HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 10-30-18planning & Development Services
Building & Cade Regullaltion Division
2300 Virginia Ave
Pert Pierce, FL 34982
772-462-2172 Pax 76 2-462-6443
!" i is i a c: a. 1r E V
C�?i S i iRUCTTrr)r0Tl_1F�:lT
.8CA NE0
.MIT #: 1 of 01% l3 J E ADDRESS:
LDER/CONTRACTOR: Cc
T CONTROL CONTRACTOR: EVICT-A-B G TERMITE & PEST CONTROL INC.
T CONTROL LICENSE #: JB175775
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: Chemicals used: DOMINION 21.
Percentage of solution:.05'lo Total gallons used:
Date of TT tment: / U- 30 i
V Footing F o g
�Is�reatment
Re -Treat
Driveway
1st Treatment
Re -Treat
Other
11t Treatment
Re Treat
Time of Treatment: = a�
`y'Slab
reatment
Re -Treat
Pools
1st Treatment
Re -Treat
erim ter for Final Ir
Of
Note: There must be a completed form for each required treatment or r -tr tment and this form must be on the job
site to be picked up by the Inspector at time of each inspection or the schdoluled lnspectlon wlil fall and a re-inspect/on
fee charged.
FBC104.2.16 Certificate of Protective Treatment for prevention of termites A weather resistant jobsfte posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is completed,
providing a copy for the person the permit Is issued to and another copy for the bulld/ng permit files, The Treatment
Certificate shall provide the product used, identity of the applIcator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval,
St Lucie County requires for the ff nM inspection for GO, a (Permanent Sticker to be placed on
the electricei panel box cover, listOng ail the treatments and Metes of applications.
7/24/201A