HomeMy WebLinkAboutPROJECT INFORMATIONPoolBond PB-2008 Water Bonding Fitting
Follow these ImDortant S
Step--_2 Fitting Orientation
Q-9 PoolBozond (n
A. PoolBond Casting Part Number PB-2008 with
B. Split Bolt Connector, UL rated for Direct Burial.
C. Solid #8 Copper wire, not supplied..
16 Instal', in Pool Plumbing using a Plumbing Tee.
!*Always install the Poolbond Tee with the fitting
I in horizontal. or verticallly� down orientation to
avoid trapped air ire pool plumbing.
Horizontal
All Installations
Part Number
1. " N PT Pipe Thread,
MR-0
Above Ground Pools
-- --------------------------------- --------------------
h r to Install In -Ground Pools Above Ground Pools
r
Gov IF
id
*,mumi ;a 15 1
......................
66, Un Mr Installed near Pool Equipment OR— Installed at Return Fitting
eInstall or. In -ground & Above Ground Pools, Spas, Tut)s; & Fountair-s-
*
bumf NOT buthe Poo:Bond fitting, it should be accessible for periodic Inspec-fion. A sprinkler valve box provides -giood access.
* IMPORTAISIf - Install PoolBon-d fitting at least 3" below water level to assure the fitting is contained in the pool water ever, when equipment is shut down.
...............
t%
reirma-%,las. Company
Step 4 Installing voowond
Aspen Cirde
0 First, install the male threaded fitting in the threaded tee 1dry fift) unt 11 Pueblo, Colorado 81006
the fitting just starts to'tiahten on the threaded tPe. Count the number R1
of turns it takes Docum;ntthi-b nUmhni- qnA r1iQcqi?i:nmn f1hea JG- U-1
0 ADDIV thread sealant. Use Mumber Mine Dope orTeflon Paste do --rf use
t6fion Tape.
PM
F,
0 Reassemble the. t,,vo parts using the number of turns recorded in the
first sTpnanil TlQ_nT0Fi TWn mr%rPh;rn.Q "n nnt nxiamnMon to immirl Aciml_n W1 r 5 C« I * F M T r3i . 6. 1 -sMc 1; F VT 9
Jlastiu
RECOMMENDED N OT R E C01 M M
1141, 1 �.,r I - VT: I' pip,_
Revision 8/6/14