Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTl [1 We, Da planning tea ®ease➢opment Services Building & Code Reg u➢af0on Division 23o0 vloVinla have Forst pierce, FL 34982 772-462-2-10 2 pax 7 72-462-6443 CERTEFICATE OF TERMTE TREATMENT COrls TMCTi()NOjL Tf_AT iF:N JOB ADDRESS' ►t:K/I,VIV I r m%- CONTROL CONTRACTOR. EDICT -A -BUG TERMITE &PEST CONTROL INC. CONTROL LICENSE # o JB175775 ned hereby certify that we have pretreated the above describedrconstruAssoc at onion or undersigned, -anean termites in accordance with the standards of the National Pest feet if area treated: ntage of solution: •05°1° of Treatment: : -��— Chemicals used: DOMINION 2L Total gallons used: 2 Time of Treatment: `T r ;51MT. Footing 1st Treatment _ist Treatment Re -Treat _Re -Treat --Fools _Driveway let Treatment ist Treatment Re -Treat ,___ Re -Treat P erimeter for ' al Inspection Other ist Treatment 2 �-`D�ate Re-Treat f xterminator must be on the job There must be a completed foa tf�� of each inspection or the scach "eqheduled InspecuIred treatment or re_treatment � n,w111 fall and a re -In spection o be picked up by the inspector charged. her ;�,®4,2.6 Certificate of Protective TreatmentCelficates as each on of required prooites, A tctive treatmentisltcompleted' e posting board ll be provided to receive duplicate rr i Treatment Permit flles. The Treatment vlding a copy for the person the permit Issued to and another copy for the bullding tlficate shall provide the product wind numbety of the �ofgallons usedntodestabllsh a verifiable ate of t eatm record d o ft/on, area aced, chemical used, percent con ,tective treatment. If the soil chemical barrier method for termite prevention Is used, final exterior treatment shall completed prior to final bullding. approval, -on for Cop a permanent Sticker to L ucia COuntV Ireaquire for theffau�aU io�e6�➢�e treatments and dates of applications. placed onecto e0ectrica0 panel tor- cover, ➢usti g 300 � 7/24/2014