HomeMy WebLinkAboutCOMO OIL - PROPANE BILLVero Beach Office
1701 Commerce Ave
Vero Beach, FL 32963
772-562-6666
www.comafiorida.com
Job Name: Davenport John
Job Address: 5295 Compass Cove Place
City, State, Zip: Fort Pierce FL 34949
Phone 1: 845-313-5657
Phone 2:
C rrent Providor. Tank %:
Iwo v
0-fq"l�
Palm City Office
358$ SW Martin Hwy
Palm City, FL 34990
772-287-1900
www.comoflorlda.com
Contractor:
Billing address: 114 Rose Lane
City, State, Zip: Matamoras PA 18336-2054 A) �{ �
Email:laurie34@optoniine.net
Billed by Email?
Account Type: Cust #:
Tank Size: 60 gal
Tank OptionlPricelPeriod: Prorated Tank
$7.50 Monthly Tank Set:
AG
Tank Size:
Tank OptionlPricelPeriod:
Tank Set:
Tank Size:
Tank OptionlPricelPeriod:
Tank Set:
Tank Monitor? Type of
Monitor: Monitor Price:
Monitoring Fee:
Delivery Cycle: Will Call .
Frequency (if Auto): Every
Days. First Fill: 48 gallons @
$2.49
Pump Out Fee:
Tank Set / Excavation Fee:
$250.00 Tank Disposal Fee:
Anchors: Number of Sets:
1 Price Per Set:
$30.00 Anchors Total;
$30,00
Anodes, Amount:
Price Per:
Anodes Total:
$0.00
Tank Location: Right side _
tanks are billed from January to January. Leased Monitors are billed from Jun to Jun
'Leased
(r(ionitoring
Fee).
Tank S Acessories Total: $287.50
-
Feet of underground line (+/-) actual footage will be charged @
perfoot.
Total $:
$0.00
6 Feet of 1/2" gaiv. pipe Interior line (+/-) actual footage will be charged @. $14.00 per foot.
Total $:
$84.00
2 Feet of tubing (+/-) actual footage will be charged @
$5.25 per foot.
Total $:
$10.50
Feet of sleeving (+/-) actual footage wili be charged @
perfoot.—
Total $:
$0.00
Feet of regulator venting (+/-) actual footage will be charged @
perfoot.
Total $:
$0.00
s Sta a
2nd Stage
Twin Stage A/G
PIntall
Riser
Amount:._--9_-....
mount:......
Amount:- --.....:.
Amount:._. 1 _-.
Amount:.....
Amount... .
.Amount:... ... .
$ per:
$ per:
$ per: $100.00
$ per: $20.50
$ per:
$ per-
$ per:
Total $: $0.00
Total $: $0.00
Total $: $100.00
Total $: $20.50
Total $: $0.00
Total $: $0.00
Total $: $0.00
ee
Shut Off Valve
Sediment Trap
SS Flex ❑fie
Transition
Misc. Parts & Fittings
Amount: 1
Amount:
Amount:
Amount: 1
Amount:
Amount:
$ per:
$ per: $24,95
$ per:
$ per: $24.95
$ per:
$ per:
Total $: $0.00
Total $; $24.95
Total $: $o.00
Total $: $24.95
Total $: $o.00
Total $: $0.00
Total $: $20.00
__ Materials Total : $284.90
Ink! Torches: Fire Pit: Water Heater; Generator:
Gas Lights: Log Lighter: Tankless WH; Other: --
Fireplace: Logs: Pool Heater:
Labor Total: $175.00 Gas Safety Check: $90.00
Deliver and set tank on existing slab, anchor to existing eyelets, run gas line thru wall along wall of crawl
space up thru floor to range location set for rough inspection, tie in system with regulator, pigtail, and copper
tubing, convert range, test for leaks, set for final inspection, turn on gas safety check.
(before taxes): $837.40
Tax:
Permit Fee:
1st Fill Price:
$54.44
$350,00
$1
Hazmat Fee: $13.99
SIGNATURES
Como Oil Company of Florida Representative
,Accepted By: Willie Anderegg
722-204-3538
williea@comoflorida.com
fF
Sign:
Date:
09-19-18
M Customer
Total: $1,375.35 Accepted By: John Davenport
50% Down Payment: $687.68 -
Sign:
Balance Due: $687.68
DateC\ \fI
4
material is guaranteed to be specified. All work to be completed in workmanlike manner according to standard practices. Any alterations or
iation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and
ve the estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other
essary insurance. Our workers are fully covered by Worker's Compensation. Como Oil Company of Florida not responsible for irrigation
sage. Proposal valid for 60 days.
onding of interior gas lines to be done by others. —All sod replacement to be done by others. '"Propane billed separately.