HomeMy WebLinkAboutINSTALLATION GUIDE SINGLE - DOUBLE WIDE SHEDSETUP AND INSTALLATION OF SINGLE WIDE SHED
SETUP AND INSTALLATION OF DOUBLE WIDE SHED
MOVEMENT TO PLUM OR SQUARE UNIT TO HOUSE, FENCE, PROPERTY LINE, ETC.
2. ONCE UNIT IS SQUARE AND THE HIGH SPOT OF THE GROUND IS ESTABLISHED, THE
BUILDING IS BLOCKED ON THE HIGH SPOT AND LEVELED. THE OTHER END OF THE
BUILDING IS BROUGHT UP TO LEVEL AND BLOCKED. THEN THE CENTER OF THE BUILDING
IS SUPPORTED -TO -LEVEL -,-BLOCKED, -AND-THEN--SHIMMED. - -
3. AFTER THE BUILDING IS LEVEL, MORE BLOCKS ARE ADDED TO ACHIEVE THE CORRECT
SPACING (SEE TABLE 3).
4. ANCHOR PLACEMENT IS ESTABLISHED BY THE WIDTH OF THE BUILDING. HOLES ARE DRILLED
THRU THE 2"x4" BOTTOM PLATE WITH A 1/2" AUGER BIT. 1/2" EYEBOLT OR OPTIONAL
1/2" THREADED ROD (FOR A "HIGH SET") IS SECURED THRU THE HOLE.
5. ANCHORS ARE NOT REQUIRED IN THE BOTTOM PLATE FOR DOORS ANn DOORWAYS WITH NO
6. IF THE UNIT HAS A FLOOR, EITHER A HOLE IS DUG FOR THE 30" AUGER ANCHOR AND
BACKFILLED AND SECURED AS PER THE DETAIL OR A 1/2" HOLE IS DRILLED INTO THE
CONCRETE 1-1/2" OFF OF RIM JOIST. THE EYEBOLT IS FASTENED THRU THE BOTTOM
PLATE AND A SIMPSON A-24 (OR EQUAL) IS SECURED TO THE CONCRETE WITH A 1/2"
WEDGE ANCHOR-
7. IF THE UNIT IS A 'NO FLOOR' OPTION, ANCHOR WITH 1/2"x5" WEDGE ANCHOR THRU THE
2"x4" BOTTOM PLATE.
TABLE 1
ANCHORING TO CONCRETE
SHED WIDTH
UPLIFT (PLF)
ANCHOR SPACING
20'-0"
400
S-6"
13'-8"
280
S-6"
11'-8"
240
3,_6„
10'-0"
200
S-g'
6'-0"
120
3,_6„
TABLE 2
SKID RUNNER SPACING*
SHED WIDTH
X1
X2
X3
13'-8"
1'-10}"
1'-10j"
11'-8"
2'-8"
6'-4"
-
1O'-0"
V-7"
6'-10"
-
8'-0"
0'-9"
6'-6"
-
6'-0"
0'-10"
51"
-
*VALUES ARE FROM END OF JOIST TO CENTERS OF (2) 4"x4"
SKIDS ONLY. 13'-8" WIDE SHEDS HAVE (4) SETS OF SKIDS.
1. BUILDING IS PLACED IN REQUESTED LOCATION. THE FIRST SECTION OF THE DOUBLE WIDE IS
PLACED -ON THE HIGHEST LOCATION OF GROUND AND IS LEVELED UP.
2. BLOCKS ARE THEN PLACED AT THE END, CENTER, AND OTHER END TO LEVEL. ONCE THE
BUILDING IS LEVEL, BLOCKS ARE ADDED TO ACHIEVE THE CORRECT SPACING (SEE TABLE 3).
3• THE NEXT _SECTION OF THE SHED _ IS BACKED INTO PLACE_ AND UNLOADED PARALLEL_ WITH _THE
s FIRST SECTION. THE TWO SECTIONS ARE CONNECTED AT THE LOWER CORNER WITH (1)AN44"
` BOLT AND NUT. THE SECOND SECTION IS THEN LEVELED AND THE OTHER BOLT HOLES ARE
,y LINED UP AND BOLTED SECURE. THE REST OF THE BLOCKING IS THEN COMPLETED. THIS
�R- PROCEDURE IS REPEATED FOR MULTIPLE SECTION SHEDS UNTIL ALL SECTIONS ARE IN PLACE.
.' 4. GROUND ANCHORS ARE THEN ADDED (SEE TABLE 48)-
l1RER'S' 5. ONCE THE BUILDING IS PROPERLY BLOCKED AND BOLTED TOGETHER, THE SUPPORT BRACING IS
;BADE. 6. ANCHORS ARE NOT REQUIRED IN THE BOTTOM PLATE FOR DOORS AND DOORWAYS WITH NO
FOOTER (GARAGE DOORS FOR EXAMPLE). HEADER DESIGN TRANSFERS THESE LOADS.
TABLE3A
PAD TYPES
TYPE
PAD DIMENSIONS
MAX. LOAD*
MATERIAL
I
2"x8"x16"
1778LBS
CONCRETE BLOCK QUALITY
CEMENT AND SAND MIX
II
4"x8"x16"
3500LBS
CONCRETE BLOCK QUALITY
CEMENT AND SAND MIX
III
16"x16"
3950LBS
ABS PLASTIC PADS
IV
8"x8"x16"
1900LBS
CONCRETE BLOCK QUALITY
CEMENT AND SAND MIX
* BASED ON 2000PSF SOIL BEARING CAPACITY (2000PSF IS TYPICAL)
NOTES
1. HOLLOW OR SOLID CONCRETE BLOCKS (8"x8"x16") MAY BE STACKED
ON PADS FOR HIGH SETS UP TO 48" WITHOUT REINFORCING.
2. ABS PADS REQUIRED ON 1V-8" AND IS-8" WIDE SHEDS ONLY.
TABLE 3
SUPPORT FOOTING PAD SPACING FOR RUNNER BLOCKING FOR SINGLE & DOUBLE WIDE SHEDS
SHED DESCRIPTION
PAD
MAXIMUM LOAD AND PAD TYPE
SHED WIDTH
TYPE
LW*(PLF)
END PAD
MAX. SPACING
END PAD
SIDE RUNNER
PAD TYPE
INTERIOR
PAD
SIDE RUNNER
PAD TYPE
13'-8"
SW/DW
4.15/332
0" TO C
6'-0'
1936LB
I, II, III, OR IV
1879LB
I, II, III, OR IV
11'-8"
SW/DW
6.00/480
T TO 6"
V-0"
2558LB
I, II, III, OR IV
2558LB
I, II, III, OR IV
10'-0"
SW/DW
5.00/400
O" TO 6"
6'-0'
2400LB
I,. II, III, OR IV
2400LB
I, II, III, OR IV
8'-0"
SW
4.00/320
0" TO 6"
V-0"
2029LB
I, II,' III, OR IV
2133LB
I, II, III, OR IV
6'-0"
SW
3.00/240
0" TO 6"
6'-0'
1658LB
I, II, III, OR IV
1866LB
I, II, III, OR IV
LUAU Y/IUIH OF UPLIFT ON RUNNER
NOTES
1. PAD SPACING IS END TO CENTER OF PAD.
2. PADS OTHER THAN END PADS SPACING IS CENTER TO CENTER.
3. USE SAME MAXIMUM SPACING FOR INTERIOR SPACING.
S T• zUCIE COUNTY
BUILDING DIVIS10
REVIEWED
FOR COMPLI 1
REVIEWED G`t
DATE t
PL�kNS AND PERM
MUST BE KEPT ON JO OR �
No INS.pECTION WILL E3 MA
THESE PLANS M'D ALL PROPOSED W%,0: • -,
AQ; C11s.1EGT Ili Am COFRECTIOr1S"T
»1_,n111LUGii RY
GENERAL NOTES & SPECIFICATIONS FOR AUGER ANCHORS
1. BUILDING ANCHORS SHALL BE "MOBILE HOME" TYPE HP-1 SINGLE HELIX EYE
AUGER ANCHOR BY HOME PRIDE OF BRISTOL, VA. OR EQUAL. AVERAGE
HOLDING STRENGTH IS NOT LESS THAN 4,900 LBS.
2. ANCHORING SYSTEM TO GROUND PER LOCAL BUILDING CODE (BY DEALER).
LOCATE ANCHORS PER TABLE 4A OR 4B.
3. THREADED ROD WITH EYEBOLTS SHALL BE PLACED THRU THE BOTTOM PLATE
(FLOOR SYSTEM) AND ATTACHED TO ANCHOR. THESE CAN BE EXTENDED WITH
THREADED ROD (OR STRAPS WITH EQUAL OR GREATER STRENGTH) FOR ELEVATED
PORTIONS OF SHEDS ON LEVELING BLOCKS.
TABLE 4A
30" AUGER ANCHOR SPACING - SINGLE WIDE
SHED WIDTH
LW*
UPLIFT (PLF)
END ANCHOR**
MAX. INTERIOR SPACING***
13'-8"
7.00
243
0'-0" TO 3'-0"
10'-0"
11'-8"
6.00
208
0'-0" TO S-O"
1O'-O"
_ �..
�5.00-
�-174�::=_
8'-0"
4.00
138
0'-0" TO 3'-0"
10'-0"
6'-0"
3.00
104
0'-0" TO S-Cr
10'-0"
TABLE B
30" AUGER ANCHOR SPACING - DOUBLE WIDE
SHED WIDTH
LW*
UPLIFT (PLF)
END ANCHOR**
MAX. INTERIOR SPACING***
20'-0"
10.00
400
V-0" TO S-O"
5'-0"
* LOAD WIDTH OF UPLIFT ON RUNNER
•• LOCATION FROM END WALL OF AUGER ANCHOR
••• MAXIMUM SPACING BETWEEN ANCHORS
NOTES -
1. ANCHOR SPACING IS DESIGNED AS PER ASCE-7.
2. ALL MEASUREMENTS ARE CENTER -TO -CENTER.
3. THE MINIMUM NUMBER OF ANCHORS PER SHED IS (4). (1) ANCHOR PER EACH CORNER.
ADDITIONAL INTERIOR ANCHORS ARE REQUIRED IF SPACING IS MORE THAN 10'-0"
BETWEEN ANCHORS..
4. ANCHORS SHALL BE ON SIDE WALLS EXCEPT WHEN THE SHED IS PLACED NEXT TO AN
EXISTING BUILDING; IN WHICH ANCHORS CAN BE PLACED ON THE END WALLS AS CLOSE
TO THE SIDE AS POSSIBLE.
�,'��E� �, Y
. YDEWcCESSbRYillti
OCT
,Tl;G
CM1'yPj iJi'(�nw
0�1FL'�'�ti'iiri : + !AP PLIC CODES.
ST. Lucie County, Permitting
2"x2" GALVANIZED WASHER
2"x2" GALVANIZED WASHER �;:f'
WITH 1/2" NUT'S
WITH 1/2" NUT
1/2" THREADED ROD
OPTIONAL FOR "HIGH SET"
NOTCH OR COUNTERSINK BOLT
1/2" THREADED ROD �'�"" ~''
OPTIONAL FOR "HIGH SET" ,%
`�' 7 v�
EYES BOLTED TOGETHER WITH 1/2"x2"
BOLT & NUT WITH 2 2"x2' GALVANIZED
()
WASHERS 2.000LB SHEAR CAPACITY
( )
PIZ
42!1/2" COUPLER
THRU 2"x4" BOTTOM PLATE
Z:2"x4" BOTTOM PLATE NAILED
1/2" COUPLER. r
/ ` f
1/2"x12" FORGED EYEBOLT YJJ`� `l
f Nl ' tea,-
may,
``
i 4" MIN.
1/2"x5" (400 LB.) CONCRETE
WEDGE ANCHOR INTO SLAB
THRU 2"x4" P.T. BOTTOM PLATE
TO 2"x6" P.T. BASE
s4" MIN.
J_
a -
-
-
(SEE TABLE 1 FOR SPACING)
1'
--------4------
EYES BOLTED TOGETHER WITH 1%2 x2"..' rT-YIREl,.IIL�OR TV PAD WITHBOLT & NUT WITH (2)2"x2" GALVANIZED y, WASHERS (2.000LB SHEAR CAPACffY ASAREQUIRED (SEE TABLE 3)-
1! ) /`
1/2"x3" (400 LB.)
CONCRETE WEDGE ANCHOR
SIMPSON A-24 CONCRETE SLAB BY OTHERS THROUGH
CLIP OR EQUAL LOCAL CODES AND JURISDICTION
CONCRETE SLAB BY OTHERS THROUGH
LOCAL CODES AND JURISDICTION
30" EARTH AUGER ANCHOR' .I
(SEE TABLE 1 FOR SPACING)
r
(SEE TABLE 4 FOR SiP' CING)
SHED WITMSKID,-�
SHED WITH SKID
SHED
WITH 'NO FLOOR' OPTION
TO PAD;"OR LOCKING
ANCHORED TO CONCRETE
ANCHORED TO CONCRETE
TIE
-DOWN DETAILS
CODE VERSION FBC 2017 6th Edltt-, ASCE-7
MANUFACTURER SUPERIOR SHEDS
CONSTRUCTION TYPE
v-B
FIRE PROTECTION
NONE
FIRE SUPPRESSION SYSTEM
NONE
OCCUPANCY
STORAGE
ALLOWABLE NUMBER OF STORIES
I
BASIC WIND SPEED
Vr-200.ph
EXPOSURE
D
ENCLOSURE
ENCLOSED
INTERNAL PRESSURE COEFFICIENT
+/- 0.18
IMPORTANCE FACTOR
1.15
ROOF DEAD LOAD
10PSF
ROOF LIVE LOAD
2OPSF OR 3001bs
FLOOR DEAD LOAD
BPSF
FLOOR LIVE LOAD
STD. 75PSF - 125PSF OPT.
"R" RATING OF WALLS, FLOOR, ROOF
N/A
MODULES PER BUILDING
1
HURRICANE PROTECTION USAGE
NO
HURRICANE SHELTER .USAGE
NO
SQUARE FOOTAGE
LESS THAN 720 SOFT.
REVISIONS
w 4/26/16
Scale:
(n N/A
odel
LJ_J ALL
GENERAL NOTES
1. FOUNDATION PLANS ARE NOT PART OF THIS
PLAN SET AND ARE GOVERNED BY LOCAL
JURISDICTION.
W 2. THIS BUILDING IS EXEMPT FROM THE FBC
.ENERGY CONSERVATION CODE PER SECTION J
1015.22.
m 3. REFER TO TIE -DOWN DETAILS FOR PROPER
INSTALLATION REQUIREMENTS TO MEET CODE.
W
4( D
z
(n
�I
LLB
nY
6/1/18
Sheet: AD-1 OF 1