HomeMy WebLinkAboutPRODUCT APPROVAL - UNDERLAYMENTSFlorida Building Code Online _
,� ,� . ",aeai�itot� �gk?��,�s t'g�sl,�ti�s ccierrAdfa�Pk
t Product Approval
Q -- !USER: Public User
Product Approval Menu > Product or Application Search > Application List > Application Detail
FL #
FL2346-R7 CONCEALED FASTENERS OR ATTACHMENT;
Application Type
Revision ETTIERESFONSIBILITYOFTHE
Code Version
SC BYE CONTRACTOR OF RECORD
Application Status
Approved
Approved
St Lucie County
Comments
Archived
C.I
THESE PLANS AND ALL PROPOSED Mi '
Product Manufacturer
Warrior Roofing Manufacturing
ARE SUBJECT TO ANY CORRECTIONS
Address/Phone/Email
3050 Warrior Road
REQUIRED BY FIELD INSPECTORS THAT
Tuscaloosa, AL 35404
MAY BE NECESSARY IN ORDER TO
(205) 553-1734 Ext 115
Steven@WarriorRoofing.net COMPLY WITH ALL APPLICABLE CODES.
Authorized Signature Steven Crew
Steven@WarriorRoofing.net
Technical Representative Steven Crew
Address/Phone/Email 3050 Warrior Road
Tuscaloosa, AL 35404
(205) 553-1734 Ext1024
Steven @WarriorRoofing. net
Quality Assurance Representative
Steven Crew
Address/Phone/Email
3050 Warrior Road
Tuscaloosa, AL 35404
(205) 553-1734 Ext 1024
Steven@WarriorRooST, A&UNVIB 2,550�'�1
LUCIE
ItE VIE'"VED FOR CEG
Category
Roofing
'VIE VED
Subcategory
Underlayments
DATE
�S'� MU D£ KEPT ON JOB
Method
Test Report
\01N5PZ TION WILL DE HADE
G R
Testing Lab
PRI Construction Materials Technologies, LLC
Quality Assurance Entity
Keystone Certifications, Inc.
Quality Assurance Contract Expiration Date
10/05/2021
Validated By
Jesus Gonzalez, P.E.
C!i Validation Checklist - Hardcopy Received
Certificate of Independence
FL2346 R7 COI PRI CMT Cert of Independence.pdf
Referenced Standard and Year (of Standard)
Standard Year
ASTM D226 2009
ASTM D4869 2016
Equivalence of Product Standards
Certified By Approved Testing Lab
FL2346 R7 Equiv FBC 2017 Standards Equivalencypdf
File COPY
https://wv,M.florid6building.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgtOc8bnSknRpsgx%2fSloLpOST46ODBB%2baF4%3d 1/2
6/3/2018
Florida Building Code Online
Product Approval Method
Date Submitted
Date Validated
Date Pending FBC Approval
Date Approved
Summary of Prndurtc
Method 1 Option B
01/17/2018
01/17/2018
01/17/2018
04/10/2018
FL #
Model, Number or Name
Description
2346.1
#15 and #30 roofing felt
ASTM D 226 Tested
Limits of Use
Installation Instructions
Approved for use in HVHZ: Yes
FL2346 R7 II InstallationInstructions.pdf
Approved for use outside HVHZ: Yes
Verified By: PRI Construction Materials Technologies, LLC
Impact Resistant: N/A
Test Reports
Design Pressure: N/A
FL2346 R7 TR 15A Test Re or .pdf
Other: Primary roof covering should be installed immediately
FL2346 R7 TR 30A Test Report.pdf
after felt. Roofing felt is not intended to be an unprotected
weathering surface.
2346.2
15w and 30w roofing felt
ASTM D 4869 Tested
Limits of Use
Installation Instructions
Approved for use in HVHZ: No
FL2346 R7 II InstallationInstructions.pdf
Approved for use outside HVHZ: Yes
Verified By: PRI Construction Materials Technologies, LLC
Impact Resistant: N/A
Test Reports
Design Pressure: N/A
FL2346 R7 TR 15w Test Report.pdf
Other: Primary roof covering should be installed immediately
FL2346 R7 TR 30w Test Report.pdf
after felt. Roofing felt is not intended to be an unprotected
weathering surface.
Back P:ext
Contact Us :: 2601 Blair Stone Road, Tallahassee FL 32399 Phone: 850-487-1824
The State of Florida is an AA/EEO employer. Cogylight 2007-2013 State of Florida.:: Priv cy Statement :: Accessibility Statement :: Refund Statement
Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic
mail to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. -Pursuant to Section
455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have
one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to supply a personal
address, please provide the Department with an email address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S.,
please click here .
Product Approval Accepts:
W1 ® eCheik M
Credit Card
Safe
https://wwvlrlfloridabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgtOcBbnSknRps9x%2fSIoLpOST460DBB%2baF4%3d 2/2
WARRIO& ROOFING MANUFACTURING
P.O. BOX 40185 • TUSCALOOSA, AL 35404 • PHONE (205) 5534734 • FAX (205) 553-1755
.t:
193 LEROY ANDERSON ROAD • MONROE, GA 30655 • PHONE (770) 207-0695 • FAX (770) 207.OT75
323 DEVELOPMENT AVENUE • CHAMBERSBURG, PA 17201 • PHONE (717) 709-0323 • FAX (717) 709-0027
Roofing Felt Installation Recommendations
Be aware that roofing felt should not be walked upon prior to fastening into position.
Proper safety equipment is recommended for all installations. Also, the roof decking
should be clear of debris and moisture prior to installation of the roofing felt.
Roofing felt should be installed from the bottom of the roof in horizontal layers to
increase the water shedding ability of the felt. The initial layer of felt should be installed
to cover the bottom edge of the decking, from edge to edge. Overhang is not required.
Anchor the top corner of the felt after it has been properly positioned and roll the felt out
across the roof. Pay careful attention to roll the felt out smoothly, avoiding wrinkles as
you move across the roof. The top edge of the felt should be fastened no less than every
eight inches. The middle and bottom edge should also be fastened no less than every
eight inches. Fasteners should be applied no less than every eight inches along the eaves.
The next.course of felt should also be aligned with the roof edge and should overlap the
previous course two inches (sometimes referred to as head lap). In the event you get to
the end of a roll prior to getting to the opposite edge of the roof, begin a new roll with a
four inch overlap over the end of the prior roll (sometimes referred to as end lap). The
same fastening pattern used on the middle and bottom of the initial course should be used
for each subsequent course. For the top of each subsequent course, fasten intermittently
to hold the top edge in place until the next course is applied. The fasteners in the bottom
of the next course will hold the top of the previous course securely.
Continue up the roof in this manner. Be sure to firmly fasten the top of the final course if
it terminates at the top edge of the roof. Otherwise, overlap the felt over the ridge and
secure then begin at the bottom of the other side of the ridge and repeat the process.
In valleys, lay a vertical section of roofing felt the length of the valley prior to the
installation of the horizontal runs of roofing felt. If you use more than one section of
roofing felt in a valley, be certain to start at the bottom and overlap each. Subsequent .
length a minimum of two inches as you move up the valley to insurxe prQpe�ratex
shedding. f'�
���
In the event some wrinkles are created while fastening down a course of felt, slice the
wrinkles and fasten them flat to the deck. Then seal the cuts with waterproofing cement.
Installation of the primary roof covering (ex. Shingles) is recommended immediately
after felt installation.
NOTE: LOCAL BUILDING CODES MAY REQUIRE A DIFFERENT FASTENING
PATTERN AND/OR SPECIFIC FASTENER TYPES THAN RECOMMENDED BY
THESE INSTRUCTIONS. PLEASE CONTACT YOUR LOCAL BUILDING CODE
ADMINISTRATOR FOR THE EXISTENCE OF REGIONALLY SPECIFIC
FASTENING REQUIREMENTS.