Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 3-28-19planning & [Development Services Building & Code RegulatiOn Division 2300 Virginia Ave !Fort Plerce, ft 34982 772-462-2172 Fax 772-462-6443 (CER=rXFg(CA=rE (OF TERMnTF TREATMENT C(DNSTRuCTIONSOIL TREATMENT (PERMIT #: 10� D3— JOB ADD ESS: 5a 1/�� BUILDER/CONTRACTOR: _ / ►�cs�fe, :E�VICA-BUG TERMITE &PEST CONTROL INC.PEST CONTROL CONTRACTOR PEST CONTROL LICENSE #: JB176775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: � 6� Percentage of solution: •05°1° Date of Treatment: 44 la - ---- -Footing 1st Treatment Re -Treat 6riveway pL ist Treatment -r�� i� Other Re —4�3St Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: -so Time of Treatment: Slab ist Treatment Re -Treat Pools 1st Treatment Re -Treat Peri _inalInspection Signature o Exterminator Date Note: There must be a completed form for each required treatment or re -treatment and this form must be on the Job site to be picked up by the Inspector at time of each Inspection or the scheduled inspection w111 fall and a re -Inspection fee rharoed. FEl C104.2.6 Certlflcate of protective Treatment for prevention of termites A weather resistant jobslte posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is completed, providing a copy for the person the permit Is issued to and another copy for the building permit flies. The Treatment Certificate shall provide the product used, Identity of the applicator, time and date of the treatment, s/te location, area treated, chemical used, percent concentratlon and number of gallons used, to establish a verl>iable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final bullding approval, St Lucie COuntY requires for the final inspection for CO, a permanent Sticker to he placed on the epectricei panel box covero Hosting ell the treatments and dates Of aPPliiciatiOns- RcYiocd 7124/2014