Loading...
HomeMy WebLinkAboutKSM REPORT0 o(p9lo KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 1FAX (772) 589-6469 SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 DATE TESTED December 7, 2018 KSM JOB # : 184199-1d/SH/cv PERMIT # 1808-0696 ReCSNEp Ott CONTRACTOR Wynne Development Pel 9 Aft JOB LOCATION 7 La Villa Court S" LU4r epar n,ent Spanish Lakes Country Club Village county Fort Pierce, Florida ITEM TESTED Compacted Foundation Fill TEST LOCATION DEPTH * PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE COMPACTION 1. S.E. 0" - 12" 38 105.8 109.1 97.0 2. S.W. 38 105.9 1197.1 3. Center 39 107.0 If 98.1 4. N.W. 39 106.8 .97.9 5. N. E. 37 105.0 96.2 Soil Description: Brown Sand In Place Moisture: 11.2 Percent Optimum Moisture: 12.0 Percent Max. Dry Density: 109.1 P.C.F. @ Test Locations The Density & Penetrometer Readings Indicate the Degree of Compaction Meets Minimum Required for Staked Foundation. * Ren..\001000s en to Natural Grade 110.0 i W E G 109.0 I_.._..—••—. �. r.._ —.._. H I I I I I I T j I I I I P 108.0 C • j I I I I I F 107.0 _.I_.._I._..�.._.. r .._..I_.._. D R Y 106.0 �— — 9 10 11 12 13 14 15 j d G Bell r, P.E. nj &60)St. � Count BuildingDepartment o4 Dfttt \I �c.com �'ONIAIL0�on\ald G. Keller, P.E.: 37293 / SI Lic. No.: 860 Moisture - % of Dry Weight / Julie E. Keller, P.E.: 68366