HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE04-11-' 19 12:40 FROM-
7728787658 J-344 P0005/0008 F-541
ve
.%anaa Ave.
Fa- X +I 72-462"6 Gods Q
�7
rfor -Day-T rary' Power Release
. Lucc j c®unto/ .
THE UND:ERMNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRMED
PROPERTY, FOR A. P OD'NOTTQ EXCEED TMIRTy (30)•PAYS, FOR THE MOOSE OFT'ESi*G SYSTEMS
AND EQUIPMENT IN PREPARATION FOR ARNAL INSPECTION. IN CONSIDERATION OF -APPROVAL OF•THE
REQUEST WE- HEREBY ACdZ11i0' .,i=SSE-AND AGE At I=t3.t.Lows:
1. 7his Crary POW .rnJtm is. aftestO for the above meted purpos& mr�9y, and mere vAn -be rasa
octVpancy of any type, Other than that permitted by .00n on d: r►g ft time period.
Z• As'Hj 'ess by Aw stgnattir , �nre hereby agree to abide by all tefns and cordidons of this agrenerit,
inclLIft Building Division Policy, which -is Incorporated heWjn by reference.
3. All condit ts, and requiremer� lis�i• in the at��hed doaher t entitled uRequiremenis for 30 Day
Power for TeOng" My .lean fulfilIed'and the premise is ready for compliance inspector.
4. All 'rogUem far an a ion beyond 3o days must be:made in wridng bo the Building em statgng
the reap For the request. -Power may be removed" from the site an0lbr a Stop Work Order issued if
the Fihal•Inspettion has not been approved within 30 days. A fee of $100,60,will be Mq&fred•to Wt
the Stop Work Order.
WE HEREBY RELEASE AND AOR,EE TO HOLD HARMLE , ST, LURE COUNTY, AND THM EMPLOYEES FROM
ALL LIAIBILMES AND CLAIMS OF ANY TYPE: OF NA`i.UR:E• VIf3-I•IC,H MAY ARISE NOW OR IN THE. FUTURE OUT
OF TM?FtM5ACr10N, .1MCLUD1W A Y DAMaOE v1.MI ',MAY BE INWR DUE Ti'7 THE
IDIS:CANN�iQN 4 L .I:GT C,4L POD 1N THE EVENt OF V1(jLA1tN OF TM AGMEM