Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 10-18-18RR We, subs Squa Manning & Development Servicee Building & Code Ptegulattion Division 2300 Vlrc Bnla Ave Fort Pierce, Fa 34982 7712-462-2172 Fax 772-462-W3 COS S T I:UCTIC�) SnIL f 41 1`1E:1bJT #: J-- �1 r�—�4 , P��c2„� � if1�n rrr� n r-rn0 . � Al` r— P`% A i .J-0 CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. CONTROL LICENSE # o JB175775 undersigned, hereby certify that we have pretreated the above described construction for mean termites in accordance with the standards of the National Pest Control Association. S feet if area treated: I' Chemicals used: DOMINION 2L Percentage of solution: •05% /13) hp Date I�of Treatment: o ooting I5t Treatment Re -Treat Ist Treatment Re -Treat 14, - I5t Treatment Re -Treat Total gallons used: 4-) '5 TV! of Treatment: Sla Ist Treatment Re -Treat Pools 1st Treatment Re -Treat Pert ter for Final InspepW -1 3 - I e S6n6ure of Extermi for Date Note. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the Inspector at time of each inspectlon or the scheduled Inspectlon will fall and a re Inspectlon fee charged. FO CiG4.2.6 Cerdflcate of Protective 7eatment for prevention of termites A weather resistant jobsite posting board shall I �e provided to receive duplicate Treatment Certificates as each required protective treatment Is completed, providing a copy for the person the permit Is issued to and another copy for the buliding permit files The Treatment Certl,�cate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. Sit Ocie County requires for the ffinal 1nsP8ctiorl for CO, a Permanent Sticker to be placed on the 6iecttrlcei panel bona cover, lasting all the treatments and dates Of applications. 7/24/2014