HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTDed.,('4.2018 03:37 PM PAGE. 1/ 1
Planning & Development Services 4CCSIVFo
Building & Code Regulation Division
COUNTY 2300 Virginia Ave DEC 0 4`"2018
Fort Pierce, FL 34982 Permittin
772-462.2172 Fax 772-462-6443 St, LUG spa/ k
a menr
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT ���1�
3LC 1809.0381 � 6201 S rin Lake Ter �����/� �U
PERMIT #. JOB ADDRESS. _oi sering - �y
BUILDER/CONTRACTOR: Dana Concrete
PEST CONTROL CONTRACTOR: Hannan Environmental Services,lnc.
PEST CONTROL LICENSE #: IB99418
the undersigned, hereby certify that we have pretreated the above described construction for
?rranean termites In accordance with the standards of the National Pest Control Association.
re feet if area treated: 84 agft
of solution:.125%
of Treatment; 1214/18
Chemicals Used: Termidor He
Total gallons used: 4.6 gallons_
Time of Treatment: 2:33 pm
12/4/18 Footing ,.,,.Slab
Vt Treatment 15t Treatment
Re -Treat Re -Treat
Driveway ,.,Pools
1st Treatment
Re -Treat
11t Treatment
Re -Treat
1st Treatment
-Re-Treat
Perimeter for Final Inspection
1214/16
Sign na,,, Date
e: There must bee completed lbrm for each requlred treatment or re -treatment and this form must be on the job
to be piciked up by the Inspector at time of each inspection or the scheduled /nspectlon will fall and a re -Inspection
charged.
C1104.2.6 Cerdfleale of Protective Treatment for prevention of termites A weather resistant jobs/te postIng board
rll be provided to receive duplicate Treatment Certlticates as each repulred protective treatment Is completed,
Wding a copy for the person the perm/t Is Issued to and another copy for the building permit flies The 7eatment
,tiftale shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area
ated, chemical used, percent concentration and number of gallons used, to establish a ver/fable record of
itective treatment, If the soll chemical barrier method for termite prevendan is used, final exterior treatment shall
completed prior to final bullding approval.
Lucie County requires for the final Inspection Ibr CO, a Permanent Sticker to be placed on
9 electrical panel box cover, listing all the treatments and dates of applications.
7/24/201.4