Loading...
HomeMy WebLinkAboutPRODUCT APPROVAL - UNDERLAYMENTSFlorida Building Code Online _ ,� ,� . ",aeai�itot� �gk?��,�s t'g�sl,�ti�s ccierrAdfa�Pk t Product Approval Q -- !USER: Public User Product Approval Menu > Product or Application Search > Application List > Application Detail FL # FL2346-R7 CONCEALED FASTENERS OR ATTACHMENT; Application Type Revision ETTIERESFONSIBILITYOFTHE Code Version SC BYE CONTRACTOR OF RECORD Application Status Approved Approved St Lucie County Comments Archived C.I THESE PLANS AND ALL PROPOSED Mi ' Product Manufacturer Warrior Roofing Manufacturing ARE SUBJECT TO ANY CORRECTIONS Address/Phone/Email 3050 Warrior Road REQUIRED BY FIELD INSPECTORS THAT Tuscaloosa, AL 35404 MAY BE NECESSARY IN ORDER TO (205) 553-1734 Ext 115 Steven@WarriorRoofing.net COMPLY WITH ALL APPLICABLE CODES. Authorized Signature Steven Crew Steven@WarriorRoofing.net Technical Representative Steven Crew Address/Phone/Email 3050 Warrior Road Tuscaloosa, AL 35404 (205) 553-1734 Ext1024 Steven @WarriorRoofing. net Quality Assurance Representative Steven Crew Address/Phone/Email 3050 Warrior Road Tuscaloosa, AL 35404 (205) 553-1734 Ext 1024 Steven@WarriorRooST, A&UNVIB 2,550�'�1 LUCIE ItE VIE'"VED FOR CEG Category Roofing 'VIE VED Subcategory Underlayments DATE �S'� MU D£ KEPT ON JOB Method Test Report \01N5PZ TION WILL DE HADE G R Testing Lab PRI Construction Materials Technologies, LLC Quality Assurance Entity Keystone Certifications, Inc. Quality Assurance Contract Expiration Date 10/05/2021 Validated By Jesus Gonzalez, P.E. C!i Validation Checklist - Hardcopy Received Certificate of Independence FL2346 R7 COI PRI CMT Cert of Independence.pdf Referenced Standard and Year (of Standard) Standard Year ASTM D226 2009 ASTM D4869 2016 Equivalence of Product Standards Certified By Approved Testing Lab FL2346 R7 Equiv FBC 2017 Standards Equivalencypdf File COPY https://wv,M.florid6building.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgtOc8bnSknRpsgx%2fSloLpOST46ODBB%2baF4%3d 1/2 6/3/2018 Florida Building Code Online Product Approval Method Date Submitted Date Validated Date Pending FBC Approval Date Approved Summary of Prndurtc Method 1 Option B 01/17/2018 01/17/2018 01/17/2018 04/10/2018 FL # Model, Number or Name Description 2346.1 #15 and #30 roofing felt ASTM D 226 Tested Limits of Use Installation Instructions Approved for use in HVHZ: Yes FL2346 R7 II InstallationInstructions.pdf Approved for use outside HVHZ: Yes Verified By: PRI Construction Materials Technologies, LLC Impact Resistant: N/A Test Reports Design Pressure: N/A FL2346 R7 TR 15A Test Re or .pdf Other: Primary roof covering should be installed immediately FL2346 R7 TR 30A Test Report.pdf after felt. Roofing felt is not intended to be an unprotected weathering surface. 2346.2 15w and 30w roofing felt ASTM D 4869 Tested Limits of Use Installation Instructions Approved for use in HVHZ: No FL2346 R7 II InstallationInstructions.pdf Approved for use outside HVHZ: Yes Verified By: PRI Construction Materials Technologies, LLC Impact Resistant: N/A Test Reports Design Pressure: N/A FL2346 R7 TR 15w Test Report.pdf Other: Primary roof covering should be installed immediately FL2346 R7 TR 30w Test Report.pdf after felt. Roofing felt is not intended to be an unprotected weathering surface. Back P:ext Contact Us :: 2601 Blair Stone Road, Tallahassee FL 32399 Phone: 850-487-1824 The State of Florida is an AA/EEO employer. Cogylight 2007-2013 State of Florida.:: Priv cy Statement :: Accessibility Statement :: Refund Statement Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic mail to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. -Pursuant to Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S., please click here . Product Approval Accepts: W1 ® eCheik M Credit Card Safe https://wwvlrlfloridabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgtOcBbnSknRps9x%2fSIoLpOST460DBB%2baF4%3d 2/2 WARRIO& ROOFING MANUFACTURING P.O. BOX 40185 • TUSCALOOSA, AL 35404 • PHONE (205) 5534734 • FAX (205) 553-1755 .t: 193 LEROY ANDERSON ROAD • MONROE, GA 30655 • PHONE (770) 207-0695 • FAX (770) 207.OT75 323 DEVELOPMENT AVENUE • CHAMBERSBURG, PA 17201 • PHONE (717) 709-0323 • FAX (717) 709-0027 Roofing Felt Installation Recommendations Be aware that roofing felt should not be walked upon prior to fastening into position. Proper safety equipment is recommended for all installations. Also, the roof decking should be clear of debris and moisture prior to installation of the roofing felt. Roofing felt should be installed from the bottom of the roof in horizontal layers to increase the water shedding ability of the felt. The initial layer of felt should be installed to cover the bottom edge of the decking, from edge to edge. Overhang is not required. Anchor the top corner of the felt after it has been properly positioned and roll the felt out across the roof. Pay careful attention to roll the felt out smoothly, avoiding wrinkles as you move across the roof. The top edge of the felt should be fastened no less than every eight inches. The middle and bottom edge should also be fastened no less than every eight inches. Fasteners should be applied no less than every eight inches along the eaves. The next.course of felt should also be aligned with the roof edge and should overlap the previous course two inches (sometimes referred to as head lap). In the event you get to the end of a roll prior to getting to the opposite edge of the roof, begin a new roll with a four inch overlap over the end of the prior roll (sometimes referred to as end lap). The same fastening pattern used on the middle and bottom of the initial course should be used for each subsequent course. For the top of each subsequent course, fasten intermittently to hold the top edge in place until the next course is applied. The fasteners in the bottom of the next course will hold the top of the previous course securely. Continue up the roof in this manner. Be sure to firmly fasten the top of the final course if it terminates at the top edge of the roof. Otherwise, overlap the felt over the ridge and secure then begin at the bottom of the other side of the ridge and repeat the process. In valleys, lay a vertical section of roofing felt the length of the valley prior to the installation of the horizontal runs of roofing felt. If you use more than one section of roofing felt in a valley, be certain to start at the bottom and overlap each. Subsequent . length a minimum of two inches as you move up the valley to insurxe prQpe�ratex shedding. f'� ��� In the event some wrinkles are created while fastening down a course of felt, slice the wrinkles and fasten them flat to the deck. Then seal the cuts with waterproofing cement. Installation of the primary roof covering (ex. Shingles) is recommended immediately after felt installation. NOTE: LOCAL BUILDING CODES MAY REQUIRE A DIFFERENT FASTENING PATTERN AND/OR SPECIFIC FASTENER TYPES THAN RECOMMENDED BY THESE INSTRUCTIONS. PLEASE CONTACT YOUR LOCAL BUILDING CODE ADMINISTRATOR FOR THE EXISTENCE OF REGIONALLY SPECIFIC FASTENING REQUIREMENTS.