HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTl
[1
We,
Da
planning tea ®ease➢opment Services
Building & Code Reg u➢af0on Division
23o0 vloVinla have
Forst pierce, FL 34982
772-462-2-10 2 pax 7 72-462-6443
CERTEFICATE OF TERMTE TREATMENT
COrls TMCTi()NOjL Tf_AT iF:N
JOB ADDRESS'
►t:K/I,VIV I r m%-
CONTROL CONTRACTOR. EDICT -A -BUG TERMITE &PEST CONTROL INC.
CONTROL LICENSE # o JB175775
ned hereby certify that we have pretreated the above describedrconstruAssoc at onion or
undersigned,
-anean termites in accordance with the standards of the National Pest
feet if area treated:
ntage of solution: •05°1°
of Treatment:
: -��—
Chemicals used: DOMINION 2L
Total gallons used: 2
Time of Treatment: `T r
;51MT.
Footing 1st Treatment
_ist Treatment Re -Treat
_Re -Treat --Fools
_Driveway let Treatment
ist Treatment Re -Treat
,___ Re -Treat P
erimeter for ' al Inspection
Other
ist Treatment 2 �-`D�ate
Re-Treat f xterminator
must be on the job
There must be a completed foa tf�� of each inspection or the scach "eqheduled InspecuIred treatment or re_treatment � n,w111 fall and a re -In spection
o be picked up by the inspector
charged.
her
;�,®4,2.6 Certificate of Protective TreatmentCelficates as each on of required prooites, A tctive treatmentisltcompleted'
e posting board
ll be provided to receive duplicate rr i Treatment Permit flles. The Treatment
vlding a copy for the person the permit Issued to and another copy for the bullding
tlficate shall provide the product
wind numbety of the �ofgallons usedntodestabllsh a verifiable ate of t eatm record d o ft/on, area
aced, chemical used, percent con
,tective treatment. If the soil chemical barrier method for termite prevention Is used, final exterior treatment shall
completed prior to final bullding. approval, -on for Cop a permanent Sticker to
L ucia COuntV Ireaquire for theffau�aU io�e6�➢�e treatments and dates of applications. placed onecto e0ectrica0 panel tor- cover, ➢usti g 300 �
7/24/2014