HomeMy WebLinkAboutFIELD DENSITY TEST-_ ederal 311, 1 gineenn a esting, 1 • __ Phone:954-784-2941 E-Fax: 954-7844875 Field Density Tests of Compacted Soils Method D-6938. Project: Proposed Hanger Bay Date: March 1, 2019 Address' 12366 Lear Place, Port St. Lucie, FL 34987 Order #:. 19CMT586 Area Te led: Airport Hanger Pad & Footings Permit #:. - Material ype: Brown Clayey Sand with Rock �'`,� . Tech: SL YVJ Client: Critical Path Construction, LLC %to Address 2546 Westchester Drive o mpaction Req.: 95% Riviera Beach; FL 33407 Proctor Method: ASTM D-1557 Test # , I TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture /osture Compaction Pass 1 At W Corner of Pad 12" FL- 6.9 120.7- 123.0 10.0 98.1% Yes, 2 At S 1W Corner of Pad 12" FL 7.4 122.2. 123.0 ,10.0 99.3% Yes 3 At .E Corner of Pad 12" FL 7.0 120.9 123.0 10.0 98.3% Yes 4 At ,E Corner of Pad 12" FL 8.1 121.6 123.0 10.0 98.9% Yes 5 At E outh Side of Footin• s 12" BOF 7.6 122.7 123.0 10.0 99.8% Yes 6 At IS orth Side of Footings 12" BOF 6.9 121.4 123.0 -10.0 98.7% Yes 7 At V6st Side of Footings 12" BOF 7.0 122.9 123.0 10.0 99.9% - Yes 8 At �st Side of Footings 12" BOF 6.6 123.4 123.0 10.0' 100.3% Yes 9 10 11 12 13 14 Remarks:[I See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad/footing and is not a verificatioji of Uil, Bria0rig Capacity. Legend for levation: � PR = Proof II 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: , SL = Spring ne FL = Final Lift Keith LeBlanc, P.E. r-lr SG = Subgr11de BG = Below Grade Federal Engineering-8 Testing, lnc _ BC = Base urse BOF = Bottom of Footing Florida Reg. No. 59394 -_ TOP = Top 11 f Pipe FG = Finished Grade Certificate of Authorization W5471 As a mutual p, tection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for public4tion ofPstatements, conclusionsore acts from or regarding our reports is reserved pending our written approval. A density test determines the degree of'pompaofion of the Wstad,laye .of material only. A density, oes not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials, below the proposed'structure The results do not preclude r guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will, suppDit tF� pr000sed structure without settlem nt. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitnbiiity of the underlying soil to support t i,a proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work! PAGE 1 of 2 ' I Compacted: Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine .the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope.of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis" of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction -test does not warranty any underlying soil- materials or conditions below the tested top'12 inches of material..If no soil borings have been performed in.the location of the proposed structure, we recommend performing soil borings -below all foundation areas of the proposed structure to verify the underlying soil conditions. 'Environmental analysis of the soil materials is not ,part. of the scope of services. If environmental analysis of the soils is required, we can provide a "proposal for performing an environmental analysis of the soil materials. The scope of services is for determination ,of the degree of compaction of the tested layer of -material only. No other analysis is implied or warranted. Job project specifications were not available at the,time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots, If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on[ other areas or dates. Any subsequent site disturbances due to water erosion, rain waters,' construction activities, utility or footing excavations;, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re- tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client and authorization for use,, publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. , It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2