connector, UL rated for Direct Burial. C. Solid #8 Copper wire, not supplied.. 16 Instal', in Pool Plumbing using a Plumbing Tee. !*Always install the Poolbond Tee with the fitting I in horizontal. or verticallly� down orientation to avoid trapped air ire pool plumbing. Horizontal All Installations Part Number 1. " N PT Pipe Thread, MR-0 Above Ground Pools -- --------------------------------- -------------------- h r to Install In -Ground Pools Above Ground Pools r Gov IF id *,mumi ;a 15 1 ...................... 66, Un Mr Installed near Pool Equipment OR— Installed at Return Fitting eInstall or. In -ground & Above Ground Pools, Spas, Tut)s; & Fountair-s- * bumf NOT buthe Poo:Bond fitting, it should be accessible for periodic Inspec-fion. A sprinkler valve box provides -giood access. * IMPORTAISIf - Install PoolBon-d fitting at least 3" below water level to assure the fitting is contained in the pool water ever, when equipment is shut down. ............... t% reirma-%,las. Company Step 4 Installing voowond Aspen Cirde 0 First, install the male threaded fitting in the threaded tee 1dry fift) unt 11 Pueblo, Colorado 81006 the fitting just starts to'tiahten on the threaded tPe. Count the number R1 of turns it takes Docum;ntthi-b nUmhni- qnA r1iQcqi?i:nmn f1hea JG- U-1 0 ADDIV thread sealant. Use Mumber Mine Dope orTeflon Paste do --rf use t6fion Tape. PM F, 0 Reassemble the. t,,vo parts using the number of turns recorded in the first sTpnanil TlQ_nT0Fi TWn mr%rPh;rn.Q "n nnt nxiamnMon to immirl Aciml_n W1 r 5 C« I * F M T r3i . 6. 1 -sMc 1; F VT 9 Jlastiu RECOMMENDED N OT R E C01 M M 1141, 1 �.,r I - VT: I' pip,_ Revision 8/6/14