Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT - 10-31-18We, sub's Date Planning & Development Services Building & Code Regulation Divislon 230o Virginia Ave Fort Pierce, FL 34962 772-462-2172 Fax 772-462=6443 RTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT #: 65- P�„JOB AD CONTROL CONTRAG 14 CONTROL LICENSE #: 0'04�Aeo 'g t'U016 1 undersigned, hereby certify that we have pretreated the above described construction for naan termites in accordance with the standards of the National Pest Control Association. s feet if area treated: age of solution: Treatment: I a 3 15� Treatment Re -Treat Chemicals used:O"✓l�^ Total gallons used: Time of Treatment: 15t Treatment Re -Treat Pools 3(15 z v" V `""a st Treatment 1 Treatment 1 Re -Treat Re -Treat Other meter for Final s ction 1 Treatment r r� Re -Treat signat a of ini for Note. There must be a completed farm for each required treatment orre- eatment and this form most be on the job site tp be picked up by the inspector at time of each inspection or the scheduled inspection will fall and a re -inspection fee charged. FBC1&.2.6 Certificate Of protective Treatment for prevention of termites A weather reslstantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each requ/red protective treatment is completed, providing a copy for the person the permit is Issued to and another copy for the bullding permit files The Treatment Cerdgcate shall provide the product used, Identity of ihe,applicator, time and date of the treatment, site locat/on, area treated, chemical used, percent concentration and number ofgalions used, to establtsh a verifiable record of prof five treatment. If the soil chemical barrier method for termite prevention is used, final exterlor treatment shall be completed prior to final build/ng approval. St Lucie County requires for the final inspection for Co, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.