Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 10-5-18Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: ae) JOB ADDRESS: 12 JQ✓�t ce BUILDER/CONTRACTOR: T%� I Y� 92 PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. CONTROL LICENSE #: JB175775 We, `the undersigned; hereby certify that we have pretreated the above described construction for subtrranean termites in accordance with the standards of the National Pest Control Association. Squ , re feet if area treated: 00 of solution:.05% st Treatment Re -Treat 1st Treatment Re -Treat Is' Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: 310 Time of Treatment: .2 y06 Slab 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter for Final Inspection I�LS r� S' re of Exterminator Date Notel There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee chbraed. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall! el provided to receive duplicate Treatment Certificates as each required protective treatment is completed, pro V41�, g a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treateb, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be co �� leted prior to final building approval. St Lul County requires for the final inspection for CO, a Permanent Sticker to be placed on the a„ectrical panel box cover, listing all the treatments and dates of applications. Revised 17/24/2014 F