Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
HYDRAULIC DOOR
rags �'l r H HYDRAULIC c o00 R© START 1 [) Be sure the slide column is verti- cal (loosen the anchor bolts if nec- essary), and then loosely secure the top of the column in place with four 1/2" 13 x 4" or 5" lag bolts; two on each side of the column. NOTE: On steel buildings, refer to the following drawing and weld the metal clips to the building. 3"x3"x3/8"ang1e FRAME RECEIVEM For Metal Buildings DEC 14 2018 .FIELD. Permitting Department WELD St. Lucie County, FL FIELD WELD 3"x3"x3/8" angle rf i �J 44 Left Cam and Cam Brace for METAL Buildings NOTE: In the following steps, you will install the left cam and a cam brace in a metal building. The cam MUST be installed so it is at right angle to the building header. If a truss is not nearby to secure the brace to, then tack -weld the brace to the cam and then to the building header as shown below. (During Initial Tests, you may have to readjust the cams slightly.) 311 Move the left cam and cam brace until the cam is at right angle to the building header. You can use a tape measure and figure a 3, 4, 5 right triangle, or use a square. Then weld the cam brace to the top of the cam and the building struc- ture with supplied loose clips. Loose -o' Clip �llc� Cam shown installed on preferred side. Slide Column'-Z DOOR SIDE OF CAM RECEIVED DEC 14 2018 Permitting Department t ' Lucie County, FL NOTE: Top of door raises 13" abo�,� of cam. So raise brace 13" if you install it on this side of cam. Loose Clip M