HomeMy WebLinkAboutDUCT SEALING CERTIFICATIONPlanning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201 RECEIVED
Fort Pierce, FL 34982
w 772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification ST. t_ude County, Permitting
Prescriptive and Performance Method - _
l� zd1 Permit#: Lot#: 2-7--
actor. 94A^ Address: '-Yzzy 04�_JAVU.P
❑ Post Construction Test ❑ Rough -in Test
TOSt Conditions: l
D ° te: 311 c% l ��% Floor Area (ft2): ` 1�
Time: 1/�,: 2U 1 Primary Location of Supply Ductwork
lr6orTemperature (F): 4L/ Primary Location of Return Ductwork !�-/J / �
O tdoor Temperature (F): %Z SCANNED
Total Leakage Test (Outside) Y
Duet Leakage: ❑ Default ❑ Prop. Leak Free ❑ Proposed On
Te t Pressure: - (Pa) u�
Baeline Duct Pressure (optional) (Pa)
Dint Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ❑ Pass ❑ Fail
Installed Pa , _
Total Leakage (cfm): �_
H
H Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft.
inyName: /61i�Y'7t99Bldf/� Address: I 7Wvie�� 1lcP t MlUc1� fL
ry certify that the above Duct i g Leakage results demonstrate compliance with P Edition FBC Energy Conservation requirements in accordance with
i R403.2.2.
are:
I Name: License/Certificate M