Loading...
HomeMy WebLinkAboutLONGITUDUNAL AND LATERAL STABILIZING SYSTEMSH cc 2 ()U. .; ts al w A AD /f!"aifch0,f'S,ft II81$ Lateral S[ablifting SO" 11 sods requirements For all wind zones. Eliminates is ties and stabilizers, saving time and money. versatile: provides combined lateral and longitudinal support; or only lateral, or only longitudinal Flat pad design installs easily, eliminates digging and driving foundation pad into ground lop quality, ttuduy yduyt: FitLR91 PIUUIU05 stability Utilizes adjustable tubing for structural Integrity with less inventory Easy to install and neatly packaged for warehousing ana transport: Lateral Longitudinal LaterailLongitudiEnal LU OC UVIVU6 St Lucie Cau,tY Top-quality heavy gauge steel throughout system Versatile: provides combined lateral and longitudinal support, or only lateral, or only longitudinal . . Flat pad d"grt lrastellst easily, eliminates digging and driving foundation pad into ground ��anchor$®tl� Longitudinal System Includes a t - 20" Galvanized Steel Pad 2 - Beam Clips with Hardware 2 -1.5° Square Bracing Tubes 0120355 39'* Longitudinal System for All Zones 919.0000 qW ` 1.V1191tuallnd OysiWuI rut rdl lannno 0120357 830" Longitudinal System for All Zones Late l/L®ngitudinal Systam Includes: 1 - 26" Galvanized Steel Pad . 7 - bu" AdJUM010 LMMI TWO WO t"i8ldVUdFO 2 - Beam Clips With Hardware 2 - '1.V Square Bracing Tubes 0120377 39"* LaterallLongitudinal System for All Zones. 0120378 4411* Lateral/Longitudinal System for All Zones 9120279 fl"" WgWll --D;4 AlnQl 6yofam fnr All arinjan Refers to the ienglh of the bracing tube Lateral Syitem InClud e f - 20" Galvanized Steel Pad f - 60" Adjustable lateral Tube with Hardware 0120370 Lateral System Notataeftd ataff fbaWons ReplaogMent Pins for Pan System$ 0120366 16" Pin Specifccations Subject io Change without Notice out ' KicidnQ wen LONGITUDINAL AND LATERAL BRACING SYSTEM D `-INSIDE HE£/L11O`�E FRAME $i"x2-Y1` OUTSIDE HOME BEAM CARRIAGE BOLT 4-Ya"xYi SELP DRILIING MMLBC BEAM CUP SCREWS - 2—EA. SME 1 Y." TUBE INSTALL AFTER HONE /&R 4 YX1 i�!S SET AND ALL 07i ER� 6W FOR 99.5' MAX SPAN RIAGE BOLTS eOLTS ARE TIGHs LATERAL TUBE CUP-\ 60" FOR 999Z MAX. SPAN O iTYP•)LONGITUDINAL �MAX45c BRACE TUBE CNWGE BOLTAVY DUTY WASHER 18" TO 24" PIF=R W/ 1/2"91-1/2" CARRIAGE BOLT i 2— 39 FOR 2— "li FOR 25" TO 32" PIER 1 ATERAI BRACED AIL 2— 531 FOR 33" TO 40" PIER 2— 6 P FOR 41" TO 48" PIER NOTES: 12" DRK PINS MAY BE USED IN CLASS 2 & 3 SOILS. ; 16" PINS MUST BE USED IN CLASS 4 SOILS. Y2 2 2" CARRIAGE BOLT 48" MAXIMUM PIER HEIGHT- SD3 PIER PAD MAXIMUM SlDEWALL HEIGHT 96" 1 LONGITUDINAL BRACE DETAIL MAXIMUM BEAM SPACING 99.5" I WHEN USING LONGITUDINAL BRACES,,2ND PIER IN FROM THE END OF THE HOME 1 MAY BE USED TO MAKE ROOM FOR BRACE TUBES. ; I: SPECIAL INSTRUCTIONS LATERAL BRACE DETAIL M ALABAMA - MAX PIER HEIGHT 32" HOVE 8 *H f LABEL HOMES ONLY t. g351OE CU LONGITUDINAL & LATERALFIRACING SYSTEM LATERAL A USTABLE BRACE TM 6 gt FLEEIWOOD - MAX PIER HEIGHT 32" *BOTH LONGITUDINAL AND LATERAL DETAIL ASSEMFIL D %'SING DE NOM OLyT51 BRACES MUST BE USED ON ALL SYSTEMS 1 "MULTTWIDE HOMES ONLY j *4.3:12 MAXIMUM ROOF PITCH 1 1/27 BOLTS ARE GRADE 5 am *90" MAX SIDEWALL HEIGHTS CUP SI DELUX STEEL LONGITUDINAL PIER UP UP MINUTEIMAN 10/10f/01 Pcv A ANCHORS B/02 BRACE TUBE STEEL PIER PAD 0 W/ ANGLE •� DRIVE PIN CAR.. anchors,%. S I 6" DA. STA7f W CAP 36 ISEE DETAIL DV.G. 32' ` & M SIA%M CAP 7112 lCd'ATIO,YOF 7AOJ.t10.7A1i'A•92 •�- •- FOR HEAD MIX i;a X M ROD 1 114• fir' SEE IIt'G. A:1A off \ / FOR HEAD DETAS. SEE DWG. Nil" I ❑ ' MAIM N9MM I ❑ RI DISK: 9GA.SEVHSO EDGE HELP. D.'SC: 9 GA. Maw 3.9814.02M L IIN- *GA. COY?AC3.9814.020A. ECC_HMI5.08!6.02DA `9GA. COY?ACVZMR3.98:a MI. , 1L OW: 9cA.9ElELEo rDGF HE+nc eaN T. ALLs1E "I'DwANB0a dA55Y. 6TOA51FaAae MTo20 MODEL: 4430 - EZDH 3. LLS. PAI NM 4,923.165 3.98.0.020'A. DEL: 4636 - EZDH 2. 374• 92 4. 1fidDMLLCONf(WAl0 AVIS A5.18 CLASS ER70S3 t ALL SIEB.USED a4ANCWWQW- 3. L.S.PATNO.4,923.165' 5Af pCdA91 8. PAW TOBEALOWGIOSS.WRERRE COAL O- ' CO�pA16STDAS0AA36AAI= ,. y+pD{y,ETALCONFOW10AWSA5.18 CLASS ER 70!1 •— ll 5, M4TTOBEALOWGl0S5,\YAERRES0=CO0REG. ii. , 1vm:S�ytocrost # Q7/a®/ A M:22 i*a63 P.004/006 i lii! WE#Iuk L Us SKIRTING Ventilation: Center Vent 8.4 sq. in./ft. f panel —". u Solid l?ane .040 :: Available Coin S Cent4rVen Panel .040"' '` �j�' ; White I 1:� Top Front im .059" i I Y• .. y ! Care i Tan Top Oack T im -.059" ; �� Clay BottorV- Trim .047 Sand 1 i l V ntilatior,: % Cente� Vent 4.9 sq. inift. of panel ILI �iinyl Skirting Avai able Color , ,;VAoiid Panel 35" i White ', • 1�ented Panel . 35 s Grey ` • y T p Front Terra 50" I � Tangy •i;y� Clay op Back Trim ; . 48" • l Sand 1E i . ottom Trim 40u I Trim I i$ Co parision: Premium Plus Eagle Front R&il .058" ► 1080" MOTE: Top Back trlrn fiar Back F aii L .Osr I 048" Premium P us and Eagle Bottom Chann e7 .047" i .0404 Trim Kits ara the Same I Top PrQn€ Trim 'iV�lidth 4.725" ! .361 dimensions Upper deg .590 I . I The re, ksdn man 1 installers use Premium Plt, s Trim Kits with Eagle Panei is because it it HEAVIER; and, in areas where blow-out is a problem, Premium i t Plus offers more rigid protection against blow -veal, • I i -80:0-9,45-444-0 . i G3b�C t114 �UAl� 39Gd 10d3a 3woH imsow i 08L9L9b>;98 9O U0 OTOZ/6Z/LO I i'.r MEP A: ►1TACH BACK RAIL 1. Determine a place for mounting. Place bottom edge of back tail just below bottAow edge of the home. This location must offer solid support for attaching and wined load pressure for panels and rails. 2. Keep the back rail straight and level. Snap a chalk be around the home to guide the top edge of the back rail. 3. Convect screwing or nailing method for back rail: Start on the back side of the home, Position screws of nails in the center of the slot. Screw/nail to allow for a clearance of 1116" froth the bark rail surface. Now avoid tightly screwing or nailing back rail. A 1/16" clearance allows fot normal expansion and contraction with temperature change. Place a screw or nail in every other slot. 4. Provide a 1/2" gap between each back rail section for normal thermal expansion. To install around corner, refer to Step E. ` A. • EL RIEL DE APOVO, 1. Determine un lugar pars el montaje. Coloque el borde inferior del Ael de apoyo justo abajo del borde inferior de la ease. Esta ubicaci6n debe ofrecer un apoyo fame que pertnita clavar Jos rides y soportar Is presiba por cargas de viento en los paneles. 2. Manten. p derecho el rmel do soporte y a nivel. Marque una linen con et cordel catizado drededor de la casa pars guiar el borde superior del riei de apoyo. 3. Mctrdo correcto para clavar el rid de apoyo: Cornience en It parte posterior de la casa. Coloque los clavos en el centeo de Is ranum pars clavos. Iutrodum los clavos y deje una holgura de V16" desde is superficie del reel de apoyo. Nota: No clave muy ajustadamente el riel de apoyo. Tina holguea de 1116" con. la cabeza del clavo pumitid el espacio sudciente pica absorber la oyansidn y contracci6n normales rembntes de los cambios do temperatura. Coloquc 16s clavos err xanuras alternas. 4. Dqc un espacio de la' entre cada secci6n de riel de apoyo pars terser en cuenta la expansion termica normal. Para instalar el producto ah&dor de las esquinas, consulte cl paso 1r- STEP B: MOUNT B1'OM RAIL 1. Ground prepwdon. l?zepare the ground so that it is smooth, free of loose clumps, clods or protruding obstacles. Guard against uneven settling of newly excavated ground by mounting the bottom rail on treated (2'V) lumber. 2. Mark the ground location directly below the outside, bottom edge of the home. Use i level or plumb bob to determine this location at each corner. 3. Snap a chalk line or stretch a nylon string between esch corner to guide the bottom rail. 4. Position the bottom rail with the back leg toward the inside of the chalk line perimeter. 5. Drive ground spikes every 19 inches. Two sets ofholes are provided in the bottom mg. 71ey ere located inside the channel, and on the back leg. Ground spUs maybe driven in either hole at intervals of 19 inches. 6. Installation on concrete. Use a 3/4' masonry naq. You may also drM a hole for a 3/1.6" molly screw and plastic sleeve. (Nail and screw materials are available at most hardware stores.) To install around comer, refer to Step E. PASO 8: MONTAJE DEL RIEL INFERIOR 1. Preparaci6a del piso de tiara. Prepare el piso de mancra que est€ uOorme, sin cocas sueitas, tcrrones ni obstaculos que sobresalgan del piso Pwteja la instalaci6n contra el asentamiento no uniforme etapisos reeien cxcavados, montando el reel inferior en unapiera de madera tratada (2" x 2"). 2. Marque la ubieaei6n en el piso directameate abajo del borde inferior externo de, la casa. Use un nivel o una plowada para deteranar esta ubicaei6n era calla esquina. 3, Marque una 11nea con of cordel entirzado o coloque una caerda de oit6n entre cads esquina pars Oar el Ad de apoyo. 4. Coloque el rielde apoyo con la pots de mspaldo hacia el, interior del pe imew marcado pot la knee de tiza. 5. Introduzca los clavos gmesos en el piso it coda 19 pulgadas. En el -.r t3a011RIrMMV1.7 ) Qr— T Cm 1 Q—CCQ—MMQ—r anar.r.r/nrirnxriw-ransr.r 7o-cm r..r _im_rm inferior se proporcaonan dos conjuntos de agujeros. l✓stoa Be neuenuaa dentro doh canal, en la pats, de soporte. Los claws eras para el piso se pueden davatr a traves de codquicra de los 6.tems a una distancia de 19 pulgadas entre si. italacift en Oos de conceeto. Use un clavo de 3/4' para LV ,Asi mismo se puedc taladrar an agujero pats un o de 3/16" tipo Molly con or da plestica. (Los matcriales de os y has tornillos estin disponibles en la mayoda de las eterias}. Pa ' lnstalar el pxodueta alxededot de has esquirtas, eonsulte el peso E. RP Ce EL INSTALLATION I.1,�fc&ning 24" away from the lowest. corner of the home, measure m the round up to 1-1/2" above the bottom edge of the back ! tail-�(If the temperature is below 407, with frozen ground, measure 2! �3 above the back rail edge.) Ieasurerrtenw on sloping ground should be taken every 16" (width panel). > 3.� r ut the bottom of each panel to angle with. the ground. Each cut anei section should align 9T to the bottom edge of the home. Use viation snips or a power saw (with a fine toothed saw blade turned acicwards) for cutting 4.11 nch lock tabs every 4" along the top and bottom edge of cut panel sections (or outside portion; o£ each panel face for 13" arMest). A, Mdco (SL-8) Snap Lock Punch tool is mmended. Consult your skirting supplier for obtaining thustwa 0aol. Tabs are to be positioned outo catch on the hooked ge of the rails. 5. atedock panels and insert into the bottom rail. Begin with, the t panel inserted into the bottom rail, Lock tabs should snap past the hooked edge of the bottom rail. Insert next panel section into the interlock hoots along the vertical edge of the panels. Seat each net steurely into the bottom rail. Repeat interlocking panels, rmiugg about a 12-foot section. Resume panel rut and interlock ethod. T' install around corner, refer to Step E. PASO Q iNSTALAWN DE LOS PANELES 1. Comwmdo a 2,V do la esquina inkrior rab baja de la can, mida desde la superficie del piso haste 11//2" arriba del horde inferior del reel de apayo. (Si is temperatura ambiente dvrante la insraiad6n es inferior a los 40T y el piso estd congelado, raids, hasty 3" arriba del borde del rich de apoyo). 2. Las mediciones en pisos corn desnivel deben hacerse a cads. le' (ancho del panel). 3. Corte h pate inferior de calla panel en angdo 91n el dcsnivel del piso. Cada secd6n de panel cortado debe altar a escuWm (90 con el borde inferior de la casa. Use tijeras de hojalatem o una sierra eUctrica (con una hoja de cortc do diente fiino colocada al revel) Para cortex 10s panda. 4. More has lengtietss de cium cads 4" a to largo del horde superior e inferior de las secciones de panda cortadas. SerecoWenda el use de una punzonadom de tnano Malco (SL-8) Snap Lock bunch. Comulte con au pwveedor de cencfas soboe c6mo obtener esta herramients. Las leng,etas deben colocarse ha& sfuem a fin de poder engonchat el horde de gaucho de Ins rieles. Eng the i4s panics c introddacalos on. el rid inferior. Comience con el priaaer panel inuoducido en el riel �� E! inferior. Las leng,etas de dem debcn engancharms haste CORNER iNSTA►LLA'I'ION mh Al del horde con ganclio del riel dd apoyo. Introduzca is siguiente saccion de panel on los ganchm de 1. Top back rail - Make a V vercusil alit from the tap. Top. enclavarniento a. to largo del borde vertical de los pa rles. 1,Mlock hook ebould be complettly cut tbrougk►- Nowh Asiente cads panel finnemente an el del iofariot l V14 el 45` on bottom curved 199- cndavamiento de log panics hest, forma una secdon i e 2. Bottom mil - Notch the back portion with snips, as apmAmdarmente 12 pies. Reaaude cl cone do los panelas y illustrated. Bend around a comer and attach to the ground. el mdtodo de enc4vamii8At*- 3. parcels - Cut panel to proper height. Dete►saainn point of Im it mlar el pwducto en Jae esquim, consulte el paso E. corner bend; bend over a table edge, forming a uxriform single. 4. Top front rail - yotch at both the top and bottom books of U the from rail, as illustrated. Bend around the corner anti fit Wto the int ulock with the top back rail. Refer to Step D. E Di ERMK. rRONT RAIL ' TI BACK RAIL Start snapping one end of the front top rail into the back top rail, creating the interlock. Push the front top rail upward, its entire length until the front top rail is completer inaerlocked with the back rail. Overlap V each top rail section. instd around coxer, refer to Step E. a Qi l.AYAMIRM DEL RIEL AL CON EL RIEL DE APOYO L � Comience enganchando un exh mo del riel frontal superior on el rid superior de apoyo, pare foxmar el raecasiismo de mcWwniento. Empuj d riel superior de apoyo Imcia arriba an toda su lonowd Basta quo el del fmntal superior Cate coxr}pletarneats enganchado en el Ael de apoyo. r ThAspe 1" coda seccik del del supodon Zara: instalar el producto an lss esgdwas, consulte el paso E. .. • AAA JAf nes I. 1 AT T POUR PR&MMHED TOP FRONT RAILS ARE INCLUD90 IN TRIM PAL �A�rO . IN'1'ALA � DEL PRODUCIO IN LAS E UINAS 1. Xd supmior de apoyo - $#age un corte verticd de V dead-F.- la pane superior. EI gaMcho supcsior de enclavamiento ache corurse comgotamente. Hagj una nmesm a 4.7 en la pats curvada inferior. 2. U inferior - Corte la porcibn posterior con tgeras de hojalatem se& se muestm en la Austroet6n. Ddblelo atrededor de una esquicay clavelo A piso. 3. Poeles - Corte el panel a lA allure spwpiada. Determine el punto de dobl= dobleel panel sobrc el borde de una mess, : Pam format un hw& recto. #. Riot fmawl superior - Corte los ganchos superior a inferior del Aid frontal, W& se oustra ea la fimma; Doble It pifr'a akededor de la e*na y engdtAda en el endwamiento con el riel superior de apoyo. Consulte el paso D. IN EL CONJUN"I'O TRIM PAK SF INCLUVIN CUAYRO RIFLES SUPERIORES FRONTALES VA COWAUM mmTi31nriritoT,kW—r.tn0j 00'r-A CT 1fA—TIC'