Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 9-18-194W69��, - Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT N» BUILDER/CONTRACTOR: PEST 1CONTROL CONTRA PEST (CONTROL aq C®1°17tv ADDRESS:. 2 (p6re.3ASu�c e g r e ce 3xv; S We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: ADD Chemicals used: DOMINION 2L e of solution:.05% Date oi f Treatment: q1tJ12019 ooting 1st Treatment Re -Treat 5 1-t Treatment Re at �Oth'er 1st Treatment Re -Treat Total gallons used: 2C/ i Time of Treatment: Slab 1st Treatment Re -Treat Pools 1'� Treatment Re -Treat xxxxx Peri eter for Final Inspection -- .lg ! of Exterminator ` Date i Note: 'There must be a completed form for each requir treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charaed, FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, provi�ing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protec4ive treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revisedl7/24/2014 I